EXHIBIT B
PROPOSED SITE IMPROVEMENTS BY CITY
Initial Term Site Improvements:
PARKING LOT REMOVAL AND REPLACEMENT
City shall be responsible for administering the removal and replacement
contract and paying two-thirds of the project costs. City design and
specifications are subject to approval by Fairview Development Center
(FDC). Construction shall be completed in Fiscal Year 2012-2013.
Parking lot costs will be evenly split between the City of Costa Mesa, FDC,
and AYSO. The City will pay for the entire project then invoice FDC and
AYSO for their shared cost.
MAINTENANCE OF PORTABLE LOCKABLE RESTROOMS
MAINTENANCE OF TURF
Mowing
Aerating
Sprinkler and irrigation controller maintenance
Verticutting
Fertilization
Litter Control (for days of use only)
Rodent and Pest control
WATERING
Other Permanent Improvements to be done by CITY after adoption of FACILITY
Master Plan as funding permits:
Removal of unused blacktop area (within 6 months after approval of Master Plan)
Removal of fencing around unused black top area
Installation of beach volleyball court
Installation of bocce ball courts (2)
Additional Parking Facilities
Permanent lighting
Picnic area improvements
ADA to Code for area
Monument signage naming the field as the FDC Special Olympics Training Facility
Other items as agreed to by FDC and CITY in the Master Plan