HomeMy WebLinkAbout- - Measure M Eligibility Attachment 2 - 6/15/201003 -Jun -10 Measure M Growth Management Program 1 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa� �� r Project Number: n/a Unfunded 100.00% 25,000 25,750 IMeasure M SIP, AB 2766 Project Name : Adams Avenue & West Mesa Verde Drive — 100.00% $25,000 $25,750 Project Limits/Loc : Adams/W. Mesa Verde Drive Type Of Work : Traffic Signals Additional TOW: install new traffic signal and equipment Project Description: Add northbound right -tum overlap phasing with the westbound left -tum movements at this intersection. This improvement is per the Santa Ana River Crossing Memorandum of Understanding. Project Cost�t 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 1 0 1 25,000 0 1 0 0 0 0 25,000 25,750 $0 $25,000 $0 $0 $0 $0 $0 $25,000 $25,750 Agency: Costa Mesa spF N Project Number: n/a Unfunded 100.00% 2,500,000 2,750,000 Imeasure M2 Turnback, Gas Tax, AHRP Project Name : Adams Avenue Reconstruction 100.00% $2,500,000 $2,750,000 Project Limits/Loc : Santa Ana River to Fairview Road Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of total reconstruction of pavement structural section on Adams Avenue from Santa Ana River to Fairview Road. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 I6/17 C 1 0 1 0 1 0 2,500,000 0 0 0 2,500,000 2,750,000 $0 $0 $0 $2,500,000 $0 $0 $0 $2,500,000 $2,750,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 2 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesas Project Number : n/a Unfunded 100.00% 1,600,000 1 1,900,000 IMeasure M2 Tumback, Gas Tax, AHRP Project Name: Anton Avenue Reconstruction 100.00% $1,600,000 $1,900,000 Project Limits/Loc : Avenue of the Arts to Sakioka Avenue Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of total reconstruction of pavement structural section on Anton Avenue from Avenue of the Arts to Sakioka Avenue. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost . I0/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 0 1,500,000 1,500,000 1,800,000 E 0 0 0 0 0 0 100,000 100,000 100,000 $0 $0 $0 $0 $0 $0 $1,600,000 $1,600,000 $1,900,000 Agency: Costa Mesa Project Number: n/a Project Name : Anton Boulevard & Sunflower Avenue Project Limits/Loc : Anton Boulevard and Sunflower Avenue Type Of Work: Intersection Additional TOW: add left tum lane(s) to intersection Project Description: The project adds a second westbound left -tum lane at the intersection. 100.00% $258,500 $302,500 `'r "' ."�: "gam" 4,,. -.. "`rr^"-.�' �.Z`:.`w�,t, Y'�' -�,. "��'" kr�a•.'°'p. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 0 220,000 220,000 264,000 E 0 0 0 0 0 38,500 0 38,500 38,500 $0 $0 $0 $0 $0 $38,500 $220,000 $258,500 $302,500 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 3 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number: n/a Project Name : Arlington Drive Rehabilitation Project Limits/Loc : Fairview Road to Newport Boulevard Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: Project consists of reconstruction of structural section and slurry seal on Arlington Drive from Fairview Road to Newport Boulevard. Some damaged sidewalk, access ramps, and curb/gutter within the project limits will also be replaced. Project Cost. �.. 10/11 11/12 12/13 �2700�,000�2�,M,% ..000 100.00% $2,700,000 $2,943,000 13/14 14/15 15/16 16/17 '*1.1.`x11 ; e<� M2 Tumback, Gas Tax C 0 0 0 2,430,000 0 0 0 2,430,000 2,673,000 E 0 0 0 270,000 0 0 0 1 270,000 270,000 $0 $0 $0 $2,700,000 $0 $0 $0 $2,700,000 $2,943,000 Agency: Costa Mesa �•,� _�J_, �;, , � Project Number : n/a Unfunded 100.00% 442,800 505,024 IMeasure M2 RCP, Traffic Impact Fees Project Name : Baker & Bear Intersection Improvements 0 44,000 0 /Lo Project Limitsc : Baker Street & Bear Street Intersection 100.00% $442,800 $505,024 Type Of Work: Intersection 0 0 0 Additional TOW: add through lane(s) to intersection 0 0 52,800 Project Description: This project adds a westbound through lane at this intersection in accordance with General Plan Circulation Element. Project Cost f` .e. ���� ��✓>rt` ..\���vti4.4;'`,a�i.... .� ��������.�?���� ��� ����xk . �` �1���� ����� �.�w-�. ., r-_ _ _ . �% " . C 0 0 0 0 0 346,000 0 346,000 401,360 E 0 0 0 44,000 0 0 0 44,000 44,000 R 0. 0 0 0 52,800 0 0 52,800 59,664 $0 $0 $0 $44,000 $52,800 $346,000 $0 $442,800 $505,024 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 4 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa��`... 11 Project Number : n/a°.ah Unfunded 100.00% 1150,000 .'.�: _ 1,250,000 Project Name : Baker Street Improvement 1,000,000 1,100,000 E 0 0 100.00% $1,150,000 $1,250,000 Project Limits/Loc : Newport Blvd. to Redhill Avenue 0 150,000 150,000 Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: This project consists of total reconstruction of pavement on Baker Street from Newport Blvd. to Redhill Avenue. Some damaged curb and gutter, sidewalk, access ramps and driveway will be removed and reconstructed. Protect Cost 10/11 11/12 12/13 13/14 14/15 15/16 $0 $0 $0 $1,150,000 $0 $0 Agency: Costa Mesa ray ' ,. t � I � W kms:. Project Number : n/a Unfunded 100.00% 1,392,000 1,554,864 Project Name : Baket Street Rehabilitation 100.00% $1„392,000 $1,554,864 16/17 z . M, AHRP, Gas Tax C 0 0 0 1,000,000 0 0 0 1,000,000 1,100,000 E 0 0 0 150,000 0 0 0 150,000 150,000 Project Limrts/Loc : Harbor - Mesa Verde Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: Project consists of total reconstruction of pavement structural section on Baker Street from Harbor Boulevard to Mesa Verde Drive. Some damaged sidewalk, access ramps, and curb/gutter within the project limits will also be removed and reconstructed. Project Cost :04 5 .9 F 11 10/11 11/12 12/13 $0 $0 $0 13/14 14/15 $0 $1,150,000 $1,250,000 �. t.�� Measure M2 Tumback, AHRP, Gas Tax 15/16 16/17 C 0 0 0 0 1,252,800 0 0 1,252,800 1,415,664 E 0 0 0 0 1 139,200 0 0 139,200 139,200 Measure M: Yes $0 $1,392,000 $0 $0 $1,392,000 $1,554,864 03 -Jun -10 Measure M Growth Management Program 5 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Project Name : Bear Street & SR -73 NB Ramps Project Limits/Loc : Bear Street and SR -73 NB Ramps Type Of Work: Intersection Additional TOW: add left tum lane(s) to intersection Project Description: The project adds a second left -tum to the northbound approach at the intersection. 100.00% $403,700 $459,140 Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 346,500 0 346,500 401,940 E 0 0 0 0 57,200 0 0 57,200 57,200 $0 $0 Agency: Costa Mesa Project Number : n/a Project Name : Bear Street Signal Improvements Project Limits/Loc : Baker Street to Paularino Avenue Type Of Work: Traffic Signals Additional TOW: replace and upgrade traffic signals and equipment Project Description: Upgrade signal hardware, communications and coordination between Caltrans and City signals along Bear Street within the oroiect limits. Update Bear/Baker traffic signal ohasine. Project Cost : Measure M: Yes $0 $0 $57,200 Unfunded 1 100.00% I 261,250 100.00% $261,250 $346,500 $0 $403,700 $459,140 276,925 IMeasure M2 Signal, AB2766 $276,925 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 261,250 0 0 0 0 261,250 276,925 $0 $0 $261,250 $0 $0 $0 $0 $261,250 $276,925 03 -Jun -10 Measure M Growth Management Program 6 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa e x y c T, — gy m Q g Y:, . ,kms POOR z Fs..e- t ,. w . Project Number : n/a Unfunded 1 100.00% 1,078,000 1 1,190,750 IMeasure M2 Signal, Traffic Impact Fees% Project Name : Bristol & Baker Intersection Improvements Project Limits/Loc : Bristol Street & Baker Street Intersection 100.00% $1,078,000 $1,190,750 Type Of Work: Intersection Additional TOW: add through and left tum lanes to intersection Project Description: Add eastbound and westbound through lanes and an additional northbound left -tum lane at this intersection. