Loading...
HomeMy WebLinkAbout- - Harbor Blvd Rehab City Project No.12-01 - 5/1/2012CITY COUNCIL AGENDA REPORT MEETING DATE: MAY 1, 2012 ki=1J,IZR]J,I-]4 � SUBJECT: HARBOR BOULEVARD REHABILITATION PROJECT (FROM BAKER STREET TO SOUTH COAST DRIVE), CITY PROJECT NO.12-01 DATE: APRIL 19, 2012 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, ACTING DIRECTOR, PUBLIC SERVICES DEPARTMENT FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, INTERIM CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Adopt plans, specifications, and working details for the Harbor Boulevard Rehabilitation Project (from Baker Street to South Coast Drive), City Project No. 12-01. 2. Award a construction contract to R.J. Noble Company, 15505 East Lincoln Avenue, Orange, CA 92865, in the amount of $837,124.48. 3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: Based on staff's observations and recommendations from the City's Pavement Management System, Harbor Boulevard (from Baker Street to South Coast Drive) is in need of pavement rehabilitation at this time. ANALYSIS: The pavement rehabilitation process on Harbor Boulevard consists of localized reconstruction of damaged asphalt concrete; mill and overlay the roadway with asphalt rubber hot mix; removal and reconstruction of damaged sidewalk, curb and gutter, driveway approaches, and bus pad; new traffic striping, loop detector replacement and traffic control; and all other tasks necessary to perform and complete the work as required per the contract documents. The City Clerk received and opened six (6) bids for this project on March 22, 2012. R.J. Noble Company was the apparent low bidder with a base bid proposal of $837,124.48. The Engineer's estimate was $915,471.35; and the average of the six (6) bids received for this project amounted to $900,225.34. An analysis of the bids indicates that the apparent low bidder submitted a proposal that is 8.5 percent lower than the Engineer's estimate. The variance between the low bidder and the Engineer's estimate may be attributed to continued competitive conditions in the construction industry at this time. The Bid Abstract is included as Attachment 1". The license and references of R.J. Noble Company were checked and staff has found them to be in good standing. R.J. Noble Company has successfully completed many projects in the City of Costa Mesa including most recently the rehabilitation of Orange Avenue, 18th Street, South Coast Drive (Harbor Boulevard to Hyland Avenue), Mendoza Drive, Santa Ana Avenue (17th Street to 22"d Street) and Wilson Street (Harbor Boulevard to Anaheim Avenue). ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. If all the bids were rejected, the City would then need to readvertise or to cancel the project. Staff believes that readvertising the project will not result in lower bids. FISCAL REVIEW: Funding for this project is available from appropriated Measure "M" turn back revenues. LEGAL REVIEW: R.J. Noble Company has furnished the necessary bonds and insurance, which have been approved as to form by the City Attorney's office. After the award and subsequent execution of the contract, a "Notice to Proceed" will be issued. CONCLUSION: The City has received bids for the Harbor Boulevard Rehabilitation (from Baker Street to South Coast Drive), City Project No. 12-01. Staff has evaluated all of the bids and recommends that the City Council adopt the plans, specifications, and working details for said project; award the contract to the apparent low bidder R.J. Noble Company in the amount of $837,124.48; and authorize the Mayor and the City Clerk to execute the Public Works Agreement. 6 RAJA SETHURAMAN, Acting Director Public Services Department ATTACHMENTS: "1" Bid Abstract FARIBA FAZELI Interim City Engineer DISTRIBUTION: Chief Executive Officer City Attorney City Clerk Interim Development Services Director Staff File 2 ATTACHMENT 1 CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES HARBOR BLVD REHABILIATION PROJECT (FROM BAKER STREET TO SOUTH COAST DRIVE) CITY PROJECT NO. 12-01 BID OPENING RESULTS 03-22-2012 Total Base Bid Bidder City Total Base Bid Plus Additive Bid Items 1. R.J. NOBLE COMPANY ORANGE $837,124.48 $1,268,267.88 2. ALL AMERICAN ASPHALT CORONA $848,132.00 $1,600,991.00 3. EBS GENERAL ENGINEERING, INC. CORONA $866,000.00 $1,208,187.00 4. BANNAOUN ENGINEERS CHATSWORTH $897,211.85 $1,109,075.05 CONSTRUCTORS CORP. 5. SEQUEL CONTRACTORS, INC. SANTA FE SPRINGS $962,424.25 $1,469,437.25 COMPANY _ (LONG BEACH 1 $990,459.461 $1,647,567.46 Average $ 900,225.34 $ 1,383,920.94 Engineers Estimate: $ 915,471.35 $ 1,363,731.35