HomeMy WebLinkAbout- - Bicycle Trail Connection Report - 12/7/2010CITY COUNCIL AGENDA REPORT
MEETING DATE: DECEMBER 7, 2010
ITEM NUMBER:
SUBJECT: BICYCLE TRAIL CONNECTION BETWEEN SANTA ANA RIVER AND UPPER
NEWPORT BAY
DATE: NOVEMBER 24, 2010
FROM: PUBLIC SERVICES DEPARTMENT - TRANSPORTATION SERVICES DIVISION
PRESENTATION PETER NAGHAVI, DIRECTOR, DEPARTMENT OF PUBLIC SERVICES
BY:
FOR FURTHER INFORMATION CONTACT: RAJA SETHURAMAN, TRANSPORTATION SERVICES
MANAGER - (714) 754-5032
RECOMMENDATION:
Authorize staff to conduct a feasibility study of a proposed bicycle trail connection between the
Santa Ana River and Upper Newport Bay partially utilizing the Paularino and Santa Ana/Delhi Flood
Control Channels (Attachment 1).
BACKGROUND:
The Transportation Services Division maintains the Citywide Master Plan of Bikeways (MPB)
(Attachment 2). The MPB designates three classes of bikeways as follows:
Class I — Off-street bicycle trails that provide dedicated concrete or asphalt pavement outside of
travel lanes;
Class II — On -street dedicated (striped) bicycle lanes; and
Class III — On -street bike routes designated with sign without any dedicated lanes.
The City has several Class I bicycle trails, Class II bicycle lanes, and Class III bicycle routes.
However, due to significant right-of-way needed, the number of Class I bicycle trails are limited in
the City. Approximately three years ago, staff completed a preliminary investigation of potential use
of existing flood control maintenance roads for development of Class I bicycle facilities. This study
determined that Paularino and Santa Ana/Delhi Channels may be suitable for providing a bicycle
trail on their existing and/or improved maintenance roads.
The utilization of flood control channels for bicycle facilities was presented to City Council at their
Study Session on May 8, 2007, and regular meetings of June 5, 2007, December 4, 2007, and
January 15, 2008. A comprehensive chronology of events of the proposed bicycle trail project is
included in Attachment 3. At the meeting of January 15, 2008, the City Council, based on resident
concerns, directed staff to suspend efforts on this project. Attachments 4 and 5 show all
correspondence from residents with regard to this project.
The Planning Commission requested staff to present this item at their November 8, 2010, meeting.
At that meeting, the Planning Commission reviewed the proposed concept and discussed the
current neighborhood concerns related to potential issues with the proposed bicycle trail. Based on
adjacent residents' concerns on the Paularino Channel, the Commission discussed graffiti,
vandalism, and alcohol and drug use within the channel area. Even though the channel is gated
and fenced at either end, it is not protected from illegal entry. The residents expressed concerns
that these problems may be exacerbated with the implementation of the bicycle trail project
providing open access to the public. The Commission, while recommending the City Council
approval of the feasibility study, directed that the study should also review the residents' concerns
and recommend measures to address these existing and future issues. The Commission also
recommended that a corridor -based study be conducted to consider other bicycle trail alignments,
including Arlington Drive.
ANALYSIS -
The City is served by major Orange County trails that run along the eastern and western
boundaries. The 22 -mile Mountains to Sea trail from Irvine Lake to Upper Newport Bay and
Newport Beach is along the eastern City boundary and on the west is the 29 -mile Santa Ana
Regional Bicycle Trail connecting Riverside County and Huntington Beach. While there are many
access connections to these regional trails in Costa Mesa, there is not a defined and direct bicycle
trail or system that links both trails.
Recently, the City's Public Services Department received a grant to add a bicycle trail connecting
the Santa Ana River Trail to Placentia Avenue adjacent to Fairview Channel within Fairview Park.
