HomeMy WebLinkAbout05 - CC-7 - Joann St Bike Trail Improvements - 1/3/2012CITY COUNCIL AGENDA REPORT
MEETING DATE: JANUARY 3, 2012 ITEM NUMBER:
SUBJECT: JOANN STREET BIKE TRAIL IMPROVEMENTS — FEDERAL PROJECT NO. RPSTPLE
5312 (075) - CITY PROJECT NO. 09-17
DATE: DECEMBER 15, 2011
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION ERNESTO MUNOZ, INTERIM DIRECTOR, PUBLIC SERVICES DEPARTMENT
BY:
FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, INTERIM CITY ENGINEER, (714) 754-
5335
RECOMMENDATION:
1. Accept the work performed by MG Construction & Development, Inc., and authorize the City
Clerk to file the Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful
Performance Bond seven (7) months after the filing date; and release the retention monies 35
days after the Notice of Completion filing date.
BACKGROUND:
On September 21, 2010, a construction contract in the amount of $1,229,435.48 was awarded to
MG Construction & Development, Inc., 8900 Eton Avenue #C, Canoga Park, California 91304.
The scope of work included removal and replacement of existing fences along the south side of the
trail from Harbor Boulevard to its westerly limits; removal of interfering vegetation and trees;
grading; construction of irrigation and landscape improvements; installation of low-level, energy-
efficient safety lighting; and rehabilitation of the existing trail.
Before Construction
Construction Completed
1
ANALYSIS:
The construction phase for this project was completed in May 2011, and was to be followed with
a 12 month landscape maintenance period until May 2012. In August 2011, MG Construction &
Development, Inc. (MG Construction) ceased performance of the landscape maintenance. In
response to this cessation, City staff issued a notice of default to MG Construction requesting
the contractor to commence action to continue and complete the maintenance work as required
by the contract documents. MG Construction has failed to satisfactorily comply with the terms
of the contract documents and on November 30, 2011, the City issued written notification to MG
Construction that the construction contract was being terminated. Based on the contract
termination, and the incidental subsequent actions taken, the final date of work on this contract
was November 30, 2011.
A report of the final costs is shown herein as Attachment 1" and a summary of the costs is as
follows:
Original Contract Cost: $1,229,435.48
Change Orders and Final
Quantity Adjustments: $41,923.43
Final Contract Cost: $1,271,358.91
Change orders No. 1 through 6 were required to authorize the contractor to perform extra work that
was determined to be necessary during the course of the project. Change Order No. 6 also
addresses the adjustment to the contract amount to reflect final contract quantities and to reimburse
the City for the retention of a landscape maintenance contractor to complete the remaining
landscape and lighting maintenance work left unfinished by MG Construction. A summary of each
of the Change Orders is included as Attachment "2."
The final contract cost amounted to $1,271,358.91, which reflects a 3.4% increase to the original
contract as a result of the cumulative change orders and final quantity adjustments.
Currently, there are nine (9) Stop Notices filed against the monies due to MG Construction for a
total amount of $121,190.84. Each of the Stop Notices pertains to underpayments made to
subcontractors and/or suppliers used by MG Construction during the course of the project. SureTec
Insurance Company, the surety company that issued the performance bond on the project, has
provided additional bonding for each of the stop notices which will ensure that the City is protected
against further action by the Stop Notice claimants. In addition, the City is currently withholding
$129,385.91 in retention from payments due to MG Construction. The City will continue to withhold
funds from the retention monies for all disputed amounts in addition to funds to cover potential
litigation fees in accordance with California Civil Code Section 3186.
/_11110=1NLlII_110IVJ*10101i [11114N=I13
There were no alternatives considered for this item.
FISCAL REVIEW:
This project was funded with Air Quality, CDBG, Gas Tax, Park Development revenues, and a
Transportation Enhancement grant that reimbursed qualifying expenditures up to $500,000.
LEGAL REVIEW:
There is no legal review required on this item.
E
CONCLUSION:
Construction of the Joann Street Bike Trail Improvements, Federal Project No. RPSTPLE-
5312(075), City Project No. 09-17 has been completed. It is recommended that the City Council
authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after
the Notice of Completion filing date; and release the bonds accordingly.
