Loading...
HomeMy WebLinkAbout07 - CC-8 - Parkway Concrete Repair and New Sidewalk - 2/21/2012CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 21, 2012 ITEM NUMBER: SUBJECT: PARKWAY CONCRETE REPAIR AND NEW SIDEWALK CONSTRUCTION PROJECT, CITY PROJECT NO.11-08 DATE: FEBRUARY 9, 2012 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, INTERIM DIRECTOR, DEPARTMENT OF PUBLIC SERVICES FOR FURTHER INFORMATION CONTACT: FARIBA FAZELL INTERIM CITY ENGINEER, (714) 754- 5335 RECOMMENDATION: 1. Accept the work performed by C.J. Concrete Construction, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On September 6, 2011, a construction contract in the amount of $338,145.00 was awarded to C.J. Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, California, 90670 for the construction of the City's Annual Parkway Maintenance Program. The scope of work under this contract consisted of localized reconstruction of damaged curb and gutter; cross gutter and spandrels; driveway/driveway approach; and sidewalks. All of the work was performed in accordance with the contract documents. ANALYSIS: This contract positively impacted neighborhoods throughout the City by reconstructing approximately 22,904 square feet of damaged sidewalk and 37 driveways; installing 30 new access ramps in compliance with the Americans with Disabilities Act (ADA); and removing and reconstructing approximately 3,941 linear feet of curb and gutter. In addition, 434 linear feet of new sidewalk was installed to improve pedestrian accessibility. This project will significantly reduce the City's liability associated with damaged concrete parkway improvements in these areas. The work required by the contract documents was completed on January 13, 2012 to the satisfaction of the City Engineer. The final contract cost amounted to $333,530.30. A report of the final costs is included herein as Attachment " 1 ". A summary of the costs is as follows: Original Contract Cost: $338,145.00 Final Quantity Adjustments: ($2,614.70) Final Contract Cost: $335,530.30 The final contract price reflects a 0.8% decrease to the original contract as a result of the aforementioned final quantity adjustments. A listing of the parkway repair and new sidewalk construction locations completed with this contract is shown herein as Attachment 2. Each street was reviewed, prioritized, and repaired based on the City's parkway repair criteria. As of this date, there are no Stop Notices filed against the monies due to C.J. Concrete Construction, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded from Gas Tax revenue from the Fiscal Year 2010-2011 budget. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The Parkway Concrete Repair and New Sidewalk Construction Project, City Project No. 11-08 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. l Q C,(I "S4' - F RIBA FAZEL ERNESTO MLYNOZ, Interim Director Interim City Engineer Department of Public Services `a ATTACHMENT: DISTRIBUTION: "1" Cost Summary "2" List of Locations Chief Executive Officer Assistant CEO City Attorney City Clerk Staff 3 r3 ATTACHMENT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N O N O M N f� O N O M O O O 10 O N O M O N O O N O) M O N O Z ` f9 NH fA NW M NM M M NN Z. VCM CMl � O O O N O M O