HomeMy WebLinkAbout- - Amendment PA-02-11A for 113 Residential - 4/17/2012CITY COUNCIL AGENDA REPORT
MEETING DATE: APRIL 17, 2012 ITEM NUMBER:
SUBJECT: AMENDMENT TO PLANNING APPLICATION PA -02-11A FOR DEVELOPMENT OF 113
RESIDENTIAL UNITS (PHASE 3 OF PREVIOUSLY APPROVED 145 -UNIT PROJECT)
LOCATED AT 421 BERNARD STREET
DATE: APRIL 6, 2012
FROM: PLANNING DIVISION/DEVELOPMENT SERVICES DEPARTMENT
PRESENTATION BY: MINOO ASHABI, SENIOR PLANNER
FOR FURTHER INFORMATION CONTACT: MINOO ASHABI, AIA (714) 754-5610
minoo.ashabi@costamesaca.gov
RECOMMENDATION
Approve the project by taking the following action:
Adopt resolution to adopt Addendum to Final Environmental Impact Report
No. 1050 and approve Master Plan Amendment PA -02-11A, subject to
conditions.
BACKGROUND
Original Project Approved in 2004
In April 2003, City Council approved the original project "Plaza Residences" project
containing the residential and commercial site located at 1901 Newport Boulevard
involving a 161 -unit condominium project. The application also included a site-specific
amendment to the Land Use Element to allow for development of the five -level parking
structure (four -level; a minor modification for the four -foot encroachment of balconies and
patio areas into the 20 -foot setback along Bernard Street and Harbor Boulevard was also
required; and a General Plan amendment (Planned Development Commercial - PDC) to
allow the site-specific residential density and FAR. The Zoning Code was also amended
to reflect the site-specific basis to accommodate the" proposed high-density residential
uses (42 du/ac) and site-specific FAR of 0.70.
L
PLANNING APPLICATION SUMMARY
Location: 401 Bernard Street Application: PA -02-11A
Request: Development of 113 for -rent residential units on a vacant site originally approved for 145 units.
A parking structure and 32 units have been built during phase one and two.
SUBJECT PROPERTY: SURROUNDING PROPERTY:
Zone: PDC North: Single and multiple family residences
General Plan: Commercial Center South: Methodist Church, Commercial across 19 St.
Lot Dimensions: Irregular East: Commercial and residential condos.
Lot Area: 2.46 acres (balance of 3.61 acre west: Commercial, retail uses
residential site area of mixed-use
development)
Existing Development: Vacant parking lot
Development Standard Required/Allowed Proposed/Provided
N
Lot Area
1 acre
2.46 acres
(Overall original residential site
area is 3.61 acres
Density of Residential
20 du/acre
40 du/acre
(per previous entitlement
Perimeter Open Space
20 feet abutting public ROW
20 feet — Harbor Blvd.
16 feet- Bernard St.*
Common Open Space
42 % min.
Building Height
4 stories and 3 stories along
Bernard
50 feet
4 stories and 3 stories along
Bernard
48 feet
Parking Structure Height
Six levels / 60 feet
five levels above rade
Five levels /45 feet
four levels above rade
Building Setbacks
Front Bernard St.
20 ft.
16 ft.
Side Harbor Blvd.
20 ft.
20 ft.
Rear (commercial use)
-0- ft.
-0- ft.
Patios and balconies
Encroach 2 feet in setback along
Bernard St.
Noise barriers required
16 ft. building setback along
Bernard St.
Noise barriers not proposed'
Parking:
Parking in structure covered 283 283**
Surface parking -0- -0-
*subject to approval of a Minor Modification for walls, patios, and balconies.
** original approval included 40 additional spaces by City Council because private garages were proposed
*** subject to approval of a variance to exempt outdoor private spaces (i.e., patios, balconies)
CEQA Status Addendum to Final Environmental Impact Report FEIR No. 1050
Final Action City Council
N
From April to August 2004, there were several public hearings involved in rehearing the
proposed project. A rehearing and subsequent settlement negotiations between
interested parties were conducted during a six-month period, leading to a reduction in the
overall density and height of the proposed project.