FARIBA FAZELI ERNESTO MUNOZ, Interim Director
Interim City Engineer Public Services Department
ATTACHMENTS: "1" Cost Summary
"2" Change Order Summary
DISTRIBUTION: Chief Executive Officer
City Attorney
City Clerk
Staff
File
3
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF
Payment to: FDSI
3033 5th Avenue, Suite 300, San Diego, CA 92103
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075)
11/10/11 DATE: 11/08/11
PAGE: 1 OF 7
PERIOD BEGINNING: 07/01/11
PERIOD ENDING: 10/28/11
PROJECT A
ITEMBID
NO
QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
1
LS
1
LS
Mobilization
$51,526.00
100.0
%
0.0
%
100.0
%
$51,526.00
$0.00
$51,526.00
$51,526.00
2
1
LS
1
LS
Traffic Control
$5,000.00
100.0
%
0.0
%
100.0
%
$5,000.00
$0.00
$5,000.00
$5,000.00
4
47
EA
47
EA
Remove Existing Trees and Stumps
$300.00
47.0
EA
0.0
EA
47.0
EA
$14,100.00
$0.00
$14,100.00
$14,100.00
5
1,550
SF
1,530
SF
Construct 6" PCC over Native Soil
$6.25
1,530.0
SF
0.0
SF
1,530.0
SF
$9,562.50
$0.00
$9,562.50
$9,562.50
6
130
CY
130
CY
Unclassified Fill
$128.25
130.0
CY
0.0
CY
130.0
CY
$16,672.50
$0.00
$16,672.50
$16,672.50
10
1
EA
1
EA
Construct PCC Case D Curb Ramp
$1,860.00
1.0
EA
0.0
EA
1.0
EA
$1,860.00
$0.00
$1,860.00
$1,860.00
13
8
EA
8
EA
Furnish and Install Decorative Bollard
$768.00
8.0
EA
0.0
EA
8.0
EA
$6,144.00
$0.00
$6,144.00
$6,144.00
17
7,200
SF
7,200
SF
Const. 3" Decom.Granite w/Steel Edging
$4.33
7,200.0
SF
0.0
SF
7,200.0
SF
$31,176.00
$0.00
$31,176.00
$31,176.00
21
140
LF
140
LF
6' High CMU Wall with Split Face Block
$185.50
140.0
LF
0.0
LF
140.0
LF
$25,970.00
$0.00
$25,970.001
$25,970.00
22
1
LS
1
LS
I Landscape and Irrigation Improvements
The total amount bid for this Bid Item is $274,654.50 - the following
schedule of values will be used for Payment purposes
Landsca a and Irrigation Improvements schedule of values
22.01
32
LF
32
LF
CMU Raised Planter
$325.00
32.0
LF
0.0
LF
32.0
LF
$10,400.00
$0.00
$10,400.00
$10,400.00
22.02
6
EA
6
EA
CMU Pilaster
$1,900.00
6.0
EA
0.0
EA
6.0
EA
$11,400.00
$0.00
$11,400.00
$11,400.00
22.03
5
EA
5
EA
6' Metal Bench with Center Arm rest
$2,064.00
5.0
EA
0.0
EA
5.0
EA
$10,320.00
$0.00
$10,320.00
$10,320.00
22.04
2
EA
2
EA
Trash Receptacle, Surface Mount
$2,688.00
2.0
EA
0.0
EA
2.0
EA
$5,376.00
$0.00
$5,376.00
$5,376.00
22.05
2
EA
2
EA
Bike Rack
$1,100.00
2.0
EA
0.0
EA
2.0
EA
$2,200.00
$0.00
$2,200.00
$2,200.00
22.06
44,336
SF
44,336
SF
Landscape Fine Grading
$0.15
44,336.0
SF
0.0
SF
44,336.0
SF
$6,650.40
$0.00
$6,650.40
$6,650.40
22.07
44,336
SF
44,336
SF
Irrigation Auto
$1.77
44,336.0
SF
0.0
SF
44,336.0
SF
$78,323.70
$0.00
$78,323.701
$78,323.70
22.08
135
EA
135
EA
Trees - 24" Box
$190.00
135.0
EA
0.0
EA
135.0
EA
$25,650.00
$0.00
$25,650.00
$25,650.00
22.09
2,362
EA
2,362
EA
Shrubs - 1 Gallon
$7.00
2,362.0
EA
0.0
EA
2,362.0
EA
$16,534.00
$0.00
$16,534.00
$16,534.00
22.10
378
EA
378
EA
Shrubs - 2 Gallon
$10.00
378.0
EA
0.0
EA
378.0
EA
$3,780.00
$0.00
$3,780.00
$3,780.00
22.11
3,458
EA
