HomeMy WebLinkAbout02 - CC-7 - Rehab of Vehicle Parking District No.1 - 4/6/2010CITY COUNCIL AGENDA REPORT MEETING DATE: APRIL 6, 2010 ITEM NUMBER: SUBJECT: REHABILITATION OF VEHICLE PARKING DISTRICT NO. 1 - CITY PROJECT NO. 09-20 DATE: MARCH 25, 2010 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: PETER NAGHAVI, DIRECTOR, DEPARTMENT OF PUBLIC SERVICES FOR FURTHER INFORMATION CONTACT: ERNESTO MUNOZ, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by Terra Pave, Inc., and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On October 6, 2009, a construction contract was awarded to Terra Pave, Inc., 11925 Los Nietos Road, Santa Fe Springs, California, 90670. The work performed under this contract included the rehabilitation of Magnolia Street from the Vehicle Parking District to Fullerton Avenue; reconstruction of the public parking areas; and reconstruction of the alley adjacent to the parking areas. Before Rehabilitation Rehabilitation Completed 1 ANALYSIS: The work required by the contract documents was completed on January 31, 2010, to the satisfaction of the City Engineer. The final contract cost amounted $292,744.92. A report of the final costs is shown herein as Attachment "1 ". A summary of the costs is as follows: Original Contract Cost: $367,694.75 Quantity Adjustment: ($ 74,949.83) Final Contract Cost: $292,744.92 The final contract price reflects a twenty percent (20%) decrease to the original contract as a result of the quantity adjustment. As of this date, there are no Stop Notices filed against the monies due to Terra Pave, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: There is no fiscal impact due to this item. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The rehabilitation of Vehicle Parking Lot District No. 1 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. ERNESTO MUIVOZ City Engineer ATTACHMENT: "1" Cost Summary PETER NAGHAVI, Director Department of Public Services DISTRIBUTION: City Manager City Attorney City Clerk Acting Development Services Director Staff File E GQ H Z. W U Q ~ CITY OF COSTA MESA Q 2/19/10 DATE: 02/16/10 FOR PAYMENT ON THE WARRANT LIST OF PAGE: 1 OF 1 3RD Payment to: TERRA PAVE, INC. 11925 Los Nietos Rd., Santa Fe Springs CA 90670 PERIOD ENDING: 01/15/10 PROJECT: REHABILITATION OF PARKING LOT DISTRICT NO. 1 City Project No. 09.20 DESCRIPTION Mobilization Unclassified Excavation (Roadway only) Asphalt Concrete Surface Course Asphalt Concrete Base Course 6" PCC Pavement with 10x10x8 Wire Mesh Remove Exist. &Const. Curb and Gutter Type "C 6" Remove Exist, & Construct New 4" PCC Sidewalk Remove Exist, and Construct 6" PCC Driveway Approach Remove and Reconstruct 8" PCC Cross Gutter &Spandrel Remove Exist. & Construct 8" PCC "V" Gutter Remove and Reconstruct B" PCC Alley Intersection Remove Exist. & Construct Type "B" Curb Construct Parkway Drain Adjust Manhole Frame and Cover to Grade Adjust Water Valve Can and.Coverto Grade Install Traffic Striping, Signing, Pavement Legends and RPMs Install Reflective BLUE Raised Pavement Markers (BRPM) Traffic Control and Temporary Striping Set New or Reset Existing Survey Monuments and Ties Protect Management Unclassified Excavation/Overexcavation CMB/Overexcavation Subgrade Stabilization Fabric (Mirafl 600x)$20.00 UNIT PRICE $22,000.00 $56.00 $71.00 $71.00 $5.25 $24.50 $5.10 $7.00 $8.75 $8.75 $9.00 $20.00 $3,500.00 $450.00 $250.00 $6,000.00 $1o.00 $3,000.00 $400.00 $40,000.00 $60.00 $30.00 PREVIOUS QUANTITY 100.00 % 694.00 CY 565.87 TON 566.81 TON 8,965.00 SF 594.00 LF 2,217.00 SF 1,887.00 SF 758.00 SF 696.00 SF 178.00 SF 266.00 LF 0 EA 4 EA 6 EA 100.00 % 2 EA 100.00 % 0 EA 0.27 FA 0.00 CY 0,00 TON 0.00 BY QUANTITY THIS ESTIMATE 0 % 0.00 CY 0.00 TON 0.00 TON 47.50 SF 20.00 LF 100,00 SF 0.00 SF 0.00 SF 0.0o SF 0.00 SF 0.00 LF 0.4 EA 0 EA 0 EA 0 0 EA 0 % 0 EA 0.49 FA 0.00 CY 0.00 TON 0.00 SY TOTAL QUANTITY TO DATE 100 % 694.00 CY 565.87 TO 566.81 TON 9,012.50 SF 614.00 LF 2,317.00 SF 1,887.00 SF 758.00 SF 696.00 SF 178.00 SF 266.00 LF 0.4 EA 4 EA 6 EA 100 % 2 EA 100 % 0 EA 0.77 FA 0.00 CY 0.00 TON PROJECT TOTAL: PREVIOUS AMOUNT $22,000.00 $38,864.00 $40,176.77 $40,243.51 $47,066.25 $14,553.00 $11,306.70 $13,209.00 $6,632.50 $6,090.00 $1,602.00 $5,320.00 $0.00 $1,800.00 $1,500.00 $6,000.00 $20.00 $3,000.00 $0.00 $10,844.50 $o.00 $0.00 $270,228 23 AMOUNT THIS EST $0.00$22,000.00 $0.00 $0.00 $0.00 $249.38 $490.00 $510.00 $0.00_$13,209.00 $0.00 $0.00 $0.00 $0.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $19,767.31 $0.00 $0.00 $22,516 69 TOTAL TO GATE $38,864.00 $40,176.77 $40,243.51 $47,315.63 $15,043.00 $11,816.70 $6,632.50 $6,090.00 $1,602.00 $5,320.00 $1,500.00 $1,800.00 $1,500.00 CONTRACT PRICE $22,000.00 $38,864.00 $41,748.00 $70,645.00 $51,581.25 $17,787.00 $12,724.50 $17,920.00 $6,693.75 REM ESD 1 10aNTIT IS 2(F) 694 CY 3 5-88 TON 4 995 TON 5 9,825 5726 SF LF 7 2,495 SF 8 2,560 SF 9 765 10 835 SF SF $7,306.25 $3,105.00 $6,300.00 $10,500.00 $1,800.00 $2,000.00 11 345 SF 12 315 LF 13 3 EA 14 4 EA 15 8 EA $6,000.00 $6,000.00 15 1 LS $20.00 $3,0$0.00 $0.00 $30;611.81 $0.00 $0.00 $292,744 92 $20.00 $ $800.00 $800.00 $40,000.00 $4,200.00 $2,100.00 $367,694.75 17 2 EA 18 1 LS 19 2 EA 20 1 FA 21 70 CY 22 70 TON 23 30 SY