In January 2004, the City Council approved Master Plan PA -02-11 for development of
145 condominium units (40/du per acre) for the residential site. The project included the
residential condominiums in four separate three- to four-story buildings with associated
recreational amenities. The project also included a parking structure (two-level
subterranean) that would exclusively serve residents of the development. The project was
required to provide a total of 415 parking spaces including 40 surplus spaces, located in
the City's Downtown Redevelopment project area and subject to inclusionary housing
requirements.
The first phase of the project including 32 condominium units and a five -level mixed use
parking structure to serve the residential and commercial uses was completed in 2008.
Construction of the remainder of the project was on hold and the site became subject to a
foreclosure proceeding. The site has been recently acquired by Fairfield Residential
Company LLC., which will be carrying out the remaining phases of the project.
A tentative tract map was also approved and recorded with the initial phase of the project
for the condominium development (Tract Map 16382). The map is still valid and the
applicant may choose to sell the proposed for -rent units as condominiums if they are built
to condominium standards.
Park fees in the amount of $700,218 have been remitted to the City upon recordation of
the map and may be applied for future park -related improvements and acquisitions, as
applicable. No other pending park fees will be applicable for the project.
ANALYSIS
PROJECT LOCATION
The overall 7.79 -acre site is generally bound by Bernard Street to the north, West 19th
Street to the south, Newport Boulevard to the east, and Harbor Boulevard to the west.
A private access driveway traverses the site in a north -to -south direction. Approximately
4.18 acres of the site is currently developed with the 1901 Newport Plaza office building
and another approximately 1.15 acres is developed with 32 condominium units. The
remaining acreage (2.46 acres) which is currently proposed for development with 113
apartments is within an undeveloped, grassy area at the corner of Bernard Street and
Harbor Boulevard.
Project Description
The proposed project includes 113 units in one building connected with a parking
structure that wraps around the existing condominium project to the east and the
existing commercial buildings to the south. The buildings are proposed as three- and
four-story structures, with the three stories facing Bernard Street. The number of units
for the overall project has remained the same, which includes 41 one bedrooms, 64 two
bedrooms, eight three bedrooms for a total of 113 units.
3
. - • •. •
Original Entitlement Proposed Amendment to
Master Plan
Density 40 du/acre 40 du/acre
No. of Units
113 units (balance of the originally approved
113 units
64
145 units
192
Ownership
Condominiums
For -rent units built to condo
standards andspecifications
Parking
318 spaces
283 spaces per zoning code
A 5 -level parking structure and 2 -levels
5- level parking structure
subterranean parking over residential
(4 above grade)
structures
Important Note:
40 surplus parking spaces above Code -
required parking were added pursuant to
Council direction to account for two -car
enclosed garages potentially being used as
storage
Housing type
Two-story Townhomes and one-story flats
Apartment flats
Number of Bedrooms
All 2 -bedroom units
Mix of 1, 2, and 3 bedroom units
Common Open space
42 percent
42 percent
Building Height
Four- and three-story buildings
Four- and three-story buildings
Parking Structure Height
Six level structure (five levels above grade,
Five level parking structure (4
one level below grade)
levels above grade, one level
below rade
Setbacks
Harbor Blvd. — 20 ft.
Harbor Blvd. — 20 ft.
Bernard Street — 20 ft. with 4 -foot .
Bernard Street —16 ft.
encroachment of balconies
Alley - 0 feet parking structure
Alley — 20 ft. residential structure except at
14 ft. residential structure
corner (Harbor Blvd.)
Patios/balconies
Sound glass barrier required
Variance requested to exempt
patios and balconies from noise
standards
Parking
The original entitlement approved 145 units and 415 parking spaces; this includes 40
surplus parking spaces above code requirements. With the first phase of the project, 32
condominium units were built and 97 residential parking spaces; 318 spaces were
included in the final phase of the project. With this amendment, the applicant is proposing
to provide 283 parking spaces consistent with the zoning code requirements.
