Loading...
HomeMy WebLinkAbout- - Bid Abstract Attachment II - 1/19/2010rte Cr: Run CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES ROADWAY REHABILITATION OF SANTA ANA AVENUE FROM 17TH ST TO 22ND ST FEDERAL PROJECT NO. ESPL 5312(074) CITY PROJECT NO. 09-14 BID OPENING DATE: SEPTEMBER 8, 2009 CITY ESTIMATE NO. BID QUANTITY DESCRIPTION UNIT PRICE TOTAL 1 1 LS Mobilization $27,000.00 $27,000.00 2(F) 2,430 CY Unclassified Excavation(Roadway Only) $30.00 $72,900.00 3 3,320 TON Asphalt Rubber Hot Mix ARHM $80.00 $265,600.00 4 6,135 TON Asphalt Concrete Base Course $65.00 $398,775.00 5 34 EA Adjust Manhole to Grade $500.00 $17,000.00 6 64 EA Ad'ust Water Valve to Grade $350.00 $22,400.00 7 1 455 LF Horizontal Sawcut $25.00 $11,375.00 8 1,200 SF Remove Exist & Const 6" PCC Driveway $13.00 $15,600.00 9 1,480 SF Remove Exist. & Constr. 8" PCC X -Gutter and Spandrel $25.00 $37,000.00 10 625 LF Remove Exist & Constr. PCC Type C-8 Curb & Gutter $45.00 $28125.00 11 1,865 SF Remove Exist. & Constr. 4" PCC Sidewalk $10.00 $18,650.00 12 37 EA Remove Exist. & Constr. PCC Curb Ramp $3,000.00 $111,000.00 13 27 EA Reset Existing Survey Monuments and Ties $1,000.00 $27,000.00, 14 159,500 SF Cold Mill AC 4" $0.35 $55,825.00 15 710 LF Remove Exist & Const PCC Type C-6 Curb & Gutter $42.00 $29,820.00 16 17 EA Install Truncated Domes 4'x3' $700.00 $11,900.00 17 72 LF Grind Curb to 0" Li $25.00 $1,800.00 18 450 SF Remove & Reconstruct Alley Approach $13.00 $5,850.00 19 10 EA Install RBPM $10.00 $100.00 20 1 LS Traffic Control & Temporary Striping $30,000.00 $30,000.00 21 1 LS Traffic Striping, Pavement Marking and Signs $18,430.00 $18,430.00 22 10 EA Install Traffic Signal Loop Detectors $400.00 $4,000.00 23 13,000 LF Paint Curb Red $2.00 $26,000.00 24 10,400 SY Sub rade Stabilization Geotextile FabricMirafi 600X $1.00 $10,400.0 25 28,200 SY Pavement En ineedn Fabric Petromat $1.00 $28,200.00 26 100 CY Overexcavation $35.00 $3,500.00 27 200 1 TON ICrushed Miscellaneous Base for Overexcavation $30.00 $6,000.00 28 1 1 FA IGrind U lifted Sidewalk $10,000.001 $10,000.00 BASE BID TOTAL: $1,294,250.00 RAC= Rin rlry ecrl..wre NO. BID QUANTITY DESCRIPTION UNIT PRICE TOTAL 1 1 LS Mobilization $27000.00 $27,000.00 2(F) 2,430 CY Unclassified Excavation(Roadway Only) $30.00 $72,900.00 3 3,320 TON Asphalt Rubber Hot Mix ARHM $80.00 $265,600.00 4 6,135 TON Asphalt Concrete Base Course $65.00 $398,775.00 5 34 EA Adjust Manhole to Grade $500.00 $17,000.00 6 1 64 EA Adjust Water Valve to Grade $350.001 $22,400.00 7 455 LF HorizontalSawcut $25.00 $11,375.00 8 1,200 SF lRemove Exist. & Const PCC Driveway $13.00 $15 600.00 9 1,480 SF lRemove Exist. & Constr. 8" PCC X -Gutter and Spandrel $25.00 $37,000.00 10 625 LF Remove Exist & Constr. PCC C-8 Curb & Gutter $45.00 $28125.00 11 1,865 SF Remove Exist. & Constr. 4" PCC Sidewalk $10.00 $18,650.00 12 37 EA Remove Exist. & Constr. PCC Curb Ramp $3,000.00 $111,000.00 13 27 EA Reset Existing Survey Monuments and Ties $1,000.00 $27,000.00 14 159,500 SF Cold Mill AC 4" $0.35 $55,825.00 15 710 LF Remove Exist. & Const PCC C-6 Curb & Gutter $42.00 $29,820.00 16 17 EA Install Truncated Domes 4'x3' $700.00 $11,900.00 17 72 LF Grind Curb to V'Lip $25.00 $1,800.00 18 450 SF lRemove & Reconstruct Alley Approach $13.00 $5,850.00 19 10 EA llnstall RBPM $10.00 $100.00 20 1 LS Traffic Control & Temporary Striping $30 000.00 $30.000.00 21 1 LS Traffic Striping, Pavement Marking and Signs $18,430.00 $18,430.0 22 10 EA Install Traffic Signal Loop Detectors $400.00 $4,000.00 23 13,000 LF Paint Curb Red $2.00 $26,000.0 24 10,400 SY Sub rade Stabilization Gectextile FabricMirafi 600X $1.00 $10,400.00 25 28,200 SY Pavement Engineering Fabric Petromat $1.00 $28,200.00 26 100 CY Overexcavation $35.00 $3,500.00 27 200 TON Crushed Miscellaneous Base for Overexcavation $30.00 $6,000.00 28 1 1 FA IGrind Uplifted Sidewalk $10,000.00 $10,000.00 BASE BID TOTAL: $1,294,250.00 1. R. J. NOBLE COMPANY UNIT PRICE TOTAL $29,000.00 $29 000.00 $32.00 $77,760.00 $70.00 $232,400.00 $52.35 $321,167.25 $461.00 $15,674.00 $415.00 $26,560.00 $20.601 $9,373.00 $13.801 $16560.00 $18.851 $27898.00 $54.601 $34125.00 $9.20 $17,158.0 $2,200.00 $81,400.00 $232.00 $6,264.00 $0.12 $19,140.00 $52.00 $36,920.00 $575.00 $9,775.00 $12.35 $889.20 $15.95 $7,177.50 $10.301 $103.00 $7.000.001 $7,000.00 $11,520.00 $11,520. $268.00 $2,680.00 $0.40 $5,200.0 $0.71 $7,384.00 $0.09 $2,538.00 $14.00 $1,400.00 $6.55 $1,310.00 $10,000.00 $10 000.00 $1,018,375.95 4. IMPERIAL PAVING CO., UNIT PRICE TOTAL $48,000.00 $48,000.00 $32.00 $77,760. $79.00 $262,280.00 $64.00 $392,640.00 $675.00 $22,950.00 $625.00 $40,000.00 $5.00 $2,275.00 $11.00 $13200.00 $14.00 $20,720. $28.00 $17,M $8.00 $14,920. $2,650.00 $98,050.0 $225.00 $6.075.00 $0.27 $43,065.00 $26.00 $18,460.00 $450.00 $7,650.00 $15.00 $1,080.00 $14.00 $6,300.00 $5.00 $50.00 $54,000.00 $64.000.00 $12,000.00 $12,000.00 $268.001 $2,680.00 $0.51 $6,630.00 $1.00 $10400.00 $1.00 $28,200.00 $20.00 $2,000.00 $10.00 $2,000.00 $10,000-I. $10 000.00 $1,220,885.00 2. ALL AMERICAN ASPHALT UNIT PRICE TOTAL $38,300.0 $38,300.00 $30.00 $72,900.00 $75.00 $249,000.00 $59.00 $361965.00 $500.00 $17000.00 $375.00 $24.000.00 $14.001 $6,370.00 $10.001 $12,000.00 $11.00 $16280.00 $52.00 $32,500.00 $7.00 $13055.00 $2,250.00 $83,250.00 $250.00 $6,750.00 $0.18 $28,710.00 $38.00 $26,980.00 $350.00 $5,950.00 $16.00 $1,152.00 $10.00 $4,500.00 $10.00 $100.00 $38,064.50 $38.064.50 $11,516.50 $11,516.50 $240.00 $2,400.00 $0.40 $5,200.00 $1.19 $12,376.00 $0.40 $11280.00 $55.00 $5,500.00 $10.001 $2,000.00 $10 nnn mi $10 000.00 $1,099,099.00 5. SEQUEL CONTRACTORS, UNIT PRICE TOTAL $60,000.00 $60,000.00 $58.00 $140,940.00 $68.00 $225,760.00 $58.00 $355,830.00 $400.00 $13600.00 $150.00 $9,600.00 $5.001 $2,275.00 $11.00 $13,200.0 $15.00 $22200.00 $44.00 $27,500.0 $7.00 $13055.00 $3200.00 $118,400.00 $225.00 $6,075.00 $0.40 $63,800. $42.00 $29,820.0 $400.00 $6,800.00 $10.00 $720.00 $10.00 $4 500.00 $10.00 $100.00 $42,600.00 $42.600.00 $12,000.00 $12,000.0 $250.00 $2,500.00 $0.60 $7,800.00 $1.50 $15600.00 $0.90 $25,380.0 $30.00 $3,000.00 $40.00 L$10 $8,000.00 000.00 $10 000.00 $1,241,055.00 3. ELITE BOBCAT SERVICE, INC. UNIT PRICE TOTAL $37.000.001 $37,000.00 $34.00 $82,620.00 $78.00 $258,960.00 $55.00 $337,425.00 $700.00 $23,800.00 $650.00 $41600.00 $18.00 $8190.00 $11.50 $13,800.00 $15.501 $22 940.00 $39.50 $24,687.50 $7.50 $13,987.50 $1,250.00 $46,250.00 $250.00 $6,750.00 $0.40 $63,800.0 $36.50 $25,915.0 $550.00 $9,350.00 $15.00 $1,080.00 $14.001 $6,300.00 $10.001 $100.00 $25,000.001 $25,000.00 $12,000.00 $12,000.00 $225.00 $2,250.00 $0.41 $5,330.00 $0.75 $7 800.00 $1.10 $31,020.00 $20.00 $2,000.00 $15.00 $3,000.00 $10,000.00 $10 000.00 $1,122,955.00 Average UNIT PRICE TOTAL $42,460.00 $42,460.00 $37.20 $90,396.00 $74.00 $245,680.00 $57.67 $353,805.45 $547.20 $18,604.80 $443.00 $28,352.00 $12.52 $5,696.60 $11.46 $13,752.00 $14.87 $22,007.60 $43.62 $27,262.50 $7.74 $14,435.10 $2.310.00 $85,470.00 $236.40 $6,382.80 $0.27 $43,703.00 $38.90 $27,619.00 $465.00 $7.905.00 $13.67 $984.24 $12.79 $5,755.50 $9.06 $90.60 $33,332.90 $33,332.90 $11,807.30 $11,807.30 $250.20 $2,502.0 $0.46 $6,032.00 $1.03 $10,712.00 $0.70 $19683.60 $27.80 $2,780.00 $16.31 $3262.00 $10,000.00 $10000.00 $1,140,473.99 D n K M Z A