O O O O O O O O O O O O O O O O O O O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 0 O M M M � a ¢ NO) (m0- N Y fA N N O 1MO M Om1 N t9 � di N M O m M N en 0 fA OOJ YM1 f9 DOO�`� MM NM fA Mf9 M O 0 O 0 O 0 M O O O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O O O 0 O M 0 r M 00 O IA O 4A O bf O O fA O fA O fA O t9 O f9 O M O 19 O f9 O f9 O aa fA O O O N N (pO oq NM N M M fA M f9 �j O N ¢r S M M M O O O M O M M N O O O O O O O O O O O O O O O O O O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 YI O N N 1� N O O) N fA fA OI (O N O O n N M M fN 10 nM t6 1 fA f9 fA i9 c4 L,; M W � M G F9 fH N C J J Z O J aa a Q J LL LL LL LL LL LL LL LL fq !q W m W W IQi IQi Q. O N O O O O M O O O M O 0 0 0 0 0 0 0 0 QD Nj ri M- �j Nj N r 6q O 0 0 0 0 0 0 0 0 f J O F V M O) N M (O 1D O V M O c •- Q ¢ f LL LL LL LL Z LL Q Q Q LL Q Q Q Q Q Q Q Q Q r W w N W W J LL LL. LL LL LL LL LL LL LL LL ��CJOONOO O OO O OOo00000 LL LL LL LL Z LL Q LL Q Q LL Q Q Q Q Q Q Q Q Q J J m m 0 J W N W W J LL LL LL LL LL LL LL LL LL LL O N O O O O M O. O O M O 0 0 0 0 0 0 0 0 op OO 0— 0 0 0 60 M M N N 0 0 0 O O O N O O O O O O O O O 0 0 0 0 0 0 0 0 w MW S M N N N� N ro m Z Oa M (9 F9 N iA F9 19 O f9 fA N f9 O � � � M f9 N fA f9 tO] N N M a m a y'o� m O y ni m m N C 6 nom O U g a' N W `m m-' d U'°2 t5 (S oo •- w L S u co � aK aid uHi 9aa nE P �mv om 'v' `^ 10KK m V N v N O a V a D IL o U U 3 d 2 E —6 A_— O E> 3> > mU n u'i o o tt KyfF t; O v 00 nM na m `m oy `v 3 `v `m `m a `v `m 0 0 m a 5 U c U' O m in m m Q J9 tR E E-- E E E E E E E U t t r X 22 O O i J o- H~ V p F' C t; E V o y 6 a a 5 E uvii c c o m v v m0 v v v rcrcUU�xSUrca a`a a`w� aaaat=a�a�a LLQ LL Q Q LL Q Q Q QI Q QIQ Q QIQ JJ N fn J W N W W J LL LL LL LL LL LL a LL LL LL Z FO -= w o ATTACHMENT ATTACHMENT 2 2010 12011 PARKWAY MAINTENANCE PROJECT LIST OF STREETS WITHIN PROJECT PARKWAY LOCATIONS (MAINTENANCE AREA LISTING) MAINT. AREA LOCATION FROM TO AREA03 E. BAY ST. WESTMINSTERAVE TOWNEST SANTA ANA AVE CENTER ST AREA06 MONROVIA AVE HC RAMPS - AREA07 SCOTT PL. WALLACE AVE PLANCENTIAAVE AREA 11 PHALAROPE CT SWAN DR SWAN DR AREA 11 PLACENTIAAVE WILSON ST ESTANCIA N. ST AREA 15 BRAY LN LONDONDERRY ST MC CORMACK LN AREA15 MURRAYLN BELFASTAVE CONWAY AVE AREA15 SHANNON LN HC RAMPS WATSON AVE COLLEGE AVE AREA15 KILLEYBROOKE LN HC RAMPS CONWAY AVE WATSON AVE AREA15 WARREN LN BELFASTAVE CONWAY AVE AREA15 BELFAST AVE. KILLYBROOKE LN. WARREN LN. AREA17 WASHINGTON AVE CALIFORNIA ST KNUCKLE AREA17 CALIFORNIA ST. HC RAMPS IOWA ST. OREGON AVE AREA17 IOWA ST HC RAMPS GISLERAVE NEW YORK AVE AREA17 ALABAMA CIR. ALABAMA CIR. ALABAMA CIR. AREA17 MINNESOTAAVE CALIFORNIAST. IOWA ST. AREA17 MINNESOTAAVE CALIFORNIAST. GISLERAVE AREA 20 FREMONT LN PRESIDIO DR PRESIDIO DR. CORONADO DR CORONADO DR. AREA 20 DE SOTO AVE. AREA 20 CIBOLA AVE PRESIDIO DR. SAN JUAN LN. AREA20 JUNIPERO DR. SUTTERWY. LA SALLE AVE. AREA 20 GRACE LN. GRACE LN. W. BAKER ST. AREA 21 MINDANAO DR. MINDANAO DR. PEMBA DR. MISSING SIDEWALK LOCATIONS (MAINTENANCE AREA LISTING) MAINT. AREA LOCATION FROM TO AREA 08 E. 18th St. / BOTH SIDES FULLERTON AVE ORANGE AVE AREA 19 MAPLE ST. / BOTH SIDES VICTORIA ST. W. WILSON ST. AREA26 MONTE VISTA AVE/SOUTHERLY ORANGE AVE FAIRWAY DR AREA26 MONTE VISTAAVE/SOUTHERLY SANTA ANA AVE MONACO TER