The parking structure is proposed with five levels (four levels above ground and one
subterranean) that will connect to the easterly portion of the building and contain 283
parking spaces as required by the zoning code as follows:
Type of units
Parking requirement per unit
Total
41FOne
covered, 0.5 open and 0.5 guest parkin
103
64
One covered, 1.5 open, and 0.5 guest parkin
192
8
One covered, 2.5 open, and 0.5 quest arkinF
32
283*
*covered parking spaces reduce the required number by 0.25 space per unit and guest parking reduced by
0.25 for projects with more than 50 units.
4
Access/Circulation
Vehicular access to the proposed project would be from the project entrance on Bernard
Street. This entrance would be gated for security and would lead directly into the first
(ground) level of the parking structure. Pedestrian access would also be available along
Bernard Street and the private drive along the east side of the Pacific Gateway
Apartments Project site, which would separate the existing Pacifica condominium
residences from the proposed apartments.
Open Space and Landscaping
Approximately 42 percent of the residential site area would be retained as open space
through the provision of common open space and private patios and balconies. Common
open space would be a landscaped courtyard, a covered outdoor lounge/patio and pool
and landscaped walkways and setback areas located along the edges of the proposed
residential development with larger areas fronting Bernard Street.and Harbor Boulevard.
Along Harbor Boulevard, the proposed apartment building would be set back
approximately 20.7 feet from the Harbor Boulevard right-of-way and 16.2 feet from
Bernard Street.
The applicant is requesting a minor modification to reduce the perimeter landscape along
Bernard Street from 20 feet to 16 feet. The ground level units will include patios facing
Bernard Street and the upper levels include balconies. The reduced setback is sufficient
to allow for adequate planting of trees and planting for an attractive streetscape and view
from residential properties to the north. This setback and landscaping will be consistent
with the condominium portion of the project on Bernard Street.
Traffic Analysis
The project site was previously approved for a total of 145 condominium units, of which
32 units have been built. In comparison to the original proposal, application of the most
recent Institute of Transportation Engineers (ITE) Trip Generation (8t Edition) Apartment
trip rates to the currently proposed 113 apartments results in a decrease of 3 trips in the
AM peak hour and a decrease of 4 trips in the PM peak hour, with a total daily decrease
of 23 trips.
The Harbor Boulevard and Bernard Street intersection was examined for potentials of a
new traffic signal in March, 2012. The original traffic analysis was prepared in 2002 that
found the noted intersection would operate at level of service (LOS) C or better with the
project. With the recent study, peak hour counts were collected in March 2012. The study
confirmed the original determination and concluded that the intersection will operate at
LOS C or better and a traffic signal will not be warranted. Based on the recent warrant
results, it was determined by staff that the condition of approval related to the
installation of a traffic signal at Harbor Boulevard and Bernard Street be removed. The
project's share of traffic mitigation fees in the amount of $175,761 were submitted with
the initial phase of the development.
5
Project Phasing
The developer is committed in building this project subsequent to the approval process.
The project site contains three interconnected buildings and a parking structure that is
proposed to be built in one phase.
Noise Impacts - Patios and Balconies
The proposed project includes a variance request to exempt outdoor balconies/patios
from being considered as noise sensitive areas with respect to the City's Noise
Ordinance. The variance request is being made because sound mitigation for exterior
balcony/patio areas has been considered impractical. A variance of this type has been
approved in 2010 for the Mesa Verde Senior Apartments at Harbor Boulevard/E. Mesa
Verde Drive (currently in plan check).
Title 13, Section 13-280(d) and (e), Exterior Noise Standards, of the Costa Mesa
Zoning Code indicates that exterior noise standards shall not apply to "private balconies
or patios regardless of size" of multifamily residential development located within the
Mixed -Use Overlay District and North Costa Mesa Specific Plan area.
The intent of this exemption is to recognize the outdoor noise environment of mixed-use
development with residential uses located adjacent to commercial uses in particular. To
promote mixed-use development and acknowledge the unique nature of these uses,
this exemption would exclude private balconies or patios as being identified as a noise
sensitive area for purposes of noise attenuation.