3,458
EA
Shrubs - 5 Gallon
$17.00
3,458.0
EA
0.0
EA
3,458.0
EA
$58,786.00
$0.00
$58,786.00
$58,786.00
22.12
44,336
SF
44,336
SF
Decorative Bark
$0.40
44,336.0
SF
0.0
SF
44,336.0
SF
$17,734.40
$0.00
$17,734.40
$17,734.40
22.13
135
LF
135
LF
Wrought Iron Fencing
$100.00
135.0
LF
0.0
LF
135.0
LF
$13,500.00
$0.00
$13,500.00
$13,500.00
22.14
4
EA
4
EA
6'-8" CMU Signage
$3,500.00
4.0
EA
0.0
EA
4.0
EA
$14,000.00
$0.00
$14,000.00
$14,000.00
23
1
LS
1
LS
Electrical and Lighting Improvements
The total amount bid for this Bid Item is $164,200.00
- the followin
schedule of values will be used for Payment purposes
Electrical and Lighting Improvements schedule of values
Under ground Electrical
23.01
25
LF
25
LF
SVC Trench
$10.00
25.0
LF
0.0
LF
25.0
LF
$250.00
$0.00
$250.00
$250.00
23.02
25
LF
25
LF
Backfill SVC Trench
$2.00
25.0
LF
0.0
LF
25.0
LF
$50.00
$0.00
$50.00
$50.00
23.03
2,020
LF
2,020
LF
BC Trench
$1.50
2,020.0
LF
0.0
LF
2,020.0
LF
$3,030.00
$0.00
$3,030.00
$3,030.00
23.04
2,020
LF
2,020
LF
Backfill BC Trench
$0.50
2,020.0
LF
0.0
LF
2,020.0
LF
$1,010.00
$0.00
$1,010.00
$1,010.00
TOTAL (PROJECT A, Sheet 1 of 3):
j $441,005.501
$0.001
$441,005.501
$441,005.50
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF
Payment to: FDSI
3033 5th Avenue, Suite 300, San Diego, CA 92103
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075)
11110/11 DATE:
11/08111
PAGE:
2 OF 7
PERIOD BEGINNING:
07/01/11
PERIOD ENDING:
10/28/11
PROJECT A
AMOUNT
THIS EST
ITEMBID
NO
QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
Electrical and Lighting Improvements schedule of values
Under round Electrical continued
23.05
1,240
LF
1,240
LF
2#10, 1#10GRD 3/4"C
$1.10
1,240.0
LF
0.0
LF
1,240.0
LF
$1,364.00
$0.00
$1,364.00
$1,364.00
23.06
1,800
LF
1,800
LF
6#10, 1#10GRD 3/4"C
$2.40
1,800.0
LF
0.0
LF
1,800.0
LF
$4,320.00
$0.00
$4,320.00
$4,320.00
23.07
2,215
LF
2,215
LF
2#8, 1#10GRD 3/4"C
$2.40
2,215.0
LF
0.0
LF
2,215.0
LF
$5,316.00
$0.00
$5,316.00
$5,316.00
23.08
350
LF
350
LF
2#8,2#10, 1#10GRD 3/4"C
$2.50
350.0
LF
0.0
LF
350.0
LF
$875.00
$0.00
$875.00
$875.00
23.09
130
LF
130
LF
2#8,4#10, 1#10GRD 1"C
$4.00
130.0
LF
0.0
LF
130.0
LF
$520.00
$0.00
$520.00
$520.00
23.10
21
EA
21
EA
Pull Box 17"x12"x12"
$107.74
21.0
EA
0.0
EA
21.0
EA
$2,262.50
$0.00
$2,262.50
$2,262.50
Exterior Lighting
23.11
3
EA
3
EA
Fixture - Wn
$900.00
3.0
EA
0.0
EA
3.0
EA
$2,700.00
$0.00
$2,700.00
$2,700.00
23.12
3
EA
3
EA
Poles 15'- Wn
$1,200.00
3.0
EA
0.0
EA
3.0
EA
$3,600.00
$0.00
$3,600.00
$3,600.00
23.13
3
EA
3
EA
Dig Footing - Wn
$75.00
3.0
EA
0.0
EA
3.0
EA
$225.00
$0.00
$225.00
$225.00
23.14
2.33
CY
2.33
CY
Footing Concrete - Wn
$75.00
2.33
CY
0.00
CY
2.33
CY
$174.75
$0.00
$174.75
$174.75
23.15
68
EA
68
EA
Fixture - Bn
$1,275.00
68.0
EA
0.0
EA
68.0
EA
$86,700.00
$0.00
$86,700.00
$86,700.00
23.16
68
EA
68
EA
Dig Footing - Bn
$75.00
68.0
EA
0.0
EA
68.0
EA
$5,100.00
$0.00
$5,100.00
$5,100.00
23.17
20.37
CY
20.37
CY
Footing Concrete -Bn
$75.00
20.4
CY
0.00
CY
2037.
