HomeMy WebLinkAbout1765 SANTA ANA AVE - Building Permits (20) LAFAYETTE PLACE
Formerly Martinique Gardens
Up_da_ti
09/25/97
Costa Mesa
Bldg. # Units Start Complete
Phase 1 11 9 04/24 08/22/97 I
(21) 12 8 04/29 08/22/97
10 4 05/05 08/22/97 I
15 4 I 05/16 09/27/97 I�
Phase 2 I 14 4 I 05/22 09/27/97 I
(36) 17 8 05/08 I 10/04/97 I
16 8 05/12 10/11/97 I
13 12 05/30 I 10/18/97
23 • 3 06/06 10/25/97
22 3 06/16 11/01/97
Phase 3 21 5 06/25 I 11/08/97
(26) 20 5 07/07 11/15/97
19 5 07/14 11/22/97
18 ' 5 07/21 11/29/97
9 4 07/31 I 12/06/97
8 4 08/11 j 12/13/97 I
Phase 4 7 4 08/18 I 12/20/97 I
(30) 6 4 I 08/26 I 12/27/97 I
3 7 09/0501/10/98 I
2 7 09/15 01/17/98 I
5 12 09/25 01/24/98
Phase 5 I 4 12 10/01 01/31/98 I
(32) 1 8 1 10/09 02/07/98
Rec/LO I 05/05 09/27/97
9-2971997 12:03PM FROM P. 9
09-29-97 11 :57AM FROM P05
TRI-N ENVIRONMENTAL SERVICES, INC.
HT -
F. Engineering 8 Environmental Services
Memo
To: Joe Sanfilippo
Ecom: Judy Rosner
CC: Ken Pruett
Darr: September 29. 1997
Re: Final Clearance Building 07
This memo is to confirm that final clearance air samples for the asbestos abatement in Building 07 were collected
on August 28. 1997. Air samples were analyzed in general accordance with the National Institute fire
Occupational Safety and Health (NIOSH) Method 7400. This method describes air sampling parameters and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400
describes a procedure which provides results that indicate approximate concentrations of any type of airborne
particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the
specified criteria are classified as fibers. The method does not count all fibers in all size ranges nor does it
differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's(EPA) Recommended clearance criterion of 0.01 floc.
Based on the laboratory results and our visual observations.this building is able to be occupied without respiratory
protection. If further asbestos abatement is performed in this building Tri-H should be notified to resample the air
prior to cy of the arra.
\ 11 c'tx-ELi%is
140 0tH L.H�7titT
. r- / ¢• � e.rPIRES 9
.A L. Hasmrr APR 01 1998
Principal Engineer
NO.93-0930
StArEOfCP
7007 Greenleaf Avenue, Suite 203 • Whittier. CA 90602 • Tel: 562.464.2420 • Fax: 562-464-2422
ADD REssO 9MLOQC: •1765 SANTA ANA AV UNT' BLD-7 CITY OF COSTA MESA — BUILDING PERMIT
OWNERS NA EimICON: BAY APARTMENT COMMUNITIES PERM NO: B 082649
...)&15n, 4340 STEVENS CREEK #275X
SAN JOSE,CA 95129 PERMIT NO: B 082649 PLAN CHECK NO: 01223-97 A GOVT: N SUPP : N
APPL.MMONG ADDRESS: CONSTRUCTION TYPE: V—N PERMIT TYPE: STR PURPOSE: ALT
ARCHITECT OR ENGINEER: MUSSER ARCHITECTS UCN0 C15234 JOB DESCRIPTION : APARTMENT FACADE UPGRADE SQ FT: 29 , 233
ARCN On ENG.'S ADDRESS: 151 KALMUS DR um, D-103
C .M . CA 92626 CLAIM VALUE: 29, 232 . 64 CALC—VALUE: 29, 233 . 00 GROUP OCC ; R-1 /
CONTRACTORS NAL :
carmACTORSSWUNG COMMENTS ; "MARTINIQUE GARDENS" FACADE UPGRADE
ADDRESS LIC NO.: ******************************************************************************k
WIT ZON ING REQUIREMENTS
UCENSED CONTRACTORS DECLARATION:I hereby eflim under penally of perjury that I am'Sneed under provisions of Chapter 9 S ETB AC K S
(commencing with Section 7000)of Division 3 d the Business and Professions Code.and my Weise is in hill force end Sled.