If the variance is approved, noise mitigation will not be required for private balconies or
patios. If the variance is denied, the applicant will need to submit a noise analysis
identifying the units that will require mitigation measures to reduce the exterior noise
level at the balconies and patios affected by traffic noise on Harbor Boulevard and
Bernard Street (refer to Mitigation Measure NOI-3)
Affordable Housing Requirement
Celeste Brady, special legal counsel, shall be present at the public hearing to answer
any questions regarding the affordable housing obligations.
The project site is located in the City's Downtown Redevelopment area. In compliance
with the inclusionary housing requirements for RDA areas, a total of 12 affordable
housing units were required per State law (seven moderate income units and 5 low/very
low income units). This requirement was memorialized in an agreement with the
Redevelopment Agency (RDA). The City's RDA was abolished on February 1, 2012 as
required by state.
There are a number of different implications to the affordable housing requirement for this
project due to the proposed revisions to the development project and implications of RDA
dissolution. Staff is currently working with the City's special legal counsel and the
applicant on any potential changes to the Affordable Housing Agreement.
Condition No. 45 indicates, in part, that:
The project site is subject to and encumbered by specific inclusionary affordable housing
obligations and covenants that are referenced in that certain Memorandum of Affordable
Housing Agreement ("AHA") recorded in the Official Records, County of Orange, against
the project site ("Covenants"), which Covenants run with the land and require the
developer/owner of the project site to provide either on-site or off-site the required
inclusionary affordable housing units as a condition to development of the project site. As
the developer/owner's current application to the City for a land use entitlement on the
project site proposes a rental housing development, which is different than the previously
approved land use entitlement for an ownership housing development; thus, the
developer/owner cannot satisfy and fulfill the Covenants of record. The AHA and
Covenants provide, in part, that in the event the developer/owner fails to provide the
required affordable housing units on-site as a part of the development of the project site
pursuant to the AHA to the satisfaction of the City's Development Services Director, then
the developer/owner is responsible legally and financially for the entire affordable housing
obligation, which legal obligation was triggered by entitlement and development of
residential units on the project site.
This land use entitlement is conditionally effective and is expressly and intentionally
subject to the developer/owner negotiating and reaching agreement with and entering into
a contract or contracts with the City of Costa Mesa and the Costa Mesa Housing Authority
acting as successor housing agency as to the assets and functions of the dissolved Costa
Mesa Redevelopment Agency ("CMHA"), which contract(s) shall set forth specific
amendments to and modifications of the Covenants and the agreements that established
such Covenants, and/or the provisions under which such Covenants and agreements -
may be terminated and released, including without limitation the AHA and that certain
Settlement Agreement (Plaza Residential Project -1901 Newport Boulevard) entered into
among the developer/owner's predecessor -in -interest to the project site, and the City, and
the dissolved Agency (of which the CMHA is successor -in -interest) (together, "Amended
Covenants").
Justifications for Approval
Staff recommends approval of the requested entitlements for the following reasons:
The Addendum to FEIR complies with State law. The environmental analysis
determined that the proposed amendment would not have any new or
substantially more severe impacts than what was evaluated FEIR 1050. There
are no new mitigation measures that were not adopted at the time the FEIR was
certified that would further reduce. the project impacts. FEIR 1050, when
considered in conjunction with this Addendum, provides adequate
documentation pursuant to the CEQA guidelines. All previous mitigation
measures are included as Exhibit C of the resolution and applicable to the
project.
Proposed amendment to master plan is consistent with land use obiectives of the
City's General Plan. The proposed project is consistent with General Plan Goal
LU -1A.1 in that the project provides for a mix and balance of housing and
employment opportunity. The project site is in close proximity to bus transit and
commercial uses.