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 550,000 0 0 550,000 621,500 E 0 0 115,500 0 0 0 0 115,500 115,500 R 0 0 0 412,500 0 0 0 412,500 453,750 $0 $0 $115,500 $412,500 $550,000 $0 $0 $1,078,000 $1,190,750 Agency: Costa Mesa� MOR, g Project Number: n/a Unfunded 100.00% 1,501,000 1 1,665,505 IMeasure M2 RCP, Traffic Impact Fees Project Name : Bristol Street & Sunflower Avenue 100.00% $1,501,000 $1,665,505 Project Limits/Loc : Bristol & Sunflower Type Of Work: Intersection Additional TOW: add through and left tum lanes to intersection Project Description: This project adds a third northbound left -tum lane and a fourth westbound through lane in conformance with General Plan Circulation Element. Project Cost c,. � ,,.:t.>..ra� a„ 1;:..a�-,-'�z.'�".� -3;. s �,.::..a.��E:z. K.. "s. .,. s... :. ;:"�.✓ .,�-,a,._.ma.:,..�� �.-:�..�.�.-,.,�5,,. iE�``..�.s��..,.a. :cs'"�.,{2,.F u�. ��c°�..�v .. .w ... .�..a�i-'.` .. a .a N Urt{ 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 863,500 0 0 863,500 975,755 E 0 0 115,000 0 0 0 0 115,000 115,000 R 0 0 0 522,500 0 0 0 522,500 574,750 $0 $0 $115,000 $522,500 $863,500 $0 $0 $1,501,000 $1,665,505 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 7 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency : Costa Mesa Project Number : n/a ( Unfunded 100.00% 3,000,000 3,090,000Measure M2 Turnback, Gas Tax AHRP Project Name : Bristol Street Reconstruction 100.00% $3,000,000 $3,090,000 Project Limits/Loc : I405 to Easterly City Limits Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of total reconstruction of pavement structural section on Bristol Street from I405 to Easterly City Limits. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cosh �.«.•�.�.:�+,��' �.:...,xv,k..:,2.:w:r�r�«�e,.,�'',.''r',�a�...�''Y.�, �u�,:.u'.�"' %..�.,,z sv":�.,: vs.e "�:a�-` r"4..: v :�� �'�'�"'<-.��;:,".� �.-a:'�...� 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 3,000,000 0 0 0 0 0 3,000,000 3,090,000 $0 $3,000,000 $0 $0 $0 $0 $0 $3,000,000 $3,090,000 Agency: Costa Mesa Project Number: n/a Project Name : Bristol Street Widening Project Limits/Loc : I405 to Baker Type Of Work: Road Widening Additional TOW: add 1 lane to existing roadway in project limits Project Description: Add an additional northbound through lane on Bristol Street in conformance with General Plan Circulation Element. Project Cost : Measure M: Yes 100.00% $2,464,000 $2,815,065 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 2,145,000 0 2,145,000 2,488,200 E 0 0 0 258,500 0 0 0 258,500 258,500 R 0 0 0 0 60,500 0 0 60,500 68,365 $0 $0 $0 $258,500 $60,500 $2,145,000 $0 $2,464,000 $2,815,065 03 -Jun -10 Measure M Growth Management Program R Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency : Costa Mesa Project Number : n/a Gas Tax 64.00% 12 469,496 12,469,496 Project Name : Citywide Street Improvement Turnback 36.00% 7,014,092 7,014,092 Measure M M2 Project Limits/Loc : Citywide 100.00% $19,483,588 $19,483,588 Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: Project consists of total structural pavement reconstruction of residential and collector streets citywide including damaged curb/gutter. The selection of residential and collector streets for maintenance is determined at the start of each fiscal year. P '^:� .p,�. ,.+i°•*T r fi '', i r'K.r"�r+J*�. �ar''...ez .` .y �,yy'a '�" `.:� `"" .. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 1,483,588 1 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 19,483,588 19,483,588 $1,483,588 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $19,483,588 $19,483,588 Agency: Costa Mesa bRe Project Number : n/a Unfunded 100.00% 850,000 850,000 Measure M2 Project Name : Citywide Traffic Signal Improvements 100.00% $850,000 $850,000 Project Limits/Loc : Citywide Type Of Work: Traffic Signals Additional TOW: replace and upgrade traffic signals and equipment Project Description: Citywide traffic signal improvements, replace antiquated cabinets and upgrade other hardware. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 0 0 425,000 425,000 0 0 0 850,000 850,000 $0 $0 $425,000 $425,000 $0 $0 $0 $850,000 $850,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 9 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesad �� Project Number : n/a Ko I 04 Unfunded 100.00% 1,530,000 1,530,000 IMeasure M2 Project Name : Costa Mesa ITS Improvements Project Limits/Loc : Citywide 100.00% $1,530,000 $1,530,000 Type Of Work: Systems Management Additional TOW: communications intertie between cities to manage traffic Project Description: ITS Improvements including interagency interties and, CCTV camera installations, changeable message signs. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 0 0 0 0 0 1,530,000 0 1,530,000 1,530,000 $0 $0 $0 $0 $0 $1,530,000 $0 $1,530,000 $1,530,000 Agency: Costa Mesa Project Number : n/a Project Name : East 17th Street & Irvine Avenue Project Limits/Loc : East 17th Street & Irvine Avenue Type Of Work : Intersection Additional TOW: add right turn lane(s) to intersection 100.00% $1,400,000 $1,516,000 Project Description: Project constructs right -tum lane on the southbound and eastbound directions, right -tum lanes, bus turnouts, street lighting, and streetscape improvements. Project Cost + J 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 1,I00,000 0 0 0 1,100,000 1,210,000 E 0 0 200,000 0 0 0 0 200,000 200,000 R 0 0 100,000 0 0 0 0 100,000 106,000 $0 $0 $300,000 $1,100,000 $0 $0 $0 $1,400,000 $1,516,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 10 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Project Name : East 17th Street & Tustin Avenue Project Limits/Loc : East 17th Street & Tustin Avenue Type Of Work : Intersection Additional TOW: add right turn lane(s) to intersection Project Description: Project consists of adding right -tum lanes to all approaches to the intersection, construction of bus turnouts, street lighting, and streetscape improvements. Project Cost"$ 100.00% $1,298,000 $1,404,800 x-.1.1 ms's 13/14 14/15 15/16 16/17 C 0 0 0 1,023,000 0 0 0 1,023,000 1,125,300 E 0 0 200,000 0 0 0 0 200,000 200,000 R 0 0 75,000 0 0 0 0 75,000 79,500 $0 $0 $275,000 $1,023,000 $0 $0 $0 $1,298,000 $1,404,800 Agency: Costa Mesa Project Number : n/a Project Name : Fairview Road & Baker Street Project Limits/Loc : Fairview Road and Baker Street o Type Of Work: Intersection 100.00 /o $735,900 $861,080 Additional TOW: add through lane(s) to intersection Project Description: The project adds a northbound through lane at the intersection. Project Cost ,vv « C 0 0 0 0 0 0 515,900 515,900 619,080 E 0 0 0 0 82,500 0 0 82,500 82,500 R 0 0 0 0 0 137,500 0 137,500 159,500 $0 $0 $0 $0 $82,500 $137,500 $515,900 $735,900 $861,1 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 11 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number: n/a Unfunded 100.00% 25,000 26,500 IMeasure M2 Signal, AB 2766 Project Name : Fairview Road & Baker Street Traffic Signal 462,000 Improvements 100.00% $25,000 $26,500 Project Limits/Loc : Fairview & Baker 742,060 Type Of Work: Traffic Signals 0 Additional TOW: install new traffic signal and equipment 0 Project Description: The project adds a northbound right -tum overlap phasing 0 with the westbound left -tum movement. The improvement is 124,300 per the Santa Ana River Crossing Memorandum of R 0 Understanding rt Project Cost ��.