CY
$1,527.75
$0.00
$1,527.75
$1,527.75
23.18
32
EA
32
EA
Fixture S1 - In round
$1,100.00
32.0
EA
0.0
EA
32.0
EA
$35,200.00
$0.00
$35,200.00
$35,200.00
23.19
32
EA
32
EA
Fixture S1 - Concrete Slurry
$75.00
32.0
EA
0.0
EA
32.0
EA
$2,400.00
$0.00
$2,400.00
$2,400.00
23.20
4
EA
4
EA
Fixture L1 - LED Strip
$1,400.00
4.0
EA
0.0
EA
4.0
EA
$5,600.00
$0.00
$5,600.00
$5,600.00
Service and Controls
23.21
1
EA
1
EA
100A Service Switchgear
$1,200.00
1.0
EA
0.0
EA
1.0
EA
$1,200.00
$0.00
$1,200.00
$1,200.00
23.22
8
EA
8
EA
Contactors 30AMP
$50.00
8.0
EA
0.0
EA
8.0
EA
$400.00
$0.00
$400.00
$400.00
23.23
1
EA
1
EA
Timeclock
$175.00
1.0
EA
0.0
EA
1.0
EA
$175.00
$0.00
$175.00
$175.00
23.24
1
EA
1
EA
Ground Rod
$200.00
1.0
EA
0.0
EA
1.0
EA
$200.00
$0.00
$200.00
$200.00
24
1
LS
0.45
LS
Landscape and Lighting Maintenance
$5,000.00
5.0
%
95.0
%
100.0
%
$250.00
$2,000.00
$2,250.00
$2,250.00
TOTAL (PROJECT A, Sheet 2 of 3):
1 $160,110.001
$2,000.007E7$162,1
10.00
$162,110.00
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF 11/10/11 DATE: 11/08/11
6 Payment to: FDSI PAGE: 3 OF 7
3033 5th Avenue, Suite 300, San Diego, CA 92103
PERIOD BEGINNING: 07/01/11
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075) PERIOD ENDING: 10/28/11
PROJECT A
ITEMBID
NO
QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
LS
$3,000.00
CHANGE ORDERS
1 1 LS 1 LS Remove Concrete Footings $3,000.00 100.0 % 0.0 % 100.0 % $3,000.00 $0.00 $3,000.00
2
Delta 4 Plan Changes
1 LS
1
LS
Unclassifed fill, survey and grading
$6,080.00
100.0 %
0.0 %
100.0
%
$6,080.00
$0.00
$6,080.00
$6,080.00
1 LS
0.76
LS
Drains stems
$2,075.00
100.0 %
-24.1 %
75.9
%
$2,075.00
-$500.00
$1,575.00
$1,575.00
1 LS
0
R&R existing chain link fabric
$3,960.00
0.0 %
0.0 %
0.0
%
$0.00
$0.001
$0.00
$0.00
4
30 EA
30
EA
Queen Palms
$700.00
30.0 EA
0.0 EA
30.0
EA
$21,000.00
$0.00
$21,000.00
$21,000.00
22 EA
22
EA
Remove Existing Trees and Stumps (Bid Item #4)
$300.00
22.0 EA
0.0 EA
22.0
EA
$6,600.00
$0.00
$6,600.00
$6,600.00
5
1 LS
1
LS
Re -align electrical layout per Delta 5 Electrical Sheets
$6,172.80
100.0 %
0.0 %
100.0
%
$6,172.80
$0.00
$6,172.80
$6,172.80
Final Qauntity Adjustment - see final quantities above
6
1 J
LS
Credit for the furnishing and installation of one lighted bollard
top assembly
$1,000.00
0.0 %
100.0 %
100.0
%
$0.00
$1,000.00
$1,000.00
$1,000.00
Credit for the furnishing and installation of drains and grates
-$518.75
TOTAL (PROJECT A, Sheet 3 of 3):
$44,927.80
-$1,500.001
$43,427.801
$43,427.80