The proposed project is consistent with General Plan Goal HOU-3 to provide a
variety of housing types in terms of cost, design, location and tenure. Even
though the project is currently proposed as for -rent units, a recorded tract map
and compliance with the City's condominium standards will allow the units to be
sold as condominiums. Condition No. 6 requires that the development comply
with all requirements of Article 1, Chapter 5, (and Article 2, Chapter V) and Article
9, Chapter 5 of Title 13 of the Costa Mesa Municipal Code relating to development
standards for multi -family residential projects. The development is also ensured to
be of high quality materials and construction as noted by the applicant and
included as condominium standards as Attachment 5.
• Proposed Development is consistent with the Zoninq Code and General Plan.
The proposed 113 -unit development at a maximum 40 du/acre and five -level
parking structure (four -levels above grade) are consistent with the approval of
the original master plan for the project site. The proposed 283 parking spaces
are consistent with the zoning code requirements; however, less than the original
approval. The location of the project would allow use of alternative modes of
transportation that may be attractive to a new population that can take advantage
of these options.
Proiect complies with Zoning Code and intent of Residential Design Guidelines.
The overall architectural design promotes excellence and compatibility. The
buildings are designed with three and four stories with the three-story units along
Bernard Street. As low-rise buildings in a planned development zone, the
proposed units are not subject to the application of the 80 percent second -floor
to first -floor ratio recommended in the City's Residential Design Guidelines;
however the variety of building elevations, materials and staggered massing
diminishes the boxy design appearance from the front and side views. Condition
No. 11 requires that no modification to the building design and height without
approval of the Development Services Director.
Change of the project to a "for -rent" development would still result in a high-
quality development due to construction to condominium specifications. Even
though the project is proposed as for -rent units, the developer is intending a
luxury style apartment living for professionals that prefer an urban location. The
project includes full amenities and will be built to high quality standards as noted
in the condominium standards included as Attachment 4. The approved
tentative tract map will allow the applicant to sell these units in the future without
a conversion process when the current economic conditions change.
Proiect traffic impacts will remain the same and consistent with the original
rp oject. The total number of residential units will remain the same (145 units)
with the latter phase of development. Access to the site will remain from Bernard
Street as originally planned. The project master plan including traffic
improvements will provide for adequate on-site circulation.
• Minor modification for 16 -foot front setback on Bernard Street is compatible with
the neighboring condominiums to the west and allow for adequate landscaping.
The proposed reduced landscape setback is consistent with the first phase of the
project and provide for similar type of landscaping and patio design. This setback
is not facing a major street and does not compromise the livability of the units
�I�
facing Bernard Street. The proposed building wall is more than 16 feet from the
Bernard Street right-of-way and the balconies are extending beyond the building
wall with less than a foot offset for articulation. Fending for the private patios on the
ground level and along Harbor Boulevard frontage will need to meet the zoning
code standards.
The project architecture and site design are complementary to the existing
condominiums (Phase 1) and the surrounding commercial and residential uses
with excellent design, and .generous landscape setback at Harbor Boulevard and
Bernard Street. The buildings are designed with Spanish Colonial elements
complementary to Phase One of the project and the elevations are designed with
articulation to enhance the appearance of the structures from the public rights-of-
way and the neighboring properties.
Shadows from the Pacific Gateway Residences Project would not extend onto
adiacent shade -sensitive land uses. Shadow conditions were analyzed for the
project at 9:00 AM, noon, and 3:00 PM for each of the three days (June 21,
September 23, and December 21) that showed minimal shade/shadow effects
from the proposed project on existing single-family residential homes along
Bernard. Therefore, consistent with the findings of FEIR 1050, shade and shadow
impacts associated with the proposed project are considered less than significant
and no mitigation is required.
The proposed proiect is consistent with the recorded Tract Map and subdivision
requirements. The original tract map provided for condominium ownership of the
residential units. The master plan amendment will not modify subdivision of the
site and allow for future sale of the units if they are built to condominium
standards.
