Loading...
HomeMy WebLinkAbout- - 10-10 Attachment 1 - 9/20/2011CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 3rd Payment to: R.J. NOBLE COMPANY 15505 E. LINCOLN AVE., ORANGE, CA 92865 PROJECT: ROADWAY REHABILITATION WILSON STREET - HARBOR BLVD. TO ANAHEIM AVE. Federal Project No. ESPL-5312(081) - City Project No. 10.10 DATE: 08/23/11 PAGE: 1 OF 1 PERIOD BEGINNING: 05/01/11 PERIOD ENDING: 05/31/11 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 LS Mobilization $21,700.00 100 % 0 % 100 % $21,700.00 $0.00 $21,700.00 $21,700.00 2 3,052 CY Unclassified Excavation (Final Pa) $31.50 3,052 CY 0 CY 3,052 CY $96,138.00 $0.00 $96,138.00 $96,138.00 3 775 TON Asphalt Rubber Hot Mix ARHM $75.70 794 TON 0.00 TON 794.23 TON $60,123.21 $0.00 $60,123.21 $58,667.50 4 5,800 TON Asphalt Concrete Base Course $58.30 5,383.73 TON 0.00 TON 5,383.73 TON $313,871.46 $0.00 $313,871.46 $338,140.00 5 23 EA Adjust Manhole Frame and Cover to Grade $270.00 0 EA 21 EA 21 EA $0.00 $5,670.00 $5,670.00 $6,210.00 6 19 EA Adjust Water Valve Can and Cover to Grade $300.001 0 EA 20 EA 20 EA $0.00 $8,000.001 $6,000.00 $5,700.00 7 210 LF Type C-8 Curb and Gutter $48.80 629 LF 0 LF 629 LF $30,695.20 $0.001 $30,695.20 $10,248.00 8 9 EA P.C.C. Curb Ramp $2,350.00 6 EA 0 EA 6 EA $14,100.00 $0.001 $14,100.00 $21,150.00 9 4,550 SF P.C.C. Bus Pads $16.10 3,125 SF 0.0 SF 3,125 SF $50,304.45 $0.001 $50,304.45 $73,255.00 10 3,000 SF 4" P.C.C. Sidewalk $9.40 2,794 SF 0 SF 2,794 SF $26,263.60 $0.001 $26,263.60 $28,200.00 11 3 EA Install 4'x3' Truncated Dome $460.00 0 EA 6 EA 6 EA $0.00 $2,760.001 $2,760.00 $1,380.00 12 2 EA Set/Reset Survey Monuments; Cover to Grade $1,150.00 0 EA 0 EA 0 EA $0.00 $0,001 $0.00 $2,300.00 13 110 LF Horizontal Sawcut $12.351 60 LF 0 LF 60 LF $741.00 $0.00 $741.00 $1,358.50 14 15 LF Grind Concrete Curb $37.85 0 LF 5 LF 5 LF $0.00 $189.25 $189.25 $567.75 15 4 EA Reflective Blue RPMs $5.00 0 EA 4 EA 4 EA $0.00 $20.00 $20.00 $20.00 16 1 LS Traffic Control $5,500.00 100 % 0 % 100 % $5,500.00 $0.00 $5,500.00 $5,500.00 17 1 LS Traffic Stri ing, Pavement Markings, and Signs $7,100.00 50 % 50 % 100 % $3,550.00 $3,550.00 $7,100.00 $7,100.00 18 14 EA Install Traffic Signal Loop $195.00 0 EA 14 EA 14 EA $0.00 $2,730.00 $2,730.00 $2,730.00 19 6,500 SY Subgrade Stabilization Fabric - Mirafl 600x $1.36 6,900 SY 0 SY 6,900 SY $9,384.00 $0.00 $9,384.00 $8,840.00 20 1,000 SY Pavement Engineering Fabric - Petromat $0.28 0 SY 0 SY 0 SY $0.00 $0.001 $0.00 $280.00 21 323 CY Unclassified Excavation/Overexcavation $9.55 0 CY 0 CY 0 CY $0.00 $0.001 $0.00 $3,084.65 22 610 TON CMB/Overexcavation $3.60 0 TON 0 TON 0 TON $0.00 $0.001 $0.00 $2,196.00 23 11 FA Quality Control Geotech $25,000.00 0 FA 0 FA 0 FA $0.00 $0.001 $0.00 $25,000.00 PROJECT SUBTOTAL: $632,370.92 $20,919.251 $653,290.17 $719,765.40 CCO 1 223 SF Remove/replace 6" PCC/6" CMB Driveway Approach $20.251 597 SF 0 SF 597 SF $12,089.251 $0.001 $12,089.25 88 SF Remove Driveway Approach/Fill & Regrade $7.251 88 SF 0 SF 88 SF $638.001 $0.001 $638.00 730 SF Remove/replace 8" PCC/8" CMB X-Gutter/Spandrel $22.251 913.5 SF 0.0 SF 913.5 SF $20,325.381 $0.001 $20,325.38 1 LS Additional Survey $525.00 100 % 0 % 100 % $525,001 $0.0ol $525.00 CCO 2 1 LS Extend DLC conduit & add pull boxes to connect to advanced loop detectors $7,085.40 0 % 100 % 100 $0,00 $7,085.40 $7,085.40 CCO 3 4 EA Upgrade traffic loops to Type D $231.00 0 EA 4 EA 4 EA $0.001 $924.001 $924.00 CCO 4 1 LS Revised Phasing for AC Removals/Paving and Final Quantity Adjustments $43,265.64 0 % 100 % 100 % $0.00 $43,265.64 $43,285.64 CHANGE ORDER SUBTOTAL: $33,577.63 $51,275.04 $84,852.67 PROJECT TOTAL: $665,948.55 $72,194.29 $738,142.84 $719,765.40 w