TOTAL PROJECT A, Sheet 1+ Sheet 2 + Sheet 3):
$646,043.301
$500.001
$646,543.301
$646,543.30
LS
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF
Payment to: FDSI
3033 5th Avenue, Suite 300, San Diego, CA 92103
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075)
11/10/11 DATE: 11/08111
PAGE: 4 OF 7
PERIOD BEGINNING: 07/01/11
PERIOD ENDING: 10/28/11
PROJECT B
ITEM
NO
BID
QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
2
3
1
1
320
LS
LS
CY
1
1
320
LS
LS
CY
Mobilization
Traffic Control
Unclassified Excavation F
$17,460.00
$3,500.00
$56.90
100.0
100.0
320.0
%
%
CY
0.0
0.0
0.0
%
%
CY
100.0
100.0
320.0
%
%
CY
$17,460.00
$3,500.00
$18,208.00
$0.00
$0.00
$0.00
$17,460.00
$3,500.00
$18,208.00
$17,460.00
$3,500.00
$18,208.00
5
15,100
SF
14,975
SF
Construct 6" PCC over Native Soil
$6.25
14,975.0
SF
0.0
SF
14,975.0
SF
$93,593.75
$0.00
$93,593.75
$93,593.75
7
2
EA
2
EA
Adjust Ex. Manhole Frame and Cover
$650.00
2.0
EA
0.0
EA
2.0
EA
$1,300.00
$0.00
$1,300.00
$1,300.00
8
3
EA
3
EA
Adjust Pull Box/Utility Cover to Grade
$325.00
3.0
EA
0.0
EA
3.0
EA
$975.00
$0.00
$975.00
$975.00
12
245
SF
62
SF
4" PCC Sidewalk
$4.00
62.0
SF
0.0
SF
62.0
SF
$248.00
$0.00
$248.00
$248.00
15
1
LS
1
LS
Install Striping and Pavement Legends
$2,805.001
100.0
%
0.0
°/U
100.0
°/U
$2,805.00
$0.00
$2,805.00
$2,805.00
16
12
EA
12
EA
Sign Panels and Posts
$140.00
12.0
EA
0.0
EA
12.0
EA
$1,680.00
$0.00
$1,680.00
$1,680.00
18
170
LF
48
LF
Construct 6" PCC (Type "A" Curb
$17.00
48.0
LF
0.0
LF
48.0
LF
$816.00
$0.00
$816.00
$816.00
19
140
SF
130
SF
Construct Modified PCC Driveway (Type B, W-12) Approach
$7.00
130.0
SF
0.0
SF
130.0
SF
$910.00
$0.00
$910.00
$910.00
CHANGE ORDERS
6
Final Quantity Adjustment - See final quantities above
TOTAL (PROJECT B):
1
$141,495.751
$0.001
$141,495.75
$141,495.75
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF
Payment to: FDSI
3033 5th Avenue, Suite 300, San Diego, CA 92103
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075)
11/10/11
PROJECT C
DATE: 11/08111
PAGE: 5 OF 7
PERIOD BEGINNING: 07/01/11
PERIOD ENDING: 10/28/11
ITEM
No
BID
QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
2
1
1
LS
LS
1
1
LS
LS
Mobilization
Traffic Control
$16,960.00
$3,500.00
100.0
/
0.0
/
100.0
%
$16,960.00
$3,500.00
$0.00
$0.00
$16,960.00
$3,500.00
$16,960.00
$3,500.00
100.0 % 0.0 % 100.0 %
4
3
EA
3
EA
Remove Existing Trees and Stumps
$300.00
3.0
EA
0.0
EA
3.0
EA
$900.00
$0.00
$900.00
$900.00
5
420
SF
420
SF
Construct 6" PCC over Native Soil
$6.25
4200.