CITYUc.No.: UC.CLASS: UC.NO.: EXP : -- MAIN BUILDING ACCESSORY BUILDING
FRNT: FT IN REAR: FT IN FRNT: FT IN REAR: FT IN
. Dale: Contractor. LEFT: FT IN RGHT: FT IN LEFT: FT IN RGHT: FT IN
WNER BUILDER DECLARATION:I hereby affirm under penally of perjury that I am exempt from the Contractors License Law for the
following reason(Section 7031.5 Business and Professions Code:Any city or county which requires a permit to canimd,alter,improv, PARKING REQ: P RO V; PARCEL: 42546217 Z N E: R 2 MD REF NO: PA9 7 0 5
I demolish,or repair any structure.prior to is issuance.also requires the applicant for such permit to file a signed sW ement that he or she Q
licensed pursuant totheprovisoalh
provisions of osLicense Law(Chapter s(mmmendngwith Section 7000)ofDwnian3ofthe PLANNING NOTES> UPGRADES/IMPROVEMENTS (NO ADDL SO O FT OR BDRMS) TO EX APT .
eines,and Professions Carel or dud he a she a exempt therefore and the basis la the
M
lo alleged exemption.My violation of Section > BLDG AT MARTINIQUE GARDENS APT COMPLEX
.,31.5 by anyapplicant for a permit subjects the applicant toe civil penally of not more then e hundred dollars[S500)). ******************************* ************************************{k**dL•i/�*******
pi I,as owner of the property or my employees with wages actthersole compensation,will dothe soak,and the structure anorintended D E V E L O P M E N T S E R V I C E S R E Q U I R E M E N:•T ;$i"
or offered for sale(Section 7044.Business and Professions Code:The Contractors License Law does not apply to an Owner or properly n
•
who builds or improves thereon,end who does such work himself or hese)or through his or her own employees,provided that such ,d r
improvements are not intended or armed for sale.Il,however,the building or knpmvement is sold within ohne year of completion.the ZONING APPROVED BY C C`n DATE: ,.'e
Mor
ownerbuilder will have the burden of proving he or she did notildimprove for of the purpose e).
O I.ea owner of the properly,am exclusively contracting with licensed contractors to construct the en 7044.Business and r d !�y
Professions Code:The Contractors License Lew does not appy to an owner d property improves thereon and who BUILDING APPROVED BY : V Vr r DATE: • C.:e 3. I'
contracts for such projects with a coneactor(s)licensed pursuant the Contractors License / . • r , •
', - exempt APPLICATION ISSUED BY; DATE: '.
/%J� ********************** *******************if**
Owner +� �i LEGALIZATION: N F E E S U M M A R Y STRUCTURAL� SEGMENT:Y
•hereby certify that I em aware d end understand •tri- ,d Cellmde Health and 45533.end
25534,and that I or any Muni building occupant ori wit nil(. le one)need to comply with ' r •I•�requirements for
a pemia for costrcton«modifcatonhanlhe A' •'tn yr, '•amen District.Residential applications are exempt from these BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/RES GRADING
provisions. PERMIT 394 . 75 2 . 92
Date: Appfcas: SMIP/NON—RES
WORKER'S COMPENSATION DECLARATION:I hereby elftm wider penally derp
pry one et the following declarations: PLAN 64 . 15
ISSUE FEE
O I have end Val TOSS A COdifiCaiti 01 consent to self4nsure for workers'oompansation.es provided for bySection 3700dtheLabor BUILDING—DIV—> PERMIT ISSUE PLAN—CHECK TOTAL PAID DUE
Code,for the performance of the work to which this permit is issued.
0 Ihaandarilmantonwan
workers' es
compensation TOTALS > 397 . 67 0 . 00 64 . 15 461 . 82 461 . 82 . 00
w
work for which this permit is issued.My workers'compensation insurance carver and poky ambo are:
REVENUE DIVISION TOTALS--> COLLECTED : 397 . 67 OVER/SHORT: . 00
Perry Number. BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/TOT GRADING PLAN—CHECK
This stolon need not be completed I the coma is to,one hundred dollars RIO0)or less.) 394 , 75 2 . 92
O I Porth that in the perlomence of the work for which the wee is issued,I shall ret employ any person in arty manner so as to
become subject
subject to the workers'compensation taws of California.and agree talf l should become subject to the waken * * *
' *************** ********************************************************** ***
canpensaton provisions of Sedlon 3700 a the Labor Cote.I shell forthwith comply with those NDIVIDUALprovisions. IV I D U A L F E E B R E A K D O W N
Date:
Applicantw
Warning:Failure to secure workers'compentlon coverage Is unlawful,and shall subject an employer to criminal penalties and TYPE QTY D E S C R I P T I O N UNIT' COST TOTAL COST
civilMies to es rptone hundred thousand dollars($10[{000),in addition to the nest of comperwtion,damages es provided for in
Seam 3106 of the Labor Cob,Interest,and atromry's feet SFR 29233 ALTER BY VALUE RESIDENTIAL NOZONE 7 . 00 29, 233 , 00
CONSTRUCTION LENDING AGENCY: I hereby Wim under penalty of perjury that there is e construction lending agency for the END OF FEES ,
perfo •
rmance of the work for Which this permitisissued(Section 3097,CM.C).
'
LENDER'S NAME: ;
LENDER'S ADDRESS: {{ ii{
I ceniy that l have read this application and dale that the above information is correct.l agree to comply with all city and county ordinances ' 1 n- 1 j ;'
.,4, and state taws reelect to building construction and hereby authorize representatives of this city to enter upon the above-mentioned property �. fy;:ti us iy51
for inspection Purposes.
