Loading...
HomeMy WebLinkAbout- - East Side St Improvement ProjectNo.12-05 - 6/5/2012CITY COUNCIL AGENDA REPORT MEETING DATE: JUNE 5, 2012 ITEM NUMBER: SUBJECT: EAST SIDE STREET IMPROVEMENT PROJECT, CITY PROJECT NO.12-05 DATE: MAY 24, 2012 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, INTERIM CITY ENGINEER, (714) 754- 5335 RECOMMENDATION: 1. Adopt plans, specifications, and working details for the East Side Street Improvement Project, City Project No. 12-05. 2. Award a construction contract to All American Asphalt, Post Office Box 2229, Corona, California, 92878-2229 in the amount of $3,557,557.00. 3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: The East Side Maintenance Project consists of the following three individual projects with a total construction cost of over $6.3 million. 1. Parkway and Concrete Repair Project — Will repair the damaged curb and gutter, sidewalk, cross -gutters and driveways. 2. Asphalt Concrete Paving Project — Will mill and overlay major streets (such as Orange Avenue, Tustin Avenue, and Santa Ana Avenue). In addition, the contractor will be placing a thin overlay on streets with minor surface distress. 3. Slurry Seal Project — Will apply a thin surface coating to extend the life of the wearing surface and to seal the street. By phasing the work into areas of specialty, the City was able to realize an overall savings of $600,000 from last years contract prices. The renewed Measure M (M2) funding program requires that cities in Orange County maintain a uniform approach to rating and evaluating streets and use a standardized Pavement Management Program. Based on the pavement analysis recommendations and field review, staff prepared a prioritization list and recommendation of streets to be repaired, which were included in the scope of work for the East Side Street Improvement Project. The streets proposed for maintenance under the East Side Street Improvement Project are within the target area bounded by Irvine Avenue and Newport Boulevard, and 15th Street and 21st Street. In addition, the west side of American Street will be part of this project. A listing of the streets is included on Attachment "1 ". ANALYSIS: The pavement maintenance portion of work for this project consists of the localized reconstruction of failed sections of the existing roadway; milling the existing pavement and placing an overlay of asphalt concrete; and traffic control. The contractor is required to complete all of the tasks necessary to perform the work as outlined in the contract documents. The City Clerk received and opened four (4) bids for this project on April 18, 2012. All American Asphalt was the apparent low bidder with a base bid proposal of $3,557,557.00. The Engineer's estimate for this work was $3,868,800.00. An analysis of the bids indicates that the apparent low bidder submitted a proposal that is eight percent (8%) lower than the Engineer's estimate. The variance between the low bidder and the Engineer's estimate may be attributed to continued competitive conditions in the construction industry at this time. The Bid Abstract is included as Attachment "2". The license and references of All American Asphalt were checked and staff has found them to be in good standing. All American Asphalt has successfully completed many projects in the City of Costa Mesa including most recently the rehabilitation of Sunflower Avenue (from Avenue of the Arts to Anton Boulevard), Vanguard Way, Wilson Street (between Newport Boulevard and Fairview Road), and the 2010-2011 Citywide Street Rehabilitation Project, which focused on similar repairs in other areas of the City. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. If all the bids were rejected, the City would need to readvertise or cancel the project. Staff believes that readvertising the project will not result in lower bids and canceling the project is not recommended because the streets are in need of the proposed street maintenance work. FISCAL REVIEW: This project will be fully funded from available Gas Tax funds. LEGAL REVIEW: All American Asphalt has furnished the necessary bonds and insurance, which have been approved as to form by the City Attorney's office. After the award and subsequent execution of the contract, a "Notice to Proceed" will be issued. CONCLUSION: The City has received bids for the East Side Street Improvement Project, City Project No. 12-05. Staff has evaluated all of the bids and recommends that the City Council adopt the plans, specifications, and working