The requested variance for exemption of balconies and patios from City's Noise
Standards provides for better usage of outdoor areas. The tall enclosures confine
the balconies, and patios, limit views and makes them less practical for use of the
residents. Given the mixed use setting of the project applying the mixed use
exemption will be practical and consistent with the previous projects and will not
deter from usability of the private open spaces. Approval of the requested
variance would allow the balcony railing to be consistent on all building elevations
and complementary to the building design. In addition, there have been problems
identified with balcony sound glass:
o Sound glass may create a claustrophobic environment with limited airflow for
some residents which may discourage the use of outdoor balconies on a
regular basis.
o Sound glass may not be practical in achieving noise level reductions as these
measures attenuate noise for seated persons of average height only.
o Sound glass may be difficult to maintain on a regular basis, requiring custom -
fitted replacements if damaged and ongoing cleaning.
The Cities of Irvine and Huntington Beach have indicated that noise mitigation for
exterior balconies is no longer required. Given the fact that the proposal is a
mixed-use development, staff believes the unique type and location of the
proposed mixed-use development justifies approval of the variance request.
Title 13, Section 13-280(d) and (e), Exterior Noise Standards, of the Costa Mesa
Zoning Code indicates that exterior noise standards shall -not apply to "private
balconies or patios regardless of size" of multifamily residential development
located within the Mixed -Use Overlay District and North Costa Mesa Specific Plan
area.
• Project complies with parking requirements. City Council required an additional 40
parking spaces above those required by Code to address parking concerns with
the use of two -car enclosed garages for storage. The revised project does not
include any two -car enclosed garages, and therefore, the proposed project does
not include any surplus parking spaces above Code requirements. Staff does not
believe that additional parking spaces are needed above and beyond those
required by Code.
FISCAL REVIEW
Fiscal review is not required for this item.
LEGAL REVIEW
The City Attorney's office has considered the proposal and determined that a General
Plan amendment is necessary in order for the project to proceed as proposed.
GENERAL PLAN CONFORMITY
The project requires approval of a general plan amendment for residential
development. If approved, the proposal will be in accordance with the General Plan
Medium Density land use designation with maximum density of 12 du/acre (44 units
allowed, 33 units proposed).
ENVIRONMENTAL DETERMINATION
Pursuant to CEQA and the State CEQA Guidelines, an addendum to the FEIR No.
1050 was prepared. No new mitigation measures or environmental impacts were
identified compared to the originally -approved project. Although not required by CEQA,
the Addendum was circulated for public review through the State Clearinghouse .from
March 7 to March 26, 2012.
The document and the received letters are available at the following link:
http://www.ci.costa-mesa.ca. us/docs/planning/environmental-bulletin/Addendum-030612. pdf
Responses to Comments
Only two public letters were received during the public comment period and the
responses are included as Attachment 3.
H
ALTERNATIVES
The City Council:
1. Approve the Addendum to FE/R No. 1050 and amendment to Master Plan PA -02-11.
This would allow the applicant to proceed with construction of the 113 -unit for -rent
housing project with the recommended conditions of approval as discussed in this
report.
2. Deny all discretionary requests. The entitlement for 113 condominium units will
remain in place.
CONCLUSION
The proposed for -rent project is consistent with the height, density, and design and
massing of the original project. Approval of the Master Plan amendment will provide for
development of this site that has been vacant for more than five years with luxury
apartments. The project will be a quality project built with condominium standards that will
be Ja benefit to the community. This location provides housing opportunities to
professionals in. a mixed use setting and in close proximity to commercial, transit and
transportation corridors.
�16-�-- �� - - �A"*
MINOO ASHABI, AIA v K ANH NGUYEN
Senior Planner Interim Developme Services 4irector
Attachments: 1. City Council Resolutions
2. Location Map
3. Addendum to FEIR and Public Comments
4. Submitted plans
5. Submitted Condo standards
cc: Chief Executive Officer
Assistant Chief Executive Officer
.Economic Development Director
Public Services Director
City Attorney
Transportation Svs. Manager
City Engineer
City Clerk (9)
Staff (4)
File (2)
File: CC04172012PA-02-11A I Date: 4/6/12 1 Time: 9:45 AM