In addition, a project is currently underway that improves the Joann Street Bicycle Trail and also the
bicycle trail along Harbor Boulevard north of the Joann Street Bicycle Trail. As these various
projects are planned and implemented, it is desirable to achieve a well-defined, east -west bicycle
trail connection to upper Newport Bay. East -west bicycle facilities in Costa Mesa are typically Class
II on -street bicycle lanes and are provided on Adams Avenue, Merrimac Way, and Fair Drive.
Staff has reviewed several options for implementation of an east -west bicycle connection and has
determined that the flood control maintenance roads could be used effectively as part of this
system, based on Orange County Flood Control District (OCFCD) concurrence. The Paularino
Channel could be used to provide off-street trails from east of Fairview Road just north of Adams
Avenue to the Bristol Street/Bear Street intersection. The Santa Ana/Delhi Channel connects
Bristol Street south of Newport Boulevard North Frontage Road and Irvine Avenue. Existing bicycle
lanes on Irvine Avenue provide access to the Upper Newport Bay trail system. Further review is
required for the Bristol Street portion of the above connection between Bear Street and the Santa
Ana/Delhi Flood Control Channel, as existing right-of-way is limited for the provision of dedicated
bicycle paths or lanes. During meetings, the OCFCD agreed in "concept" that such a system could
be further considered for potential implementation.
A portion of the flood control channel bicycle system would be directly behind several single-family
and multi -family dwellings. Based on input from adjacent residents, while potential benefits exist,
concerns with the trail's negative impacts have been raised. Staff recognizes the need to outreach
to all affected residents during the planning phase to evaluate the feasibility of such a trail. Similar
bicycle trails have been successfully implemented in adjacent jurisdictions and also in other areas
of Costa Mesa.
The feasibility study will include an extensive outreach process with all residents near the proposed
trail in order to review current as well as potential concerns along the Paularino Channel, develop
measures to address these concerns, and conduct a review of alternative alignments of the bicycle
trail. Based on the results of the feasibility study and public input, a decision on whether to include
this trail in the City's MPB could be determined by the City Council. Other phases of the project
such as design, environmental review, and implementation of the project will be conducted following
the incorporation of the bicycle trail on the City's MPB based on the City Council approval process.
K
ALTERNATIVES CONSIDERED:
One alternative would be to receive and file this report.
FISCAL REVIEW:
The feasibility study, which will include outreach to the affected residents, is expected to cost
approximately $35,000. Staff will solicit proposals from qualified consultants for this service. Funds
for the feasibility study have not been budgeted at this time. Based on City Council direction, staff
will determine the feasibility of utilizing future Air Quality Management District (AQMD) grant funds
or obtain other funding sources for this study. The cost for the design and construction of the
bicycle trail will depend on the final alignment option and the mitigation measures to be
incorporated as part of the project.
LEGAL REVIEW:
There is no legal review of this item at this time.
CONCLUSION:
The Planning Commission, in order to improve the east -west bicycle facility connection between the
Santa Ana River Regional Bicycle Trail and Mountains to Sea Bicycle Trail, recommended that the
City Council approve a study to determine the feasibility of implementing this connecting system
utilizing the Paularino and Santa Ana/Delhi Flood Control Channels. This report summarizes
previous activities and analysis, as well as correspondence on this item. Staff requests the City
Council consideration of the Planning Commission's recommendation regarding the feasibility
study. The study will include an extensive outreach process with the residents in order to review
current as well as potential concerns of residents along the Paularino Channel, develop measures
to address these concerns, and conduct a review of alternative alignments of the bicycle trail.
RAJA SETHURAMAN, Manager
Transportation Services Division
DISTRIBUTION: City Manager
Assistant City Manager
City Clerk
Dev. Svcs. Director
Director of Public Services
Staff
PETER NAGHAVI, Director
Department of Public Services
ATTACHMENTS: 1 - Proposed Bicycle Trail Alignment
2— City's Master Plan of Bikeways
3— Chronology of Events
4— Correspondence Supporting Bicycle Trail along Flood Control
Channels
5— Correspondence Opposing Bicycle Trail along Flood Control
Channels
3