RECOMMENDATION:
1. Accept the work performed by Terra Pave, Inc., and authorize the City Clerk to file the Notice of
Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful
Performance Bond one (1) year after the filing date; and release the retention monies 35 days
after the Notice of Completion filing date.
BACKGROUND:
On October 6, 2009, a construction contract was awarded to Terra Pave, Inc., 11925 Los Nietos
Road, Santa Fe Springs, California, 90670.
The work performed under this contract included the rehabilitation of Magnolia Street from the Vehicle
Parking District to Fullerton Avenue; reconstruction of the public parking areas; and reconstruction of
the alley adjacent to the parking areas.
Before Rehabilitation
Rehabilitation Completed
1
ANALYSIS:
The work required by the contract documents was completed on January 31, 2010, to the satisfaction
of the City Engineer. The final contract cost amounted $292,744.92. A report of the final costs is
shown herein as Attachment "1 ".
A summary of the costs is as follows:
Original Contract Cost: $367,694.75
Quantity Adjustment: ($ 74,949.83)
Final Contract Cost: $292,744.92
The final contract price reflects a twenty percent (20%) decrease to the original contract as a result of the
quantity adjustment.
As of this date, there are no Stop Notices filed against the monies due to Terra Pave, Inc.
ALTERNATIVES CONSIDERED:
There were no alternatives considered for this item.
FISCAL REVIEW:
There is no fiscal impact due to this item.
LEGAL REVIEW:
There is no legal review required on this item.
CONCLUSION:
The rehabilitation of Vehicle Parking Lot District No. 1 has been completed. It is recommended that
the City Council authorize staff to file the Notice of Completion; release the remaining retention
monies 35 days after the Notice of Completion filing date; and release the bonds accordingly.
ERNESTO MUIVOZ
City Engineer
ATTACHMENT: "1" Cost Summary
PETER NAGHAVI, Director
Department of Public Services
DISTRIBUTION: City Manager
City Attorney
City Clerk
Acting Development Services Director
Staff
File
E
GQ
H
Z.
W
U
Q
~ CITY OF COSTA MESA
Q 2/19/10 DATE: 02/16/10
FOR PAYMENT ON THE WARRANT LIST OF
PAGE: 1 OF 1
3RD Payment to: TERRA PAVE, INC.
11925 Los Nietos Rd., Santa Fe Springs CA 90670
PERIOD ENDING: 01/15/10
PROJECT: REHABILITATION OF PARKING LOT DISTRICT NO. 1
City Project No. 09.20
DESCRIPTION
Mobilization
Unclassified Excavation (Roadway only)
Asphalt Concrete Surface Course
Asphalt Concrete Base Course
6" PCC Pavement with 10x10x8 Wire Mesh
Remove Exist. &Const. Curb and Gutter Type "C 6"
Remove Exist, & Construct New 4" PCC Sidewalk
Remove Exist, and Construct 6" PCC Driveway Approach
Remove and Reconstruct 8" PCC Cross Gutter &Spandrel
Remove Exist. & Construct 8" PCC "V" Gutter
Remove and Reconstruct B" PCC Alley Intersection
Remove Exist. & Construct Type "B" Curb
Construct Parkway Drain
Adjust Manhole Frame and Cover to Grade
Adjust Water Valve Can and.Coverto Grade
Install Traffic Striping, Signing, Pavement Legends and RPMs
Install Reflective BLUE Raised Pavement Markers (BRPM)
Traffic Control and Temporary Striping
Set New or Reset Existing Survey Monuments and Ties
Protect Management
Unclassified Excavation/Overexcavation
CMB/Overexcavation
Subgrade Stabilization Fabric (Mirafl 600x)$20.00
UNIT
PRICE
$22,000.00
$56.00
$71.00
$71.00
$5.25
$24.50
$5.10
$7.00
$8.75
$8.75
$9.00
$20.00
$3,500.00
$450.00
$250.00
$6,000.00
$1o.00
$3,000.00
$400.00
$40,000.00
$60.00
$30.00
PREVIOUS
QUANTITY
100.00 %
694.00 CY
565.87 TON
566.81 TON
8,965.00 SF
594.00 LF
2,217.00 SF
1,887.00 SF
758.00 SF
696.00 SF
178.00 SF
266.00 LF
0 EA
4 EA
6 EA
100.00 %
2 EA
100.00 %
0 EA
0.27 FA
0.00 CY
0,00 TON
0.00 BY
QUANTITY
THIS ESTIMATE
0 %
0.00 CY
0.00 TON
0.00 TON
47.50 SF
20.00 LF
100,00 SF
0.00 SF
0.00 SF
0.0o SF
0.00 SF
0.00 LF
0.4 EA
0 EA
0 EA
0
0 EA
0 %
0 EA
0.49 FA
0.00 CY
0.00 TON
0.00 SY
TOTAL QUANTITY
TO DATE
100 %
694.00 CY
565.87 TO
566.81 TON
9,012.50 SF
614.00 LF
2,317.00 SF
1,887.00 SF
758.00 SF
696.00 SF
178.00 SF
266.00 LF
0.4 EA
4 EA
6 EA
100 %
2 EA
100 %
0 EA
0.77 FA
0.00 CY
0.00 TON
PROJECT TOTAL:
PREVIOUS
AMOUNT
$22,000.00
$38,864.00
$40,176.77
$40,243.51
$47,066.25
$14,553.00
$11,306.70
$13,209.00
$6,632.50
$6,090.00
$1,602.00
$5,320.00
$0.00
$1,800.00
$1,500.00
$6,000.00
$20.00
$3,000.00
$0.00
$10,844.50
$o.00
$0.00
$270,228 23
AMOUNT
THIS EST
$0.00$22,000.00
$0.00
$0.00
$0.00
$249.38
$490.00
$510.00
$0.00_$13,209.00
$0.00
$0.00
$0.00
$0.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$19,767.31
$0.00
$0.00
$22,516 69
TOTAL
TO GATE
$38,864.00
$40,176.77
$40,243.51
$47,315.63
$15,043.00
$11,816.70
$6,632.50
$6,090.00
$1,602.00
$5,320.00
$1,500.00
$1,800.00
$1,500.00
CONTRACT
PRICE
$22,000.00
$38,864.00
$41,748.00
$70,645.00
$51,581.25
$17,787.00
$12,724.50
$17,920.00
$6,693.75
REM ESD
1 10aNTIT
IS
2(F) 694
CY
3 5-88
TON
4 995
TON
5 9,825
5726
SF
LF
7 2,495
SF
8 2,560
SF
9 765
10 835
SF
SF
$7,306.25
$3,105.00
$6,300.00
$10,500.00
$1,800.00
$2,000.00
11 345
SF
12 315
LF
13 3
EA
14 4
EA
15 8
EA
$6,000.00
$6,000.00
15 1
LS
$20.00
$3,0$0.00
$0.00
$30;611.81
$0.00
$0.00
$292,744 92
$20.00
$ $800.00
$800.00
$40,000.00
$4,200.00
$2,100.00
$367,694.75
17 2
EA
18 1
LS
19 2
EA
20 1
FA
21 70
CY
22 70
TON
23 30
SY