HomeMy WebLinkAbout- - Building Inspection Services RFP - 5/15/2012CITY COUNCIL AGENDA REPORT
MEETING DATE: MAY 15, 2012 ITEM NUMBER:
SUBJECT: BUILDING INSPECTION SERVICES REQUEST FOR PROPOSALS
DATE: MAY 8, 2012
FROM: ECONOMIC & DEVELOPMENT SERVICESIBUILDING AND SAFETY DIVISION
PRESENTATION BY: KHANH NGUYEN, BUILDING OFFICIAL
FOR FURTHER INFORMATION CONTACT: KHANH NGUYEN (714) 754-5270
RECOMMENDATION:
Staff recommends that the City Council:
1. Direct staff to reject all proposals;
2. Direct staff to implement a "hybrid model" for building inspection services and
eliminate the two vacant inspector positions;
3. Authorize staff to rescind layoff notices that were distributed to Building Inspection
and Code Enforcement personnel.
The hybrid model involves maintenance of existing high service levels with a
combination of existing employees and contract staff. Under the hybrid model, the
Senior Electrical Inspector and Combination Inspector positions would be eliminated.
BACKGROUND:
To provide quality building inspection services at a reasonable cost, the City Council
authorized releasing the Request for Proposals (RFP) for this service on September 20,
2011. The RFP was released on September 25, 2011 and seven proposals were
submitted to the City on or before the October 20, 2011 deadline. Most proposals
contain an "hourly -cost" pricing and two contain a "percentage -of -fees -collected"
pricing.
The evaluation team reviewed the proposals and ranked them per the pre -defined
scoring criteria on January 10, 2012. The evaluation team invited the top three scoring
vendors for an interview on January 27, 2012.
After further review and completing reference checks, the evaluation committee
unanimously ranked one of those vendors as the top vendor based on qualifications
and pricing. See Attachment 1.
ANALYSIS:
Reorganization of Building Inspection Services
The following table summarizes the existing staffing due to reorganization:
Table A
1
"HISTORIC MODEL"
Previous Staff Levels
Adopted FY 201112012
Chief of Inspection
"NEW HYBRID MODEL"
Current Reorganization
Proposed FY 201212013
1 Chief of Inspection
1
Senior Electrical Inspector
1
Combination Inspector
1
Office Coordinator
1
Office Specialist
1 Office Specialist
1
Contract Inspector*
2 Contract Inspector"
TOTAL: 5 Full-time City Employees
1 Contract Inspector
TOTAL: 2 Full-time City Employees
2 Contract Inspectors
**Consultant from existing contracts with CSG or Bureau Veritas
For Fiscal Year (FY) 2011-2012, the budget for Building Inspection services included
five (5) full-time (FT) positions and one (1) contract inspector. The positions were
comprised of one (1) Chief of Inspection, one (1) Senior Electrical Inspector, one (1)
Combination Inspector, one (1) Office Coordinator, and one (1) Office Specialist.
During the two-month period between July and August 2011, the Combination Inspector
resigned and the Chief of Inspection retired. The workload was filled with contract
inspectors through an existing contract with CSG and Bureau Veritas. In December
2011, those contract inspectors were converted to part-time (PT) employees as a cost
saving measure.
During the same timeframe, the Office Coordinator was promoted to the Planning
Division. The duties and responsibilities for that position were absorbed by other
employees, therefore, the Office Coordinator position was eliminated in the fall of 2011.
Thus, in a span of six months, the Building Inspection section was reorganized from five
(5) FT positions and one (1) contract inspector to two (2) FT positions and two (2)
contract inspectors. The City still has the ability to utilize additional contract inspectors
on an as -needed basis.
Utilizing contract inspectors (or PT employees) provides the City with the ability to
adjust staffing levels based on the fluctuation in the workload, which saves money.
Using key in-house personnel maintains the institutional knowledge that is critical for
delivering consistent services to our large customers such as South Coast Plaza. The
hybrid model allows the City to utilize the advantage of both staffing models.
Staff believes that the new hybrid style staffing model is cost effective and maintains
the high levels of customer service to the community.
Comparison with Other Cities
The following is a summary table identifying the organizational structure, including the
"hybrid model", in surrounding cities.