� ���� .�`��-.�,�`�-• �>,,�t "o- _fir"r.�.. �- t.. � � �. � � � e �� � �,a�'�.�. � 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 25,000 0 0 0 0 25,000 26,500 $0 $0 $25,000 $0 $0 $0 $0 $25,000 $26,500 Agency: Costa Mesa .,W >• O in�N K -,.Q M _ Project Number : n/a Unfunded 100.00% 1,235,300 1 1,360,260 IMeasure M2 RCP, Traffic Impact Fees Project Name : Fairview Road & South Coast Drive 100.00% $1,235,300 $1,360,260 Project LimitsAAc : Fairview & South Coast Type Of Work: Intersection Additional TOW: add through lane(s) to intersection Project Description: Project provides a fourth southbound through lane at the intersection in conformance with General Plan Circulation Element. ,.s.,rt 3. '°�. x `i" �f^' w L "c'Y'•'ti� Y+z�,o-.%. .....'.,'.`"x '.,.,I��ww---='.'E?` ii z `",a �* Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 200,000 462,000 0 0 662,000 742,060 E 0 0 124,300 0 0 0 0 124,300 124,300 R 0 0 0 449,000 0 0 0 449,000 493,900 $0 $0 $124,300 $649,000 $462,000 $0 $0 $1,235,300 $1,360,260 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 12 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa � 4 ��� Project Number: n/a Unfunded 100.00% 885,500 999,834 JMcasure M2 RCP, Impact Fees Project Name : Fairview Road & Sunflower Avenue Intersection Improvements 100.00% $885,500 $999,834 Project Limits/Loc : Fairview Road & Sunflower Avenue Intersection Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: This project adds right -tum lanes on southbound and eastbound approaches in conformance with General Plan Circulation Element. Project Cost 4� 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 484,000 0 484,000 561,440 E 0 0 0 117,700 0 0 0 117,700 117,700 R 0 0 0 0 283,800 0 0 283,800 320,694 $0 $0 Agency : Costa Mesa Project Number : n/a Project Name : Fairview Road Reconstruction Project Limits/Loc : Baker Street to Sunflower Avenue Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of reconstruction of pavement structural section on Fairview Road from Baker Street to Sunflower Avenue. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost: 10/11 11/12 12/13 $0 $117,700 $283,800 . tx�170 Ni Mw" Unfunded 1 100.00% 2,397,000 100.00% $2,397,000 $484,000 $0 $885,500 $999,834 2,677,449 Measure M2 Turnback, Gas Tax, AHRP $2,677,449 13/14 14/15 15/16 16/17 C 0 0 0 0 2,157,300 0 0 2,157,300 2,437,749 E 0 0 0 0 239,700 0 0 239,700 239,700 $0 $0 $0 $0 $2,397,000 $0 $0 $2,397,000 $2,677,449 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 13 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa1-1 rmmiw, WIREAR Project Number : n/a Unfunded 1 100.00% 4,620,000 1 5,123,250 IMeasure M2 RCP, Traffic Impact Fees Project Name : Harbor Boulevard & Adams Avenue Project Limits/Loc : Harbor - Adams 100.00% $4,620,000 $5,123,250 Type Of Work: Intersection Additional TOW: add left turn and right turn lanes to intersection Project Description: This project adds northbound left -tum lane and a third eastbound left -tum lane at this intersection in conformance with General Plan Circulation Element and SARX Memorandum of Understanding. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 3,300,000 0 0 0 3,300,000 3,729,000 E 0 495,000 0 0 0 0 0 495,000 495,000 R 0 0 825,000 0 0 0 0 825,000 899,250 $0 $495,000 $825,000 $3,300,000 $0 $0 $0 $4,620,000 $5,123,250 Agency: Costa Mesa Project Number : n/a Project Name : Harbor Boulevard & Gisler Avenue Project Limits/Loc : Harbor BI/Gisler Avenue Type Of Work • Intersection 100.00% $531,300 $621,852 Additional TOW: add right tum lane(s) to intersection Project Description: Add southbound right -tum lane at the intersection per General Plan Circulation Element. Project Cost ���� 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0, 0 0 0 0 0 380,600 380,600 456,720 E 0 0 0 0 60,500 0 0 60,500 60,500 R 0 0 0 0 0 90,200 0 90,200 104,632 $0 $0 $0 $0 $60,500 $90,200 $380,600 $531,300 $621,852 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 14 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa Project Number : n/a Project Name : Harbor Boulevard & South Coast Drive Phase 2 Project Llmlts/I oc : Harbor Boulevard and South Coast Drive Type Of Work: Intersection Additional TOW: add through and right turn lanes to intersection Project Description: The project adds a second westbound right -turn lane and includes restriping the optional through and right -turn lane to an exclusive through lane. Project Cost��? 100.00% $1,941,500 $2,292,180 13/14 14/15 15/16 16/17 C 0 0 0 0 0 0 1,669,800 1,669,800 2,003,760 E 0 0 0 0 167,200 0 0 167,200 167,200 R 0 0 0 0 0 104,500 0 104,500 121,220 $0 $0 $0 $0 $167,200 $104,500 $1,669,800 $1,941,500 $2,292,180 Agency: Costa Mesa x -" "V s 9 Project Number: n/a Unfunded 100.00% 728,200 823,152 Measure M2 RCP, Impact Fees Project Name : Harbor Boulevard & Sunflower Avenue Intersection 100.00% $728,200 $823 152 Improvements Project Limits/Loc : Harbor & Sunflower Intersection Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: This project adds right -tum lanes on eastbound and westbound approaches in accordance with the General Plan Circulation Element. Project Cost C 0 0 0 0 0 457,600 0 457,600 530,816 E 0 0 0 103,400 0 0 0 103,400 103,400 R 0 0 0 0 167,200 0 0 167,200 188,936 $0 $0 $0 $103,400 $167,200 $457,600 $0 $728,200 $823,152 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 15 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/20I7 Agency : Costa Mesa Project Number : n/a Project Name : Harbor Boulevard & Victoria Street Project Limits"c : HarborNictoria Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: Add eastbound right -tum lane at the intersection in accordance with the General Plan Circulation Element. 100.00% $788,700 $893,926 Project Cost ;hTe..G�`, "S�.�a""',�sc�:�:;�r.�fi• �.z.�. �a»�,�� �`�-�.a.t. '- ":�...;1, �. � � �:,?" �`�..E ..�`"`v:�.." a� `. ,�a . 