HomeMy WebLinkAbout- - Cost Summary Attachment 1 - 6/1/2010COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 05/15/10 DATE: 05/05/10 PAGE: 1 OF 1 4th Payment to: R. J. NOBLE 15505 E. LINCOLN AVE., ORANGE, CA 92865 PROJECT: REHABILITATION OF S. COAST DR. FROM FAIRVIEW RD. TO CARMEL DR. AND SAN LEANDRO LN. TO BEAR ST. PERIOD ENDING: 03/31/10 City Project No. 09-11 ITEM BID UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY To DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE NO QUANTITY DESCRIPTION $55,000.00 100.00 % 0.00 % 100.00 % $55,000.00 $0.00 $55,000.00 $55,000.00 1 1 10,120 3,540 19,100 3 000 5 6 31 LS Mobilization CY Unclassified Excavation(Roadway only) TON Asphalt Rubber Hot Mix ARHM TON As halt Concrete Base Course DGAC) SF Cold Mill min. 2" EA Adjust Sewer manhole frame and cover to grade EA Ad'ust Storm Drain manhole frame and cover to rade EA Adjust water valve can and cover to grade $25.00 $69.00 $58.50 $1.15 $330.00 $330.00 $375.00 10 120.00 CY 2,866,66 TON 14,479.29 TON 2 000.00 SF 5.00 EA 5.00 EA 31.00 EA 0.00 CY 10.00 TON 0.00 TON 0.00 SF 0.00 EA 0.00 EA 0.00 EA 10 120.00 CY 2,876.66 TON 14 479.29 TON 2,000.00 SF 5.00 EA 5.00 EA 31.00 EA $253,000.00 $197,799. $847,038.47 $2,300.00 $1,650.00 $1,650.00 $11625.00 $0.00 $690.00 $0.00 $0.00 $0.00 $0.00 $0.00 $253,000.00 $198 489.54 $847,038.47 $2,300.00 $1,650.00 $1,650.00 $11625.00 $253,000.00 $244,260.00 $1,117,350.00 $3,450.00 $1,650.00 $1,980.00 $11,625.00 2(F) 3 4 5 6 7 8 9 965 LF Reconstruct Type "C-8" Curb and Gutter (including 6" CMB & $27,00 800.00 LF 0.00 LF 800.00 LF $21,600.00 $0.00 $21,600.00 $26,055.00 excavation 10 12 EA Sawcut & Remove Existing and construct New P.C.C. Curb 0.00 EA 12.00 EA $28,800.00 $0.00 $28,800.00 $28,800.00 Ramp (including Retaining Curb, 4" CMB & excavation) $2,400.00 12.00 EA 11 36 LF Horizontal Sawcut $21.00 33.00 LF 0.00 LF 33.00 LF $693.00 $0.00 $693.00 $0.00 $756.00 $900.00 12 20 LF Grind Lip to 0" Curb Face $45.00 0.00 LF 0.00 LF 0.00 LF $0.00 $0.00 13 4 EA Install Detectable Warning Surface on Existing Ramps $320.00 4.00 EA 0.00 EA 4.00 EA $1,280.00 $0.00 $1,280.00 $1,280.00 Truncated Domes 4'x3' 14 60 SF Sawcut & Remove Existing & Construct New 8" P.C.C. $45.00 0.00 SF 0.00 SF 0.00 SF $0.00 $0.00 $0.00 $2,700.00 Spandrel(including 8" CMB & excavation 15 1,330 LF Sawcut & Remove Existing & Construct New Modified Type "B" $24.00 0.00 LF 15.00 LF 15.00 LF $0.00 $360.00 $360.00 $31,920.00 Curb(including excavation 16 2,840 SF Sawcut & Remove Existing & Construct Stamped Concrete 4" $7,00 981.00 SF 0.00 SF 981.00 SF $6,867.00 $0.00 $6,867.00 $19,880.00 P.C.C. over 4" Sand(including excavation 17 415 SF Sawcut & Remove Existing & Construct Concrete Mow Strip 4" $12.00 226.00 SF 0.00 SF 226.00 SF $2,712.00 $0.00 $2,712.00 $4,980.00 P.C.C. over 4" Sand (Including excavation and 20 Mil Plastic) 18 2 EA Sawcut &Remove Existing &Construct Median Nose $715.00 2.00 EA 0.00 EA 2.00 EA $1,430.00 $0.00 $0.00 $1 430.00 $1770.00 $1,430.00 $1,475.00 19 5 EA Set/ResetSurve Monuments cover to rade $295.00 6.00 EA 0.00 EA 6.00 EA EA $1,77 0.00 $60.50 $0.00 $60.50 $55.00 20 10 EA Reflective Blue RPM'S $5.50 $22,000.00 11.00 100.00 EA % 0.00 0.00 EA % 11.00 100.00 % $22,0 $0.00 $22,000.00 $22,000.00 21 1 1 LS LS Traffic Control Traffic Striping, Pavement Marking and Si ns $14,000.00 100.00 % 0.00 % 100.00 % $14,000.00 $0.00 $14,000.00 $14,000.00 $15,795.00 22 23 81 EA Install Traffic Signal Loos $195.00 95.00 EA 0.00 EA 95.00 EA $18,525.00, $0.00 $18,525.00 24 36,000 SY Subgrade stabilization fabric (Mirafi 600x) - only as needed and $0.59 500.00 SY 0.00 SY 500.00 SY $295.00 $0.00 $295.00 $21,240.00 25 36,000 SY as directed by Engineer Pavement fabric - Petromat only as needed $0.01 0.00 SY 0.00 SY 0.00 SY $0.00 $0.00 $0.00 $360.00 26 200 CY Unclassified Excavation/Overexcavation at direction of $14.00 0.00 CY 178.00 CY 178.00 CY $0.00 $2,492.00 $2,492.00 $2,800.00 400 Engineer TON CMB/Overexcavation at direction of Engineer $1.00 0.00 TON 0.00 TON 0.00 TON $0.00 $0.00 $0.00 $0.00 $2,505.801 $400.00 $3,520.00 27 28 8,000 LF Paint Curb Red $0.44 5,695.00 LF 0.00 0.15 LF 1 FA 5,695.00 1.00 LF 1 FA $2,505.80 42 500.00 $7,500.001 50 000.00 $50,000.00 29 1 FA Pro ect Mana ement $50 000.00 0.85 FA TOTAL: $1,535,101.31 $11,042.00 $1,546,143.31 $1,938,661.00 0 9 M Z