Jr)i; r P1L•'ILIPPO
•
®PrintN• •. CID6OE COSTA MESA
1 oared; �. Data:
S�/
G/ ` ' .✓ 1 trmor .V
(5151'45.W P) While-Su •&Safety:Green-Rte:Canary-Applicant Pink-Revenue: old
Genrod-Assesr
1
CONSTRUCTION AND PLANNIN. .- JL 'A
APPROVALS Permit# Date Inspector APPROVALS Permit # - Date Inspector
llTemporary Electrical Service or Pole 52: Pool & Equipment Location
• 2Z Soil Pipe•Undrgrnd. 53. Steel Reinforcement
3. Electrical Conduit Utility-Undrgrnd. 54. Forms
4. Electrical Conduit-Undrgrnd. 55. Electrical Bonding
5. Steel Reinforcement 56. Rough Plumbing & Pressure Test
6. Electrical UF ER Grnd. 57. APPROVAL TO COVER-GUNITE
7. Footings 58. Electrical Conduit-Undrgrnd.
8. Foundation 59. Gas Pipe, 0 Undrgrnd.,Test
9. Water Pipe-Undrgrnd. 60. Backwash Lines, P-Trap, 0 Undrgrnd. •
10. Structural Floor System 61. APPROVAL TO DECK
11. Property Sewer Line & House Connection 62. Backwash & Receptor-Final
12. Sewer Cap - 63. Heater & Vent-Final
13. Roof Drains 64. Plumbing System • Final
14. Rough Plumbing 65. Electrical-Final
15. Rough Electrical-Conduit 66. Solar System-Final
16. Rough Electric Wiring i 67. Fencing & Access Approval
17. Rough Wiring Sign 68. APPROVED FOR PLASTERING
18. Rough Electrical-7 Bar Ceiling 69. POOL/SPA SYSTEMS FINAL
19. Rough Heating & Air Conditioning FIRE DEPT. REQUIREMENT
20. Rough Factory Fireplace APPROVALS Permit#
21. Ducts,in Structure 70. Underground Hydro
22. Ducts, Ventilating 71. Product Piping 0 Gas 0 Oil
23. Gas Pipe-Rough & Test 72. Underground Flush
24. Roof Framing 73. Undergrnd.Storage Tank 0 Gas 0 Oil
25. Roof Sheathing 74. Overhead Hydro
26. T-Bar Ceiling (Structural) & Monocoat 75. Dry Chemical
27. Frame and Flashing 76. Dry Standpipe
28. Lathing& Siding 77. FIXED SYSTEM FINAL
29. Insulation 78. FIRE PREV. FINAL
30. Drywall Nailing HEALTH DEPT. REQUIREMENT
31. Plaster Brown Coat 79. FINAL INSPECTION
32. Electrical Power Meter-Final 80. FOOD CERTIFICATE ISSUED
33. Final Electric Notes:
34. Final Heating& Air Conditioning
35. Final Gas Pipe-Test
36. Hood or Canopy •
37. Final Factory Fireplace _
38. Final Plumbing
39. Water Service-Final
40. Gas Service-Final
41. Solar Domestic-Final
42. Backflow Preventer •
43. Backflow Irrigation
44. Landscape Irrigation System
45. Sound Attenuation
46. Handicap Regulations
47. FINAL STRUCTURE & BUILDING ///y/n
48. FINAL PLANNINGG
49. Electric Release to Edison
50. Gas Release to Southern California Gas Co
51. CERTIFICATE OF OCCUPANCY
No. Date
11-07-1997 9: 15AM FROM P. 8
}
.J P06
TRI-H ENVIRONMENTAL SERVICES, INC.
Engineering a Environmental Services
Memo
Tv: Joe Sanfilippo
Fran: Judy Hwner
CC: Ken Pruett
Oat September 29, 1997
Re: Final Clearance Building#7
This memo Ls to confirm that final clearance air samples for the asbestos abatement in Building 97 were collected
on August 28, 1997. Air samples were analyzed in general accordance with the National Institute for
Occupational Safety and Health(NIOSH) Method 7400. This method describes air sampling parameters and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The N1OSH Method 7400
describes a procedure which provides results that indicate approximate concentrations of any type of airborne
particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the
specified criteria are classified as fibers. The method does not count all fibers in all size ranges nor does it
differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work arms met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's(EPA) Recommended clearance criterion of 0.01 f/cc.
•
Based on the laboratory results and our visual observations, this building is able to be occupied without respiratory
protection. If further asbestos abatement is performed in this building Tri-H should be notified to resample the air
` --Prior robccunancy of the arra.
\ SBEST S
\\ e ti�J��� �i4Lrfi�t.. `tfrOJ iter L.NOs4:040
XPIRES P
cc
' L. Hemet w
Principal Engineerv APR 0 1 1998
NO.93-0930
STgrEOFGP
7007 Greenleaf Avenue, Suite 203 • Whittier. CA 90602 • Tel: 562.464-2420 • Fax:562.484.2422