details for said project; award the contract to the apparent low bidder All American Asphalt, in the amount of $3,557,557,00; and authorize the Mayor and the City Clerk to execute the Public Works Agreement. ERNESTOttUNOZ Public Services Director I �AwL FARIBA FAZELI Interim City Engineer 2 ATTACHMENTS: "1" Listing of Streets "2" Bid Abstract DISTRIBUTION: Chief Executive Officer City Attorney City Clerk Staff File CITY OF COSTA MESA ATTACHMENT -I PUBLIC SERVICES DEPARTMENT EAST SIDE STREET IMPROVEMENT PROJECT CITY PROJECT NO. 12-05 LIST OF STREETS Name From To 16th PI Santa Ana Ave Tustin Ave 16th PI Orange Ave Santa Ana Ave 16th PI Tustin Ave Irvine Ave 16th St Newport Blvd Orange Ave 16th St Orange Ave Santa Ana Ave 16th St Santa Ana Ave Tustin Ave 16th St Tustin Ave Irvine Ave 17th St Newport Blvd 200' w/o Fullerton Ave Old 17th St Newport Blvd "V -Right (w/o Bullnose)" 18th St Orange Ave Tustin Ave 18th St Tustin Ave Irvine Ave 19th St Newport Blvd Fullerton Ave 20th St Newport Blvd Frontage Road Santa Ana Ave 20th St Santa Ana Ave Irvine Ave 21 st St Santa Ana Ave Tustin Ave Abbie Way W'ly Cul-de-sac Irvine Ave Aliso Ave 16th St Cambridge Cir Aliso Ave Walnut PI Esther St Aliso Ave 20th St Cul-de-sac Alva Ln Santa Ana Ave Raymond Ave American Ave Victoria St State Ave Bay St _ Tustin Ave Aliso Ave Bay St NB Newport Blvd Frontage Road Orange Ave Bay St Westminster Ave Santa Ana Ave Brentwood PI Cul-de-sac Brentwood St Brentwood St Norse St Santa Ana Ave Broadway Newport Blvd Orange Ave Broadway Orange Ave Santa Ana Ave Broadway Santa Ana Ave Tustin Ave Broadway Tustin Ave Irvine Ave Cabrillo St Newport Blvd Orange Ave Cabrillo St Orange Ave Santa Ana Ave Cabrillo St Santa Ana Ave Raymond Ave Cambridge Cir My Cul-de-sac Ely Cul-de-sac Costa Mesa St Fullerton Ave Santa Ana Ave Costa Mesa St Santa Ana Ave Irvine Ave Esther St Walnut PI Tustin Ave Esther St Santa Ana Ave Raymond Ave Esther St Raymond Ave Tustin Ave Esther St My end Irvine Ave Flower St Fullerton Ave Santa Ana Ave Flower St Santa Ana Ave Irvine Ave Fullerton Ave 17th St Cabrillo St Fullerton Ave 18th St 19th St Fullerton Ave 20th St E. Bay St Fullerton Ave E. Bay St Bouy St Fullerton Ave 19th St 20th St Knox PI Orange Ave Santa Ana Ave Page 1 CITY OF COSTA MESA PUBLIC SERVICES DEPARTMENT EAST SIDE STREET IMPROVEMENT PROJECT CITY PROJECT NO. 12-05 LIST OF STREETS Name From To Knox St Orange Ave Santa Ana Ave La Perle Ln/PI Tustin Ave (Southern) Tustin Ave (Northern) Laurie Ln Cul-de-sac Bay St Lenwood Cir Aliso Ave Cul-de-sac Lenwood Dr Tustin Ave Aliso Dr Magnolia St Fullerton Ave Santa Ana Ave Magnolia St Santa Ana Ave Irvine Ave Marian Way Cul-de-sac 21st St Ogle Cir Cul-de-sac Aliso Ave Ogle St Orange Ave Santa Ana Ave Ogle St Santa Ana Ave Tustin Ave Orange Ave 15th St 16th St Orange Ave 16th St 17th St Orange Ave 18th St Broadway Palmer St Orange Ave Santa Ana Ave Paloma Dr 20th St 660' N'ly Ramona PI Santa Ana Ave Cul-de-sac Ramona Way Cul-de-sac Tustin Ave Raymond Ave 17th St My end Raymond Ave Magnolia St 19th St Raymond Ave 19th St 20th St Redlands PI Cul-de-sac 16th St Riverside PI Cul-de-sac 16th St Robin Hood PI Cul-de-sac Westminster Ave Robin Hood Ln Westminster Ave Santa Ana Ave Robin Hood Ln Santa Ana Ave Cul-de-sac Rochester St Westminster Ave Cul-de-sac Rochester St Santa Ana Ave Tustin Ave Rosemary PI Cul-de-sac 20th St San Bernardino PI Cul-de-sac 16th St Santa Ana Ave 15th St 16th St Santa Ana Ave 16th St 17th St Santiago Rd Velasco Ln Sonora Rd Sherwood PI Cul-de-sac Westminster Ave Sherwood St Westminster Ave Santa Ana Ave Sierks St Orange Ave Santa Ana Ave Sonora Rd La Salle Ave Velasco Ln Tustin Ave 17th St 18th St Tustin Ave 18th St 19th St Tustin Ave 19th St 20th St Tustin Ave 20th St Emerson St Walnut PI Tustin Ave Esther PI Walnut PI Irvine Ave Aliso Ave Walnut St Santa Ana Ave Tustin Ave Westminster Ave 15th St Knox PI Westminster Ave 16th St Alley #53 Westminster Ave 17th St 19th St Westminster Ave Costa Mesa St Walnut St Westminster Ave Walnut St 20th St Westminster Ave Sierks St 21st St Page 2 ATTACHMENT 2 CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES EAST SIDE STREET IMPROVEMENT PROJECT CITY PROJECT NO. 12-05 BID OPENING DATE: APRIL 18, 2012 BID OPENING RESULTS Bidder city Total Bid 1. ALL AMERICAN ASPHALT CORONA $3,557,557.00 2. R.J. NOBLE COMPANY ORANGE $3,577,710.00 3. PALP, INC. DBA EXCEL PAVING COMPANY LONG BEACH $3,958,986.00 4. CALMEX ENGINEERING. INC. BLOOMINGTON $4.030.312.46 Average $ 3,781,141.37 Engineer's Estimate: $ 3,868,800.00