Table B
INNOVATIVE MERIT:
The implementation of technology (i.e. wireless field units, as approved by the City
Council last summer) provides staff with the tools necessary to be more efficient and
effectively facilitate the reorganization to a hybrid staffing model.
FISCAL REVIEW:
Given that the City received proposals from the vendors and that additional staffing
changes are proposed, staff believes that two sets of analysis are best.
First, the City issued the request for a proposal consistent with previous staffing levels.
As seen on Attachment 2, it appears that the vendor proposal was higher by
approximately $73,000. However, analysis provided based on the total productive or
service hours shows that the vendor might provide a greater amount of service for this
cost. Therefore, to gain consistency in analysis, staff reduced the vendor proposal to a
like number of productive hours that would be provided by City staff. This analysis shows
the vendor pricing is still higher by approximately $4,100 as seen in the chart below.
A comparison of the vendor pricing (as provided in the proposal) to that of fully burdened
top step City staff (at 1,800 productive hours), shows the vendor's pricing is about $7 per
Dour higher than the cost of City staff.
Second, City management staff is proposing a change in staffing levels for the Building
Division. Unfortunately the City has not issued an RFP at these revised staffing levels.
Therefore, staff used the vendor rates provided with the original RFP to compare possible
costs. As seen on Attachment 3 and below, when vendor pricing is adjusted for
productive time it is $11,300 higher than the proposed hybrid model.
Newport Beach
All City Em to ees, except 9 contractor
Huntington Beach
All City Employees
Santa Ana
All City Ern to ees
Fountain Valley
All Contractors
Irvine
Hybrid: Both City & Contract Employees
Tustin
Hybrid: Both City & Contract Employees
INNOVATIVE MERIT:
The implementation of technology (i.e. wireless field units, as approved by the City
Council last summer) provides staff with the tools necessary to be more efficient and
effectively facilitate the reorganization to a hybrid staffing model.
FISCAL REVIEW:
Given that the City received proposals from the vendors and that additional staffing
changes are proposed, staff believes that two sets of analysis are best.
First, the City issued the request for a proposal consistent with previous staffing levels.
As seen on Attachment 2, it appears that the vendor proposal was higher by
approximately $73,000. However, analysis provided based on the total productive or
service hours shows that the vendor might provide a greater amount of service for this
cost. Therefore, to gain consistency in analysis, staff reduced the vendor proposal to a
like number of productive hours that would be provided by City staff. This analysis shows
the vendor pricing is still higher by approximately $4,100 as seen in the chart below.
A comparison of the vendor pricing (as provided in the proposal) to that of fully burdened
top step City staff (at 1,800 productive hours), shows the vendor's pricing is about $7 per
Dour higher than the cost of City staff.
Second, City management staff is proposing a change in staffing levels for the Building
Division. Unfortunately the City has not issued an RFP at these revised staffing levels.
Therefore, staff used the vendor rates provided with the original RFP to compare possible
costs. As seen on Attachment 3 and below, when vendor pricing is adjusted for
productive time it is $11,300 higher than the proposed hybrid model.
City Cost Vendor Proposed Difference
Current Staffing Model $ 654,366 $ 658,500 $ 4,134
Hybrid Staffing Model $ 439,586 $ 459,900 $ 11,314
1 — Proposed pricing adjusted for comparable productive/service hours.
2 — Amount calculated based on original proposed rates, vendor was not asked to
provide proposal for hybrid staffing model.
Based on the analysis, comparing the current staffing level costs for FY 12113 {$654,366}
to the proposed hybrid model ($439,586), the City could reduce costs by $2J4,780.
LEGAL REVIEW:
No legal review is required at this time.
CONCLUSION:
The use of key City staff supplemented by contracts for required Building Inspection
services is cost effective while maintaining a high level of service to the community.
KHANH NGUYEN
Building Official
PEM;CNACHW
Deputy Chief Executive Officer
i
am.
0T�`
o.l ` i -
DISTRIBUTION: Chief Executive Officer
Assistant Chief Executive Officer
Public Services Director
City Attorney
City Clerk (9)
Staff (4)
File (2)
ATTACHMENTS: 1 Building Inspection RFP Determination Book
2 Current Budget Compared to Vendor Proposal
3 Hybrid Model Compared to Vendor Proposal