SF
0.0
SF
4200.
SF
$2,625.00
$0.00
$2,625.00
$2,625.00
7
2
EA
2
EA
Adjust Ex. Manhole Frame and Cover
$650.00
2.0
EA
0.0
EA
2.0
EA
$1,300.00
$0.00
$1,300.00
$1,300.00
11
11
EA
11
EA
Remove Ex.Steel Bollard and Footing
$200.00
11.0
EA
0.0
EA
11.0
EA
$2,200.00
$0.00
$2,200.00
$2,200.00
13
11
EA
11
EA
Furnish and Install Decorative Bollard
$768.00
11.0
EA
0.0
EA
11.0
EA
$8,448.00
$0.00
$8,448.00
$8,448.00
14
2,054
LF
2,019
LF
Furnish and Install 6' High Vinyl Coated Chain link Fence
$26.40
2,019.0
LF
0.0
LF
2,019.0
LF
$53,301.60
$0.00
$53,301.60
$53,301.60
15
1
LS
1
LS
Install Stripingand Pavement Legends
$4,200.00
100.0
%
0.0
%
100.0
%
$4,200.00
$0.00
$4,200.00
$4,200.00
16
7
EA
7
EA
Furnish and Install Sign Panels and Posts
$140.001
7.0
EA
0.0
EA
7.0
EA
$980.00
$0.00
$980.00
$980.00
22
1
L.S.
1
L.S.
Landscape and Irrigation Improvements
The total amount bid for this Bid
Item is $87,966.40
- the followingschedule of values will be used for Pa ment purposes
Landscape and Irrigation Improvements schedule of values
22.06
14,832
SF
14,832
SF
Landscape Fine Grading
$0.15
14,832.0
SF
0.0
SF
14,832.0
SF
$2,224.80
$0.00
$2,224.80
$2,224.80
22.07
14,832
SF
14,832
SF
Irrigation Auto
$2.94
14,832.0
SF
0.0
SF
14,832.0
SF
$43,606.08
$0.00
$43,606.08
$43,606.08
22.08
53
EA
53
EA
Trees - 24" Box
$201.00
53.0
EA
0.0
EA
53.0
EA
$10,653.00
$0.00
$10,653.00
$10,653.00
22.09
1,354
EA
1,354
EA
Shrubs -1 Gallon
$7.00
1,354.0
EA
0.0
EA
1,354.0
EA
$9,478.00
$0.00
$9,478.00
$9,478.00
22.11
937
EA
937
EA
Shrubs - 5 Gallon
$17.15
937.0
EA
0.0
EA
937.0
EA
$16,071.72
$0.00
$16,071.72
$16,071.72
22.1
14,832
SF
14,832
SF
Decorative Bark
$0.40
14,832.0
SF
0.0
SF
14,832.0
SF
$5,932.80
$0.00
$5,932.80
$5,932.80
23
1
L.S.
1
L.S.
Electrical and Lighting Improvements
The total amount bid for this Bid
Item is $99,100.00
- the followingschedule of values will be used for Pa ment purposes
Electrical and Lighting Improvements schedule of values
Under round
ctricalli
23.03
3,030
LF
3,030
LF
BC Trench
$1.50
3,030.0
LF
0.0
LF
3,030.0
LF
$4,545.00
$0.00
$4,545.00
$4,545.00
23.04
3,030
LF
3,030
LF
Backfill BC Trench
$0.50
3,030.0
LF
0.0
LF
3,030.0
LF
$1,515.00
$0.00
$1,515.00
$1,515.00
23.07
635
LF
635
LF
2#8, 1#10GRD 3/4"C
$3.25
635.0
LF
0.0
LF
635.0
LF
$2,063.75
$0.00
$2,063.75
$2,063.75
23.08
650
LF
650
LF
2#8, 2#10, 1#10GRD 3/4"C
$2.75
650.0
LF
0.0
LF
650.0
LF
$1,787.50
$0.00
$1,787.50
$1,787.50
23.09
1,470
LF
1,470
LF
2#8, 4#10, 1#10GRD 1"C
$4.50
1,470.0
LF
0.0
LF
1,470.0
LF
$6,615.00
$0.00
$6,615.00
$6,615.00
23.10
6
EA
6
EA
Pull Box 17"x12"x12"
$125.29
6.0
EA
0.0
EA
6.0
EA
$751.75
$0.00
$751.75
$751.75
Exterior Li htin