10/11 11/12 12/13 I3/14 14/15 15/16 16/17 C 0 0 0 0 0 495,000 0 495,000 574,200 E 0 0 0 93,500 0 0 0 93,500 93,500 R 0 0 0 0 200,200 0 0 200,200 226,226 $0 $0 $0 $93,500 $200,200 $495,000 $0 $788,700 $893,926 Agency: Costa Mesa MEM Project Number : n/a Unfunded 100.00% 410,300 446,490 IMeasure M2 RCP Project Name : Harbor Boulevard & Wilson Street Intersection 0 Improvements 100.00% $410,300 $446,490 Project Limits/Loc : Harbor & Wilson Intersection E Type Of Work: Intersection 0 Additional TOW: add right turn lane(s) to intersection 0 Project Description: This project adds westbound right -tum lane at this 0 0 intersection in accordance with General Plan Circulation 48,400 Element. Project Costt ,� r Ham• 2``���. ,.a 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 36I,900 0 0 0 361,900 398,090 E 0 0 48,400 0 0 0 0 48,400 48,400 $0 $0 $48,400 $361,900 $0 $0 $0 $410,300 $446,490 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 16 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number: n/a ( Unfunded 100.00% 396,000 429,000 IMeasure M2 RCP, City Funds Project Name : Harbor Boulevard Bus Turnouts Project Limits/Loc : Northbound Harbor at Adams Avenue and at MacArthur 100.00% $396,000 $429,000 Boulevard Type Of Work: Road Widening Additional TOW: provide turnouts for buses Project Description: The project involves construction of bus turnouts on northbound Harbor Boulevard at Adams Avenue and MacArthur Boulevard. This improvement is per Santa Ana River Crossing Memorandum of Understanding. Project Cost .�� � >�5 - - *�� � , �� " _. °.' ���,� c� �^� � ►�������► ;: "�`` `� ,y�y � .��.rsu'`w-.��..<.w_..n�...��..�v..-r�,.:ms.:f}. a�� ` '1. w,A�..+�� n•_�.�'^:m�,.:.:�`�,. �.� i,� -� ..:+F:., �.. �.,:e'� K.,�..a�'m '°�.,'� � ,,� r"�'",-,�,ss'�,.�caa`� a�� s�^ , 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 330,000 0 0 0 330,000 363,000 E 0 0 66,000 0 0 0 0 66,000 66,000 $0 $0 $66,000 $330,000 $0 Agency: Costa Mesas Project Number: n/a �RE" SIR'. Project Name: Hyland Avenue & I-405 NB Ramp at South Coast Drive Unfunded 100.00% Project Limits/Loc : Hyland Avenue & I405 NB Ramp at South Coast Drive 100.00% Type Of Work: Intersection Additional TOW: add right tum lane(s) to intersection Project Description: The project includes addition of westbound right tum lane from South Coast Drive to northbound Hyland Avenue and associated traffic signal and striping modifications. Project Cost` Wiz. 10/11 11/12 12/13 13/14 Measure M: Yes 500,000 $500,000 $0 $0 $396,000 $429,000 545,000 IMeasure M, IIP, AB2766, Traffic Impact Fees $545,000 14/15 15/16 16/17 C 0 0 0 450,000 0 0 0 450,000 495,000 E 0 0 0 50,000 0 0 0 1 50,000 50,000 $0 $0 $0 $500,000 $0 $0 $0 $500,000 $545,000 03 -Jun -10 Measure M Growth Management Program 17 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Unfunded 100.00% 627,000 691,350 IMeasure M2 Signal, AB 2766 Project Name : Hyland Avenue & MacArthur Boulevard - Project Limits/Loc : Hyland/MacArthur 100.00% $627,000 $691,350 Type Of Work: Intersection Additional TOW: add left tum lane(s) to intersection Project Description: The project consists of widening/restriping of the northbound approach to provide three left -tum lanes and one through/right-tum lane at this intersection. This improvement is per the Santa Ana River Crossing Memorandum of Understanding. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 495,000 0 0 495,000 559,350 E 0 0 0 132,000 0 0 0 132,000 132,000 $0 $0 $0 $132,000 $495,000 Agency : Costa Mesa c ' Project Number : n/a#�A` Unfunded 100.00% 1,000,000 Project Name : MacArthur Boulevard Reconstruction 100.00% $1,000,000 Project Limits/Loc : 600' West of Harbor to Santa Ana River Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: The project involves reconstruction of pavement structural section on MacArthur Blvd between Santa Ana River and 600' w.o Harbor. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the project limits. Project Cost Measure M: Yes $0 $0 $627,000 $691,350 1,030,000 IMeasure M Tumback, Gas Tax, AHRP $1,030,000 I0/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 1,000,000 0 0 0 0 0 1,000,000 1,030,000 $0 $1,000,000 $0 $0 $0 $0 $0 $1,000,000 $1,030,000 03 -Jun -10 Measure M Growth Management Program 18 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Project Name : Main Street & Sunflower Avenue Project Llmlts/Loc : Main Street and Sunflower Avenue 100.00% $971,850 $1,114,388 Type Of Work : Intersection Additional TOW: add right turn lane(s) to intersection Project Description: The project includes providing free right -tum lanes to the southbound and eastbound approaches. Project Cost - �-,"� � '� �. �� � �� �� �,•, C 0 0 0 0 0 0 479,050 479,050 574,860 E 0 0 0 0 200,750 0 0 200,750 200,750 R 0 0 0 0 0 292,050 0 292,050 338,778 $0 $0 $0 $0 $200,750 $292,050 $479,050 $971,850 $1,114,388 Agency • Costa Mesa �, Project Number : n/a Unfunded 100.00% 2,800,000 2,875,600 IMeasure M Turnback, AHRP, Gas Tax Project Name : Merrimac Way Rehabilitation 100.00% $2,800,000 $2,875,600 Project Limits/Loc : Harbor to Fairview Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: Project consists of total rehabilitation of structural section on Merrimac Way from Harbor Boulevard to Fairview Road. Some damaged sidewalk, access ramps, and curb/gutter within the project limits will also be removed and replaced. i,4 far `5 ,,. '• *` 3"->" >�..-. ?„w w, `+ -.� ..o.j cry -. ;R. V+^'i Project Cost. F��'T,. C�"^r .W 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 2,520,000 0 0 0 0 0 2,520,000 2,595,600 E 0 280,000 0 0 0 0 0 280,000 280,000 $0 $2,800,000 $0 $0 $0 $0 $0 $2,800,000 $2,875,600 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 19 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa Project Number : n/a Project Name : Mesa Verde Drive Rehabilitation Project Limits/Loc : East and West Sections ' Unfunded 1 100.00% 4,775,000 I 5,040,500 (Measure M2 Tumback, AHRP, Gas Tax 100.00% $4,775,000 $5,040,500 Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: Project consists of rehabilitation of pavement structural section on entire section of Mesa Verde Drive. Some damaged sidewalk, access ramps, and curb/gutter within the project limits will also be removed and reconstructed. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 4,425,000 0 0 0 0 4,425,000 4,690,500 E 0 0 350,000 0 0 0 0 350,000 1 350,000 $0 Agency: Costa Mesa Project Number : n/a Project Name : Newport Bl SB Frontage Rd Rehabilitation Project Limits/Loc : I6th Street to Industrial Way Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway $0 $4,775,000 $0 $0 Project Description: This project consists of rehabilitation of pavement structural Unfunded 1 100.00% ( 605,000 100.00% $605,000 $0 $0 $4,775,000 $5,040,500 623,150 IMeasure M Tumback, Gas Tax, AHRP (55%) $623,150 section on Newport BI SB Frontage Road from 16th Street to Industrial Way. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost. 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 605,000 0 0 0 0 0 605,000 623,150 $0 $605,000 $0 $0 $0 $0 $0 $605,000 $623,150 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 20 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Unfunded 100.00% 475,000 489,250 IMeasure M Tumback, AHRP, Gas Tax M=r Project Name : Newport Boulevard NB Frontage o Project Limits/Loc : 15th Street to 17th Street 100.00 /o $475,000 $489,250 Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: This project consists of rehabilitation of pavement structural section on Newport Blvd North Frontage from 15th St to 17th St. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 475,000 0 0 0 0 0 475,000 489,250 $0 $475,000 $0 $0 $0 $0 $0 $475,000 $489,250 Agency: Costa Mesa Project Number : n/a Project Name : Newport Boulevard NB Frontage Road & Del Mar Project Limits/Loc : Newport Boulevard NB Frontage Road and Del Mar Avenue Type Of Work: Intersection Additional TOW: add right tum lane(s) to intersection Project Description: The project involves widening the westbound approach to provide for one right -tum lane, one optional through and right -tum lane and two through lanes. Project Cost N 10/11 11/12 Measure M: Yes 100.00% $241,450 $274,714 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 207,900 0 207,900 241,164 E 0 0 0 0 33,550 0 0 33,550 33,550 $0 $0 $0 $0 $33,550 $207,900 $0 $241,450 $274,714 03 -Jun -10 Measure M Growth Management Program 21 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa Project Number: n/a Project Name : Newport SB Frontage Road & Fair Drive Project Limits/Loc : Newport Boulevard SB Frontage Road and Fair Drvie Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: The project adds a second right -turn lane at the above intersection. Project Cost : Other 50.00% 382,250 451,264 JFairgrounds Mitigation Unfunded 50.00% 382,250 451,264 IMeasure M2 RCP 100.00% $764,500 $902,528 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 0 667,700 667,700 801,240 E 0 0 0 0 68,750 0 0 68,750 68,750 R 0 0 0 0 0 28,050 0 28,050 32,538 $0 $0 $0 $0 $68,750 $28,050 $667,700 $764,500 $902,528 Agency: Costa Mesa � 7 1 �� : a,i _.'�.a2i.,.S A_.s .'tti"v'«t Project Number: n/a Tumback 100.00% 2,100,000 2,100,000 Project Name : Parkway Improvement Program - Sidewalks : 100.00% $2,100,000 $2,100,000 Project LimitsdAc Citywide Type Of Work: Pedestrian Additional TOW: reconstruction or rehabilitation of sidewalk Project Description: This project consists of removal and reconstruction of existing damaged sidewalk, curb/gutter, driveways, access ramps and cross gutters citywide. Streets where sidewalks will be reconstructed is determined based on need at the start of each fiscal year. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 300,000 300,000 300,000 300,000 300,000 300,000 300,000 2,100,000 2,100,000 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $2,100,000 $2,100,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 22 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa; Project Number : n/a Unfunded 100.00% 700,000 721,000 IMeasure M Tumback, Gas Tax AHRP Project Name : Paularino Avenue Rehabilitation a Project Limits/Loc : Bear Street to Bristol Street 100.00 /o $700,000 $721,000 Type Of Work: Road Maintenance Additional TOW: rehabilitation of roadway Project Description: This project consists of rehabilitation of pavement structural section on Paularino Avenue from Bear Street to Bristol Street. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Costs .,��� ,, j� _,.,: • , s 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 700,000 0 0 0 0 0 700,000 721,000 $0 $700,000 $0 $0 $0 $0 $0 $700,000 $721,000 Agency: Costa Mesa Project Number : n/a Project Name : Placentia Avenue & Victoria Street Project Limits/Loc : Placentia Avenue and Victoria Street Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: The project includes adding a second eastbound right -turn lane at the intersection. 100.00% $486,200 $568,986 Project Cost � .�e.as.�...a,,.�..�,;:;:,'. �,a�.''.'�.�.,� �.,✓�,�,,..v����:�z �:.�...,.i.T..:.�w„�`.`h��...t`�"...��fiw:«:k"�..<..h'���.. `i :�..�yw'iZe etia-�:xc'�.�..=as,,.��a�".� ,� ��,u+�'���,�-:k;ic.a�.��������`.'��v.�".�x'�`�»,�wa,�� ,��.�Fs'a`,�:. , .t,,. c, 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 0 347,050 347,050 416,460 E 0 0 0 0 55,550 0 0 55,550 55,550 R 0 0 0 0 0 83,600 0 83,600 96,976 $0 $0 $0 $0 $55,550 $83,600 $347,050 $486,200 $568,986 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 23 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesar _ 1 _ I M-1100 Project Number: n/a Unfunded 100.00% 2,656,000 1 3,048,960 IMeasure M Turnback, Gas Tax, AHRP Project Name : Placentia Avenue Reconstruction o Project Limits/Loc : Wilson Street to Adams Avenue 100.00 /o $2,656,000 $3,048,960 Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of reconstruction of pavement structural section on Placentia Avenue from Wilson Street to Adams Avenue. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost: 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 2,456,000 0 2,456,000 2,848,960 E 0 0 0 0 0 200,000 0 200,000 200,000 $0 $0 $0 $0 $0 $2,656,000 $0 $2,656,000 $3,048,960 Agency: Costa MesaENT Project Number : n/a Unfunded 100.00% 2,000,000 2,060,000 IMeasure M Turnback, Gas Tax, AHRP Project Name : Pomona Avenue Reconstruction o Project Limits/Loc : 16th Street to 18th Street 100.00 /o $2,000,000 $2,060,000 Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consist of reconstruction of pavement structural section on Pomona Avenue from 16th Street to 18th Street. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits Project Cost:$ .. ��'�+��s�sa��}- �, �3��•sarae..�a�....��•a:�;�.; �.`�'�� ��..`� s �=�a.�;.��.�.i:.�"rc�"�..>�„�..,.,��...'i:.�.:,,�,a�,u..t�.�:�"a�'� ���r ..>�.,..,� ��'��, 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 2,000,000 0 0 0 0 0 2,000,000 2,060,000 $0 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 $2,060,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 24 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Project Name : Red Hill Avenue & Baker Street Intersection Improvement Project Limits/Loc : Red Hill Avenue/Baker Street Type Of Work: Intersection Additional TOW: add right tum lane(s) to intersection Project Description: The project consists of adding a right -tum lane on southbound approach. Project Cost � 10/11 11/12 100.00% $784,850 $875,083 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 694,100 0 0 694,100 784,333 E 0 0 0 90,750 0 0 0 90,750 90,750 $0 $0 $0 $90,750 $694,100 $0 $0 $784,850 $875,083 Agency: Costa Mesa 4-1101,70A V* y Project Number: n/a Impact Fees 20.00% 117,150 130,206 Project Name : Red Hill Avenue & Paularino Intersection Improvement Unfunded 80.00% 468,600 520,824 Measure M2 RCP Project Limits/Loc : Red Hill Avenue/Paularino Avenue o 100.00 /o $585,750 $651,030 Type Of Work: Intersection Additional TOW: add right tum lane(s) to intersection Project Description: The project consists of adding a right -turn lane on southbound approach. Project Costi� w}a s,y t► 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 502,150 0 0 502,150 567,430 E 0 0 0 83,600 0 0 0 83,600 83,600 $0 $0 $0 $83,600 $502,150 $0 $0 $585,750 $651,030 ure M: Yes Meas 03 -Jun -10 Measure M Growth Management Program 25 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa, e Project Number: n/a Unfunded 100.00% 4,000,000 4,120,000 IMeasure M Tumback, Gas Tax, AHRP Project Name : Red Hill Avenue Reconstruction ° 100.00 /° $4,000,000 $4,120,000 Project Limits/Loc : Bristol Street to Paularino Avenue Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: The project involves reconstruction of pavement structural section on Red Hill Avenue between Bristol Street and Paularino Avenue. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the project limits. Project Cost ��'�w.!.;L;'s"sa`'�t,.�.�,��a;�:..s. �'a�.,a5�''.'?�-'�`\` .x,.�.,h"'�'�}"•'....=•.za;:ar''^''w=.' .�`°a,.��.•" ..,. :s�'" �r":.+.:�";r .