HomeMy WebLinkAbout- - Pro. Engineering Five Alley Report - 10/4/2011CITY COUNCIL AGENDA REPORT MEETING DATE: OCTOBER 4, 2011 ITEM NUMBER: SUBJECT: PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF ALLEY No. 122 (PROJECT "A") AND ALLEYS No. 28, 29, 30, 31 (PROJECT "B") ALLEY REHABILITATION PROJECT DATE: SEPTEMBER 22, 2011 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION ERNESTO MUNOZ, INTERIM DIRECTOR, PUBLIC SERVICES BY: DEPARTMENT FOR FURTHER INFORMATION CONTACT: RECOMMENDED ACTION: ERNESTO MUNOZ - (714) 754-5335 Award a contract to Kabbara Engineering, 121 North Harwood Street, Orange, California 92866, in an amount not to exceed $61,413 for design services, and authorize the Mayor and the City Clerk to execute the Professional Services Agreement (Attachment 1). BACKGROUND: On November 20, 2007, a Citywide Alley Report was presented to the City Council which outlined the condition of all City -owned (public) alleys. At that meeting, Council approved a Priority List (Attachment 2) to assist in the allocation of available revenue to fund the rehabilitation of alleys Citywide. Based on the Council -approved priorities, staff's observations, and recommendations from the City's Pavement Management System, the following Alleys are in need of pavement reconstruction at this time: Alley LIMITS From To No. 122 Mission Drive (Project "A") Mendoza Drive La Salle Avenue No. 28 Hickory Drive Ponderosa Street Alley 29 No. 29 Peppertree Ln Royal Palm Drive Alley 30 No. 30 Harbor Blvd. Baker Street Ponderosa Street No. 31 Gisler Avenue Coriander Drive Cinnamon Avenue The above listed alleys are characterized by their poor pavement condition and/or severe drainage deficiencies and are in need of immediate repair. ANALYSIS: The design scope of work for this project consists of the preparation of final plans, specifications, and construction cost estimates, and includes soil testing and structural section design; field surveying; design of drainage structures where required; and providing wheel chair ramp (WCR) designs at the alley entrances to meet American with Disabilities Act (ADA) requirements. The required design services for the project are extensive and beyond staff's resources at this time. Staff advertised the project for the design phase and received four proposals on August 29, 2011. All proposals were reviewed for compliance with the City's Request For Proposals (RFP), and the consultants were evaluated based on project understanding, depth of experience, technical expertise, ability to meet the schedule, and associated factors. After careful review of all proposals, staff has selected Kabbara Engineering as well qualified to perform the work. The firm's Project Manager exhibited a thorough understanding of the project scope, and has demonstrated to have the technical ability and expertise with similar projects their firm has completed in the City, as well as in other jurisdictions. Staff has determined the proposed cost for consultant services to be reasonable for meeting the City's requirements as listed in the Scope of Services. The cost for services translates to approximately six percent of the estimated construction cost for the project, and is well within the industry standard. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to not award a design services contract for the stated project, and perform the engineering work with City staff. Due to the volume of work and the large number of projects currently being handled by the Engineering Division, a significant delay in implementing this project would be experienced if staff were to perform the engineering in-house. Delays are estimated to be from twelve to fifteen months. FISCAL REVIEW: The Fiscal Year 2011-2012, Capital Improvement budget includes $676,000 in Gas Tax and $350,000 in CDBG revenues for Alley improvements. These budgeted funds are sufficient for the design and contract cost for the subject projects. LEGAL REVIEW: The City Attorney has reviewed and approved the attached Professional Services Agreement (Attachment 1) as to content and form. CONCLUSION: Staff completed the evaluation of the RFP's submitted for design services for the 2011-2012 Alley improvements. It is recommended that the City Council award the design services contract to Kabbara Engineering, in an amount not to exceed $61,413 and authorize the Mayor and City Clerk to execute the Professional Services Agreement. ERNESTO MUNOZ, INTERIM DIRECTOR BOBBY YOUNG, DIRECTOR OF FINANCE PUBLIC SERVICES DEPARTMENT AND INFORMATION TECHNOLOGY E Attachment: 1- Professional Services Agreement 2- Priority List Distribution: Chief Executive Officer City Attorney Director of Finance City Clerk Staff File