Loading...
HomeMy WebLinkAbout- - City Project No.10-06 Farm Sports Compl. - 10/19/2010CITY COUNCIL AGENDA REPORT MEETING DATE: OCTOBER 19, 2010 ITEM NUMBER: SUBJECT: COSTA MESA FARM SPORTS COMPLEX- SOCCER FIELD (NO. 5 AND NO. 6) LIGHTING, 2750 FAIRVIEW ROAD, COSTA MESA - CITY PROJECT NO. 10-06 DATE: OCTOBER 7, 2010 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: PETER NAGHAVI, DIRECTOR, DEPARTMENT OF PUBLIC SERVICES FOR FURTHER INFORMATION CONTACT: ERNESTO MUNOZ, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by RMF Contracting, Inc. dba R&M Electrical, and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On March 16, 2010, City Council accepted a donation from the American Youth Soccer Organization (AYSO) Region 120 in the amount of $182,000 for the lighting of Fields No. 5 and No. 6 at the Farm Sports Complex. On June 22, 2010, a construction contract in the amount of $39,040.00 was awarded to RMF Contracting, Inc., dba R&M Electrical Contracting, 26301 Dimension Drive, Lake Forest, California, 92630. The scope of work consisted of installing City -furnished poles and sports lighting fixtures on Fields No. 5 and No. 6 at the Farm Sports Complex; wiring to existing power sources; relocating interfering irrigation pipes; and repairing damaged landscape and irrigation; and other work needed to complete the project in accordance with the contract documents. Before Installation i 1 _ �• 1 �•,r GeN� During Installation 1 ANALYSIS: The work required by the contract documents was completed on August 26, 2010, to the satisfaction of the City Engineer. The final contract cost amounted to $42,940.00. A report of the final costs is shown herein as Attachment "1." A summary of the costs is as follows: Original Contract Cost: Change Order No. 1: Final Contract Cost: $39,040.00 $3,900.00 $42,940.00 Change Order No. 1 in the amount of $3,900.00 was issued for the repair of damaged wiring on Field No. 1 through Field No. 4. The final contract price reflects a 10 percent (10%) increase to the original contract as a result of the aforementioned Change Order No. 1. As of this date, there are no Stop Notices filed against the monies due to R&M Contracting, Inc. dba R&M Electrical. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: There is no fiscal impact due to this item. The project was funded solely through a donation by AYSO 120 and recognized through Budget Adjustment No. 10-022. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The lightening of Costa Mesa Farm Sports Complex - Soccer Fields (No. 5 and No. 6), has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. ERNESTO MUNOZ City Engineer ATTACHMENT "1" Cost Summary DISTRIBUTION: City Manager City Attorney City Clerk Staff File PETER NAGHAVI, Director Department of Public Services E