�°w-: �:�x�; �+.,.�,°r::,,::�`nr'�=.<:: 0/11 11/12 12/13 13/14 14/15 15/16 16/17 C 1 0 4,000,000 0 0 0 0 0 4,000,000 4,120,000 $0 $4,000,000 $0 $0 $0 $0 $0 $4,000,000 $4,120,000 Agency : Costa MesaO ffiC� Project Number: n/a Unfunded 100.00% 275,000 275,000 IMeasure M2, AQMD Project Name : Redhill Avenue Signal Improvements 100.00% $275,000 $275,000 Project Limits/Loc : Redhill Avenue at Kalmus Drive, Baker Street, and Paularino Avenue Type Of Work: Traffic Signals Additional TOW: replace and upgrade traffic signals and equipment Project Description: Signal improvements including protected -permissive phasing, countdown signal heads, ADA ramps, and striping modification. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 0 0 275,000 0 0 0 0 275,000 275,000 $0 $0 $275,000 $0 $0 $0 $0 $275,000 $275,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 26 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number : n/a Project Name : Smart Street Improvements Project Limits/Loc : Adams, Harbor and Fairview Type Of Work: Traffic Signals Additional TOW: coordinate signals within project limits Project Description: Synchronize traffic signals along Adams Avenue, Fairview Road (north of Adams) and Harbor Boulevard (north of Adams). This improvement is per the Santa Ana River Crossing Memorandum of Understanding. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 25,000 25,000 25,000 25,000 0 0 100,000 108,000 $0 $25,000 $25,000 $25,000 $25,000 $0 $0 $100,000 $108,000 100.00% $100,000 $108,000 Agency: Costa Mesa' " xMOW P�����;ra..e�mr Project Number: n/a Unfunded 100.00% 324,500 352,220 IMeasure M2 RCP Project Name: SR -55 NB & Baker Street Intersection Improvements o 100.00 /o $324,500 $352,220 Project Limits/Loc : NB SR -55 & Baker Street Intersection Type Of Work: Intersection Additional TOW: add left turn lane(s) to intersection Project Description: Project adds left -tum lanes on northbound and eastbound approaches in accordance with General Plan Circulation Element. Project Cost .<=v wk'''��,>:w,-::�v'�a"v„a,Y��:.atw..w..;�,.aaz a`�.;;�+, E..sz�,7.�:::;; :.a�.�. 5.;�;=; �� � �_.,,....<�!.� �-�*aavu u,.:.au,:, °- ^c�me.�*E. ..;.• �` •' ;,='k�e`�,' �;' � ,@,� � ^� .x , �" �. g, 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 277,200 0 0 0 277,200 304,920 E 0 0 47,300 0 0 0 0 47,300 47,300 $0 $0 $47,300 $277,200 $0 $0 $0 $324,500 $352,220 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 27 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa�M-O��� t 0-0 $eF- 3a �-... .� ,_..,uta 152 Project Number: n/a I Unfunded 100.00% 848,100 958,953 IMeasure M2 RCP Project Name : SR -55 NB & Paularino Ave Intersection Improvements 100.00% $848,100 $958,953 Project Limits/Loc : SR -55 NB/Paularino Avenue Intersection Type Of Work: Intersection Additional TOW: add right turn lane(s) to intersection Project Description: This project adds a westbound right -turn lane in accordance with General Plan Circulation Element. Project Cost�� C 0 0 0 0 182,250 382,250 0 564,500 649,353 E 0 0 0 83,600 0 0 0 83,600 83,600 R 0 0 0 0 200,000 0 0 200,000 226,000 $0 $0 $0 $83,600 $382,250 $382,250 $0 $848,100 $958,953 Agency: Costa Mesa Project Number : n/a Unfunded 100.00% 548,900 612,106 IMeasure M2 RCP Project Name : SR -55 SB & Baker Street Intersection Improvements 100.00% $548,900 $612,106 Project Limits/Loc : SB SR -55 & Baker Street Intersection Type Of Work: Intersection Additional TOW: add through and right turn lanes to intersection Project Description: This project adds a southbound free-flow right -tum lane and converts westbound through to optional through+right tum lane in accordance with General Plan Circulation Element. Project Costes � � .°�_,:.��a:�'����.�,.kz: x*,."� ::�.�..�� �.�'k�`�.��.�Sa��=�.,a.,:_..���3'�r.xd<.�;z!z �-'r�'�" - ,�~� e u�,,,- ��,� ,� -. �- s,,, "'�' g� �--•'y r� 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 486,200 0 0 486,200 549,406 E 0 0 0 62,700 0 0 0 62,700 62,700 $0 $0 $0 $62,700 $486,200 $0 $0 $548,900 $612,106 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 28 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa M Fes' M -M ROOM Project Number : n/a Unfunded 100.00% 375,100 X414,854 IMeasure M IIP, RIP, M2 Project Name : SR -55 SB & Paularino Ave Intersection Improvements 100.00% $375,100 $414,854 Project Limits/Loc : SB SR-55/Paularino Avenue Intersection Type Of Work: Intersection Additional TOW: add right tum lane(s) to intersection Project Description: This project adds a southbound right -tum lane in accordance with General Plan Circulation Element. Project Cost' k� � }. � Z '�. %'+m 'i. �r„h i.N 3 `s tF4 E Gr.,*� ���� mu�stta. v.r«x.-�3 '. �Z s ♦ �4' f'� b'a a1'. 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 305,800 0 0 305,800 345,554 E 0 0 0 69,300 0 0 0 69,300 69,300 $0 $0 $0 $69,300 $305,800 $0 $0 $375,100 $414,854 Agency: Costa Mesa AWN IN Project Number : n/a ° J � Unfunded 100.00 /0 2,500,000 2,500,000 IMeasure M2 RCP Project Name : Traffic Signal System Upgrade Project Project Limits/Loc : Citywide 100.00% $2,500,000 $2,500,000 Type Of Work: Traffic Signals Additional TOW: replace and upgrade traffic signals and equipment Project Description: Traffic signal system upgrades including signal controllers, communications, infrastructure, hardware, signal timing and TOC signal system enhancements. Project Cost N 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 0 500,000 500,000 500,000 1,000,000 0 0 2,500,000 2,500,000 $0 $500,000 $500,000 $500,000 $1,000,000 $0 $0 $2,500,000 $2,500,000 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 29 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency Costa Mesa URPON10- N- Project Number n/a 421.11".. Unfunded 100.00% MRS01,110 2,300,000 -0- - 2,438,000 IMeasure M2 Tumback, Gas Tax, AHRP Project Name Victoria Street Reconstruction 100.00% $2,300,000 $2,438,000 Project Limits/Loc Harbor Boulevard to Santa Ana River Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of reconstruction of pavement structural section on Victoria Street from Harbor Boulevard to Santa Ana River. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. rc Project Cost : 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 2,300,000 0 0 0 0 2,300,000 2,438,000 $0 $0 $2,300,000 $0 $0 $0 $0 $2,300,000 $2,438,000 Agency Costa Mesa 4UME&F24 R N A EON Project Number n/a Unfunded 100.00% 2,095,000 1 2,430,200 IMeasure M2 Tumback, Gas Tax, AHRP Project Name Victoria Street Reconstruction 100.00% $2,095,000 $2,430,200 Project Limits/Loc SR -55 to Harbor Boulevard Type Of Work: Road Maintenance Additional TOW: reconstruction of roadway Project Description: This project consists of reconstruction of pavement structural section on Victoria Street from SR -55 to Harbor Boulevard. Some damaged curb/gutter, sidewalk, access ramps and driveways will be removed and reconstructed within the limits. Project Cost : 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 1 0 0 0 0 0 2,095,000 0 2,095,000 2,430,200 $0 $0 $0 $0 $0 $2,0959000 $0 $2,095,000 $2,430,200 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 30 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency : Costa Mesa m � r . Project Number: n/a Unfunded 