23.15
48
EA
48
EA
Fixture - Bn
$1,600.00
48.0
EA
0.0
EA
48.0
EA
$76,800.00
$0.00
$76,800.00
$76,800.00
23.16
48
EA
48
EA
Dig Footing - Bn
$75.00
48.0
EA
0.0
EA
48.0
EA
$3,600.00
$0.00
$3,600.00
$3,600.00
23.2
14.22
CY
14.22
CY
Footing Concrete - Bn
$100.00
14.2
CY
0.00
CY
14.2
CY
$1,422.00
$0.00
$1,422.00
$1,422.00
A-2
22,222
SF
22,220
SF
Remove Ex 3" AC/3" AB Pavement and Construct 6" PCC
Pavement on Compacted Native (Replaces Bid Items 9 and
20
$8.59
22,220.0
SF
0.0
SF
22,220.0
SF
$190,869.80
$0.00
$190,869.80
$190,869.80
24
1
LS
0
LS
Landscape and Lighting Maintenance
$5,000.00
5.0
%
95.0
%
1 100.0
%
1 $250.001
$2,000.001
,250.00
$2,250.00
TOTAL (PROJECT C, Sheet 1 of 2):
1 $472,600.801
$2,000.001
$474,600.801
$474,600.80
CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF
Payment to: FDSI
3033 5th Avenue, Suite 300, San Diego, CA 92103
PROJECT: Joann Street Bike Trail Improvements
City Project No. 09-17; Federal No. RPSTPLE-5312(075)
11110/11
PROJECT C
DATE: 11/08111
PAGE: 601`7
PERIOD BEGINNING: 07/01/11
PERIOD ENDING: 10/28/11
ITEM BID
NO QUANTITY
FINAL
QUANTITY
DESCRIPTION
UNIT I
PRICE
PREVIOUS QUANTITY TOTAL QUANTITY
QUANTITY THIS ESTIMATE TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
CHANGE ORDERS
3
1,060 LF
1,060 LF
Install 12" rigid plastic barrier
$6.58
1,060.0 LF 0.0 LF 1,060.0 LF
$6,974.80
$0.00
$6,974.80
$6,974.80
4 EA
4 EA
Remove Existing Trees and Stumps (Bid Item #4)
$300.00
4.0 EA 0.0 EA 4.0 EA
$1,200.00
$0.00
$1,200.00
$1,200.00
1 LS
1 LS
Electrical changes per Delta 3 plans
$544.26
100.0 % 0.0 % 100.0 %
$544.26
$0.00
$544.26
$544.26
6
Final Qauntity Adjustment - see final quantities above
TOTAL (PROJECT C, Sheet 2 of 2):
$8,719.061
$0.001
$8,719.061
$8,719.06
TOTAL (PROJECT C, Sheet 1 + Sheet 2)
1 $481,319.861
$2,000.001
$483,319.861
$483,319.86
TOTAL (PROJECT A + PROJECT B + PROJECT C):
1 $1,268,858.911
$2,500.001
$1,271,358.91
$1,271,358.91
ATTACHMENT 2
JOANN STREET BIKE TRAIL IMPROVEMENTS
MG CONSTRUCTION & DEVELOPMENT, INC.
FEDERAL NO. RPSTPL-5312(075)
CITY PROJECT NO. 09-17
Change Order Summary
DESCRIPTION
AMOUNT
PERCENT
TOTAL %
Original Contract Amount
$1,229,435.48
CCO #01
Remove buried concrete footings
$3,000.00
0.2440%
0.2440%
CCO #02
Additional grading and drainage
improvements
$8,155.00
0.6633%
0.9073%
CCO #03
Install plastic barrier along the south side of
the trail
$8,719.06
0.7092%
1.6165%
CCO #04
Remove decaying trees and plant 30 new
Queen Palms
Upgrade electricl system
Final Quantity Adjustments
$27,600.00
2.2449%
3.8615%
CCO #05
$6,172.80
0.5021%
4.3635%
CCO #06
($11,723.43)
-0.9536%
3.4100%
TOTAL
$41,923.43
$41,923.43 3.4100%