HomeMy WebLinkAbout07 - CC-9 - Parkway Concrete Repair and New Sidewalk - 9/6/2011CITY COUNCIL AGENDA REPORT MEETING DATE: SEPTEMBER 6, 2011 ITEM NUMBER: SUBJECT: PARKWAY CONCRETE REPAIR AND NEW SIDEWALK CONSTRUCTION PROJECT - CITY PROJECT NO. 11-08 DATE: AUGUST 25, 2011 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: PETER NAGHAVI, DIRECTOR, DEPARTMENT OF PUBLIC SERVICES FOR FURTHER INFORMATION CONTACT: ERNESTO MUNOZ, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: Adopt plans, specifications, and working details for the Parkway Concrete Repair and New Sidewalk Construction Project, City Project No. 11-08. 2. Award a construction contract to C.J. Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, California, 90670, in the amount of $338,145.00. 3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: Concrete improvements located within the City's parkways and streets require ongoing repair and maintenance due to age, maturing trees, soil conditions, water intrusion, and traffic loads. The City's Parkway Concrete Repair Program is funded to repair as many of these damaged areas as possible, and eliminate the potential liability associated with aging parkways. The locations identified for repair are prioritized based on pedestrian and handicap traffic and the severity of the damage. The list of parkway improvement locations within the scope of work of this contract is included as Attachment I ". The City's New and Missing Link Sidewalk Program addresses the installation of concrete sidewalks on City streets which do not have a continuous sidewalk. Pedestrians typically use the traffic pavement area for their path of travel where these sidewalk segments are missing. The list of missing sidewalk locations within the scope of work for this contract is included as Attachment 1 ". The Parkway Maintenance and the New and Missing Link Sidewalk Programs were combined as a single project to take advantage of economy of scale savings associated with a larger project. The scope of work under this contract consists of localized reconstruction of curb and gutter; cross gutter and spandrels; sidewalks; driveway/driveway approach; removal and planting of trees; and other work needed to complete the project in accordance with the contract documents. ANALYSIS: The City Clerk received and opened sixteen (16) bids for this project on July 12, 2011. C.J. Concrete Construction, Inc. was the apparent low -bidder with a bid proposal of $338,145.00. The Engineer's estimate was $545,030.00; and the average of the sixteen (16) bids received amounted to $516,783.18. An analysis of the bids indicates that this apparent low bidder submitted a proposal that is thirty-eight percent (38%) lower than the Engineer's estimate. The variance between the low bidder and the Engineer's estimate may be attributed to the highly competitive conditions prevalent in the construction industry at this time. The Bid Abstract is included as Attachment "2". The license and references of C.J. Concrete Construction, Inc. were checked and staff has found them to be in good standing. C.J. Concrete Construction, Inc. has successfully completed other City projects including most recently rehabilitation of Tustin Avenue (from 15th Street to 17th Street) and the 2008-09 Parkway Concrete Repair and New Sidewalk Construction Project, which focused on similar repairs in other areas of the City. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. If all the bids are rejected, the City would need to readvertise or cancel the project. Staff believes that readvertising the project will not result in lower bids. FISCAL REVIEW: Funding for this project has been budgeted with the use of Gas Tax funds. For FY 10-11, the City budgeted: $250,000 for the Parkway Improvement Program and $100,000 for the New Sidewalk/Missing Link Program. LEGAL REVIEW: C.J. Concrete Construction, Inc. has furnished the necessary bonds and insurance, which were approved as to form by the City Attorney. After the award and subsequent execution of the contract, a "Notice to Proceed" will be issued. CONCLUSION: The advertisement and bid opening for the Parkway Concrete Repair and New Sidewalk Construction Project, City Project No. 11-08 has been completed. It is recommended that the City Council adopt the plans, specifications, and working details for said project; award the contract to the apparent low bidder C.J. Concrete Construction, Inc. in the amount of $338,145.00; and authorize the Mayor and the City Clerk to execute the Public Works Agreement. ERNESTO MUNOZ City Engineer BOBBY YOUNG Finance Director ATTACHMENTS: "1" Parkway Locations "2" Bid Abstract PETER NAGHAVI, Director Department of Public Services E DISTRIBUTION: Chief Executive Officer City Attorney City Clerk Staff File AITACmEW i 2010 / 2011 PARKWAY MAINTENANCE PROJECT LIST OF STREETS WITHIN PROJECT PROPOSED PARKWAY LOCATIONS (MAINTENANf`F Apra i ICZTIKir_l MAINT. AREA LOCATION FROM TO AREA 03 AREA 06 AREA 07 E. BAY ST. MONROVIA AVE HC RAMPS - -- _� SCOTT PL. WESTMINSTER AVE TOWNE ST SANTA ANA AVE CENTER ST PLANCENTIA AVE SWAN DR MC CORMACK LN WALLACE AVE SWAN DR LONDONDERRY ST AREA 11 _ PHALAROPE CT AREA 15 BRAY LN MURRAY LN AREA 15 BELFAST AVE WATSON AVE CONWAY AVE CONWAY AVE COLLEGE AVE WATSON AVE AREA 15 AREA 15 _ -- SHANNON LN HC RAMPS KILLEYBROOKE LN HC RAMPS - AREA 15 WARREN LN BELFAST AVE CONWAY AVE AREA 15 AREA 17 - BELFAST AVE. WASHINGTON AVE KILLYBROOKE LN. - WARREN LN. CALIFORNIA ST E KNUCKL AREA 17 -CALIFORNIA ST. HC RAMPS _ IOWA ST, _ OREGON AVE AREA 17 IOWA ST HC RAMPS ALABAMA CIR. -- MINNESOTA AVE MINNESOTA AVE FREMONT LN - DE SOTO AVE. GISLER AVE ALABAMA CIR. NEW YORK AVE _ ALABAMA CIR IOWA ST. GISLER AVE AREA 17 AREA17 CALIFORNIA ST. CALIFORNIA ST. PRESIDIO DR PRESIDIO DR. AREA 17 AREA 20 AREA20 CORONADO DR CORONADO DR. - SAN JUAN LN. LA SALLE AVE. W. BAKER ST. AREA 20 AREA 20 AREA20 - CIBOLA AVE -_ --_ JUNIPERO DR. GRACE LN. --------- MINDANAO DR. PRESIDIO DR. SUTTER WY. GRACE LN, -- EA 21 MINDANAO DR. PEMBA DR. PROPOSED MISSING SIDEWALK LOCATIONS (MAINTENANCE AREA LISTING MAINT. AREA LOCATION } FROM TO AREA 08 -- - E. 18th St. / BOTH SIDES FULLERTON AVE ORANGE AVE EA 19 MAPLE ST. / BOTH SIDES VICTORIA ST. W. WILSON ST. AREA 26 MONTE VISTA AVE / SOUTHERLY -- ---------------- ORANGE AVE -- -- FAIRWAY DR AREA 26 MONTE VISTA AVE / SOUTHERLY SANTA ANA AVE MONACO TER CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES PARKWAY CONCRETE REPAIR AND NEW SIDEWALK CONSTRUCTION PROJECT CITY PROJECT NO. 11-08 BID OPENING DATE: JULY 12, 2011 BID OPENING RESULTS Bidder Ci Total Bid 1. C.J. CONCRETE CONSTRUCTION, INC. SANTA FE SPRINGS $338,145.00 $378,600.00 2. SOUTHLAND CONSTRUCTION IRVINE 3. BLACK ROCK CONSTRUCTION BREA $409,070.00 4. BUILDING CONSULTING ENGINEERS, INC. CHINO $425,380.00 5. EBS GENERAL ENGINEERING, INC. CORONA _ $440,340.00 6. KORMX, INC. WEST COVINA HUNTINGTON BEACH $443,040.00 $458,135.00 7. GOLDEN STATE CONSTRUCTORS, INC. 8. VIDO SAMARZICH, INC. 9. ARC-ACCUCON CONSTRUCTION, INC. ALTA LOMA $497,850.00 $498,764.00 LA CRESCENTA COSTA MESA 10. S. PARKER ENGINEERING, INC. $516,890.00 11. DOD CONSTRUCTION BAKERSFIELD $536,800.00 12. NOBEST, INC. GARDEN GROVE $570,000.00 ---------- 13. MALCON CIVILS, INC. IRVINE $596,210.00 14. KASA CONSTRUCTION, INC. ONTARIO $625,190.00 $687,956.80 15. YAKAR SAN DIMAS SUN VALLEY $846,160.00 16. KALBAN, INC. Average $ 516,783.18 Engineer's Estimate: $ 545,030.00