100.00% 2,099,350 1 2,337,115 IM Project Name : Wilson Street Widening 100.00% $2,099,350 $2,337,115 Project Limits/Loc : SR -55 to Fairview Road Type Of Work: Intersection Additional TOW: add through lane(s) to intersection Project Description: This project adds EB and WB through lanes at Fairview/Wilson intersection and widens Wilson Street to 4 lanes between SR -55 to Fairview as required by General Plan Circulation Element. Project Cost „�vr 10/11 11/12 12/13 13/14 14/15 15/16 16/17 M2 RCP, Traffic Impact Fees C 0 0 0 0 1,633,500 0 0 1,633,500 1,845,855 E 0 0 211,750 0 0 0 0 211,750 211,750 R 0 0 0 254,100 0 0 0 254,100 279,510 $0 $0 $211,750 $254,100 $1,633,500 $0 $0 $2,099,350 $2,337,115 Total for Costa Mesa $2,168,588 $23,546,835 $16,592,540 $23,970,850 $19,111,750 $17,539,925 $9,480,100 $112,410,588 $120,290,784 Measure M: Yes 03 -Jun -10 Measure M Growth Management Program 1 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency • Costa Mesa r 11-01- r�a, Project Number : n/a Other 100.00% 2,298,990 1 2,360,460 JDrainage Fees/ Measure M2 Project Name : Anaheim/Superior Storm Drain Phase IV, V 100.00% $2,298,990 $2,360,460 Project Limits/Loc : 17th Street, Pomona, Ohm, Farad Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105" RCP; Concrete & asphalt improvements; Watershed modeling & recommendations; Coord. with numerous utility companies government agencies residents and businesses Project Costt 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 2,048,990 0 0 0 0 0 2,048,990 2,110,460 E 0 250,000 0 0 0 0 0 250,000 250,000 $0 $2,298,990 $0 $0 $0 $0 $0 $2,298,990 $2,360,460 Agency: Costa Mesa��a� �? Project Number : n/a Other 100.00% 793,040 836,422 JDrainage Fees/ Measure M2 Project Name : Brentwood Avenue Storm Drain ° Project Limits/Loc : Brentwood Avenue 100.00 /° $793,040 $836,422 Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105" RCP; Concrete & asphalt improvements; Watershed modeling & recommendations; Coord. with numerous utility companies, government agencies, residents and businesses. m ,. . Project Cost1t�w f c4tDlt`�, 'rtlr�W: 4# €-e��rrf�..±,`�.�� A.::......�.�-,z;.:�,:..-;�5',..��tc.z..��'��.�.�,:�.,•����aa3�.K•�''�"%:,�.�°�,.,�.,� m.�,.�.,,�,za:��'�-,:�aw����.;s�i��:"c�z:-,.."�°"`.�'f ,., .�°,..�3-`.':.' 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 723,040 0 0 0 0 723,040 766,422 E 0 0 70,000 0 0 0 0 70,000 70,000 $0 $0 $793,040 $0 $0 $0 $0 $793,040 $836,422 Measure M: No 03 -Jun -10 Measure M Growth Management Program 2 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency : Costa MesaX% FRI Project Number : n/a Other 1 100.00% 1 999,600 1 999,600 ISRTS Project Name : Broadway Traffic Calming SRTS 100.00% $999,600 $999,600 Project Limits/Loc : Broadway Traffic Calming SRTS Type Of Work: Other Additional TOW: other Project Description: Traffic calming improvements on Broadway between Orange Avenue and Irvine Avenue. Includes narrowing street, pedestrian improvements, chokers, etc. Project Cost:A 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 60,000 939,600 0 1 0 0 0 1 0 999,600 1 999,600 $60,000 $939,600 $0 $0 $0 $0 $0 $999,600 $999,600 Agency: Costa Mesa Project Number : n/a Project Name : Cherry Lake Storm Drain Phase I, II, III Project Limits/Loc : Bounded by Westminster, Sherwood, 21st Street and Santa Ana Avenue Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drainpipes ranging from 24" to Other 100.00% I 2,721,600 100.00% $2,721,600 2,958,760 JDrainage Fees, Measure M2 $2,958,760 105" RCP; Concrete & asphalt improvements; Cherry Lake and Newport watershed modeling & recommendations; Coord. with numerous utility companies, government agencies, residents and businesses. Project Cost . 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 1 0 0 1 2,371,600 0 0 0 1 2,371,600 2,608,760 E 0 1 0 0 1 350,000 0 0 0 1 350,000 350,000 $0 $0 $0 $2,721,600 $0 $0 $0 $2,721,600 $2,958,760 Measure M: No 03 -Jun -10 Measure M Growth Management Program 3 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa 2,009,3.w_� Project Number: n/a Other 100.00% 60 2,225,077 Drainage Fees, Measure M2 Project Name : Cherry Lake Storm Drain Phase 1V, V Project Limits/Loc : Upstream of Cherry Lake 100.00% $2,009,360 $2,225,077 Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105" RCP; Concrete & asphalt improvements; Cherry Lake and Newport watershed modeling & recommendations; Coord. with numerous utility companies, government agencies, residents and businesses. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 1,659,360 0 0 1,659,360 1,875,077 E 0 0 0 0 350,000 0 0 350,000 350,000 $0 $0 $0 Agency: Costa Mesa ` 4 Project Number: n/a Other Project Name : Citywide Bicycle Promotion Project SRTS Project Limits/Loc : Citywide Type Of Work: Bikeways Additional TOW: benches, fountains, lockers or other amenities for bicycles Project Description: Promotion and education of bike safety through development of a bike safety guide and map of city bike routes and trails. $0 $2,009,360 $0 100.00% I 80,000 I 80,000 100.00% $80,000 $80,000 $0 $2,009,360 $2,225,077 Protect Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 80,000 0 0 0 0 0 0 80,000 80,000 $80,000 $0 $0 $0 $0 $0 $0 $80,000 $80,000 Measure M: No 03 -Jun -10 Measure M Growth Management Program 4 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa�r�:-%~~ Project Pro'Number: n/a >° I Unfunded 100.00% 300,000 334,000 Gas Tax, General Funds Project Name : Concrete Bus Pad Installation Project Limits/Loc: Citywide 100.00% $300,000 $334,000 Type Of Work: Other Additional TOW: other Project Description: Install concrete bus pad at several locations throughout the City. Project Cost: 10/11 11/12 12/13 13/I4 14/15 15/16 16/17 C 0 50,000 50,000 50,000 50,000 50,000 50,000 300,000 334,000 $0 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 $334,000 Agency: Costa Mesa MIS- 1, bt Project Number : n/a Other 100.00% 1,176,785 1,333,071 JDrainage Fees/Measure M2 Project Name : East 17th Street Storm Drain 100.00% $1,176,785 $1,333,071 Project Limits/Loc : Tustin Avenue to Irvine Avenue Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105' RCP; Concrete & asphalt improvements; Watershed modeling & recommendations; Coord. with numerous utility companies, government agencies, residents and businesses. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 0 0 976,785 0 976,785 1,133,07I E 0 0 0 0 0 200,000 0 200,000 200,000 $0 $0 $0 $0 $0 $1,176,785 $0 $1,176,785 $1,333,071 Measure M: No 03 -Jun -10 Measure M Growth Management Program 5 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency : Costa Mesa Project Number: n/a Project Name : Gisler Avenue Bike Trail Landscaping Project Limits/Loc : Gisler Avenue Type Of Work: Aesthetics Additional TOW: landscaping of roadway Project Description: The project involves installing landscape improvements along Gisler Avenue adjacent to the bicycle trail between Washington Avenue and Santa Ana River. Project Cost Fes° 100.00% $165,000 $174,900 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 165,000 0 0 0 0 165,000 174,900 $0 $0 $165,000 $0 $0 $0 $0 $165,000 $174,900 Agency: Costa Mesa Project Number : n/a Project Name : Neighborhood Entryways Project Limits/Loc : Citywide Type Of Work: Aesthetics Additional TOW: landscaping for project location Project Description: The project involves enhancing landscaping at major entryways to neighborhoods throughout the City. 100.00% $650,000 $743,500 Project Cost . ���!!!}} ✓ t �`"'r,.- :t x�r,.. "' -�^" v� { �+:hr w'' ° _ "" '�° 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 200,000 150,000 150,000 150,000 650,000 743,500 $0 $0 $0 $200,000 $150,000 $150,000 $150,000 $650,000 $743,500 Measure M: No 03 -Jun -10 Measure M Growth Management Program 6 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa �� W'"` , �""` Project Number: n/a Gas Tax 100.00% 700,000 768,000 Project Name : New Sidewalks/Missing Link Sidewalks 100.00% $700,000 $768,000 Project Limits/Loc : Citywide Type Of Work: Pedestrian Additional TOW: new sidewalk Project Description: Construction of new and missing sidewalk segments Project Cost: 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 100,000 100,000 100,000 100,000 100,000 100,000 100,000 700,000 768,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $700,000 $768,000 Agency: Costa Mesa Project Number : n/a Project Name : Newport Boulevard Landscaping Project Project Limits/Loc : Newport Boulevard from Bristol Street to 19th Street Type Of Work : Aesthetics Additional TOW: landscaping of roadway Project Description: The project includes installing landscape improvements along Newport Bouelvard Frontage Road between Bristol Street and 19th Street. Project Cost w �„, 4a..0 � .,...?� :`..��4,v. �r,i�,uFlr'h9 �.+;���2:.J�.�.�"',��_•zl-a�+.w�',�, ..sv�eya=a... �.a.`�`�.�`..,+' ���� a�ts_x-...t �..:���..&�� �,v.���:exr.L..yw��.&��:3�''��'6343��, '.:,'��a'"+;.�'�s`��.s`�,e`� Fe.��x���k 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 1,000,000 0 0 0 0 1,000,000 1,060,000 $0 $0 $1,000,000 $0 $0 $0 $0 $1,000,000 $1,060,000 100.00% $1,000,000 $1,060,000 Measure M: No 03 -Jun -10 Measure M Growth Management Program 7 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Costa Mesa Y Agency: Project Number : n/a Other 100.00% 220,000 220,000 JOCTA, General Funds Project Name : SR -55 Freeway Extension Alternatives Study 100.00% $220,000 $220,000 Project Limits/Loc : 19th Street to 15th Street Type Of Work: Other Additional TOW: other Project Description: Project to evaluate the feasibilty of extension of SR -55 Freeway from 19th Street to 15th Street. This will be multi - jurisdictional study including Cities of Costa Mesa and Newport Beach, Caltrans and OCTA. _ Project Cost:�;�� b�'�'a'::assa:�wt.,..� .'r��.° ""r ✓':�" ..,av'''�°:"" u°s:;:� a.��� _.� v�,:._v:ki.'uk�''�'��.�"a�s,a�` "z.�',w; 'z,�.�,�°'�. ..'Y.ry`' �ah`��', =fix. �<< , a m'�: a.�.� `�`��.. J-. 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 0 0 220,000 0 0 0 0 220,000 220,000 $0 $0 $220,000 $0 $0 $0 $0 $220,000 $220,000 Agency: Costa Mesa Project Number : n/a Project Name : SR -55 Frwy. Gateway Landscape Enhancement Project Limits/Loc : SR -55 Frwy. Gateway Landscape Enhancement Type Of Work : Other Additional TOW: other Project Description: Improvements at the terminus of SR -55 at 19th Street 100.00% $650,000 $666,500 including hardscape and landscape improvements, entry monument and decorative barrier along the median. Project Cost ..,.»,,....�..,.r<,;.-`�.,_..h,.a,,.,...�.n� �c.rr� w�:-:,,Y..x s.<,....,.w'L..., ti:, ise;»„s;.asa'4 .::v"., 4 ..m�'C. � �.xi,•, .:-.am. �,z�Eic�.:°. rs.'` �.t'�Yw«,ram �.��.r,..-z,�.`��,,,�.�k"�.,�;'���"';30`� u..r,�,° 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 550,000 0 0 0 0 0 550,000 566,500 E 100,000 0 0 0 0 0 0 100,000 100,000 $100,000 $550,000 $0 $0 $0 $0 $0 $650,000 $666,500 Measure M: No 03 -Jun -10 Measure M Growth Management Program 8 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa Project Number: n/a Project Name : Street Median Improvements Project Limits/Loc : Citywide Type Of Work: Aesthetics Additional TOW: landscaping of roadway Project Description: Install medians or improve landscaping along several roadways per City standards. Project Cost.:. 4_NOON s General 100.00% 750,000 750,000 100.00% $750,000 $750,000 12/13 13/14 14/15 15/16 16/17 C 0 225,000 225,000 225,000 0 0 0 675,000 675,000 E 0 25,000 25,000 25,000 0 0 0 1 75,000 1 75,000 $0 $250,000 $250,000 $250,000 $0 $0 $0 $750,000 $750,0 Agency: Costa Mesa ]NO Project Number: n/a Other 100.00% 370,000 412,400 JGas Tax/General Funds Project Name : Traffic Signal Installation 100.00% $370,000 $412,400 Project Limits/Loc : Citywide Type Of Work: Traffic Signals Additional TOW: install new traffic signal and equipment Project Description: Install a new traffic signal at a location from the signal consideration list when appropriate warrants are met. Project Cost 10/11 11/12 12/13 13/14 14/15 15/16 16/17 C 0 0 0 160,000 0 165,000 0 325,000 367,400 E 0 0 0 20,000 0 25,000 0 45,000 45,000 $0 $0 $0 $180,000 $0 $190,000 $0 $370,000 $412,400 Measure M: No 03 -Jun -10 Measure M Growth Management Program 9 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 2016/2017 Agency: Costa Mesa; r7., s Project Number: n/a Other 100.00% 478,245 478,245 ISRTS Project Name: Victoria School Pedestrian and Bicycle Improvements 100.00% $478,245 $478,245 Project Limits/Loc : Victoria School Area Type Of Work: Pedestrian Additional TOW: other Project Description: Install enhanced crosswalks, countdown signal heads, ADA push buttons, enhanced striping, new sidewalks, and ADA ramps. Project Cost���� 10/11 11/12 12/13 13/14 14/15 15/16 16/17 E 45,000 433,245 0 0 0 0 0 478,245 478,245 $45,000 $433,245 $0 $0 $0 $0 $0 $478,245 $478,245 Agency: Costa Mesa Project Number: rda Project Name : W. 18th Street Storm Drain Project Limits/Loc : Monrovia to City Limits Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105" RCP; Concrete & asphalt improvements; Watershed modeling & recommendations; Coord. with numerous utility coinnanies. eovemment aeencies. residents and businesses. Project Cost : Measure M: No Unfunded ( 100.00% 100.00% I0/11 11/12 12/13 13/14 653,490 745,248 JDrainage Fees, Measure M2 $653,490 $745,248 14/15 15/16 16/17 C 0 0 0 0 0 573,490 0 573,490 665,248 E 0 0 0 0 0 80,000 0 80,000 80,000 $0 $0 $0 $0 $0 $653,490 $0 $653,490 $745,248 03 -Jun -10 Measure M Growth Management Program 10 Congestion Management Program Seven Year Capital Improvement Program (Sorted by Name) Fiscal Years 2010/2011 through 20162017 Agency: Costa Mesa Project Number: n/a Project Name : W. 19th Street Storm Drain (— Project Limits/Loc : 19th Street Type Of Work: Other Additional TOW: other Project Description: Installation of various storm drain pipes ranging from 24" to 105" RCP; Concrete & asphalt improvements; Watershed modeling & recommendations; Coord. with numerous utility companies, government agencies, residents and businesses. Project CostIN , k O f „ 10/11 11/12 12/13 Other 100.00% ( 823,390 918,731 100.00% $823,390 $918,731 13/14 14/15 15/16 16/17 Fees/ Measure M2 C 0 0 0 0 733,390 0 0 733,390 828,731 E 0 0 0 0 90,000 0 0 90,000 90,000 $0 $0 $0 $0 $823,390 $0 $0 $823,390 $918,731 Total for Costa Mesa $2,168,588 $23,546,835 $16,592,540 $23,970,850 $19,111,750 $17,539,925 $9,480,100 $112,410,588 $120,290,784 Measure M: No