HomeMy WebLinkAbout- - Building RFP CSG 2 Attachment 4 - 6/19/2012'
OL
`
GOW AN
.M ,.
jr
law
r � yam,.. •
J
w
{r.�i~.
sLow,''!
PROPOSAL TO THE
City of Costa Mesa
Building Plan Check and
Inspection Service
PREPARED BY
CSG Consultants, Inco
May 3, 2012
801 Park Center Drive j Suite 730 1 Santa Ana, CA 92705
Phare (714) 568-1010 1 Fax (714) 568-1028 I www.csgwebsite.com
San Mateo a Santa Area a Salinas . Sacramento e Pleasanton
N12
Table of Contents
Letter of Introduction
> Company Overview.......................................................... 1
Firm Summa
Insurance Coverage. .... ........................... . .. . .......................... 2
KeyBenefits............................... .............. ---- .............. ....... 3
Scope of Work . .................................. ........ 4
` Building Pian Review Services ........................... . . . ........................... 4
_ Building Inspection Services........................................................... a
Grading/Improvement Plan Review and Inspections ................ ................. 8
FY Fire Department Plan Review and Inspections of Fire Protection Systems ........... 13
Permit Processing/Front Counter Support ............................................ 15
Code Enforcement. . ............................. 16
1�•�;
Staffing Qualifications ........... - - - - - - - - .. - - - - - . —17
17
Technical Capabilities and General Experience ...................................... 17
Project Management and Team Interaction .......................................... 18
n Relevant Project Experience & References ....................... 19
References.. .............. ................................ .......... 21
ProposedRates ......................................... ......... • .... 22
Additional Information.....................................................23
Professional Resumes ............................................ . . ....... 24
13�)
Letter of Introduction
May 3, 2012
City of Costa Mesa
Building Safety
Attn: Keith Clarke — Building Official
77 Fair Drive
Costa Mesa, CA 92626
Re: Proposal to Provide Building Plan Check and Inspection Services
Thank you for allowing CSG Consultants the opportunity to present this proposal. Our proposed staff will
be utilized in response to the scope of services as requested. All proposed CSG staff are fully registered,
ICC certified, with additional qualifications including LEER, DSA, and CASp experience and certification.
We offer an exceptional team for Fire Prevention services with a broad background in plan review and
inspection needs for jurisdictions as well as qualified grading improvement plan review and inspection
personnel.
�We currently furnish as -needed services to the City of Costa Mesa and are thoroughly familiar with the
needs and requirements of the jurisdiction. We can easily be available for meetings at the City hall when
requested and can provide Accelerated Building Plan Review services when needed.
Since 1991, CSG Consultants has been providing building and life safety services to jurisdictions
throughout the state. We currently furnish Building and Safety Services to over 70 clients; including
many neighboring communities. I will personally oversee all services to be provided.
Our local (principal) office and contact information is as follows:
Khoa Duong, P.E. I Vice President Building & Fire Life Safety
801 Park Center Drive Suite 230 1 Santa Ana, CA 92705
(714) 568-1010 Phone (714) 872-6123 Cell
khoa@csgengr.com
Please feel free to contact myself or Mr. Cyrus Kianpour, President, with any questions or comments you
may have regarding our proposal.
Sincerely,
0 Khoa Duong, P.E.
J Vice President, Building & Fire Life Safety
801 Park Center Drive 1 5uite 230 1 Santa Ana, CA 92705
phone (714) 568-1010 1 fax (714) 568-1028 1 www.csgwebsite.com
Company Overview
Firm Summary
CSG Consultants, Inc. {CSG} is a California company with our Santa Ana office within convenient travel to
City offices. Additional support is available from our other offices in Salinas, San Mateo, Pleasanton, and
Sacramento. Founded in 1991, we provide a wide range of municipal services to community
development and public works departments, including fire protection plan review and inspection. The
majority of the 140+ individuals within our firm have provided public agency services throughout their
entire career. Our talented personnel bring a wealth of ideas and experiences having held similar
positions with Communities dealing with the same development issues as the City of Costa Mesa.
Our staff consists of building officials, pian reviewers, inspectors, and specialized planning, grading
p° improvement plan reviewers and inspectors, Fire department plan reviewers and inspectors,
information technology, program and project managers, engineers, construction managers, and
sustainability professionals. Depending upon the needs of our clients, we Can serve in either a project
specific or on-call staff augmentation capacity. The following represents a brief summary of our firm:
NAME OF FIRM: CSG Consultants, Inc.
PROJECT MANAGER: Khoa Duong, P.E. I Vice President, Building & Fire Life Safety
LOCAL OFFICE: 801 Park Center Drive I Suite 230
Santa Ana, CA 92705
(714) 568-1010 Phone 1 (714) 872-6123 Cell
khoa@csgengr.cam
CORPORATE OFFtCE: 1700 South Amphlett Boulevard 13rd Floor
San Mateo, CA 94402
(650) 522-2500 phone
(650) 522-2599 fax
www.csgwebsite.com
WLL info@csgengr.com
SATELLITE OFFICES: 1257 Quarry Lane ! Pleasanton, CA 94566
21 West Alisal Street I Suite 1.08 1 Salinas, CA 93901
225 Eighth Street II Suite 425 1 Sacramento, CA 95814
~, YEARS IN BUSINESS., 21
ORGANVATION: Richard Mao I Founder
Cyrus Kianpour I President
NUMBER OF EMPLOYEES: 140+
r
TYPE OF BUSINESS: Corporation I Federal ID No.: 91-2053749
235
Our services and project experience includes the following areas of expertise:
h
Building 1 Fre & L& Safety
Plan Review
f
Building Inspection
Municipal Code Enforcement
Building Department Management
'
Electronic Plan Check
Structural Engineering Services
Fire Life Safety
ADA Compliance
CASA
Environmental & Sustainable Programs
Constru fiction Management
.5 Program and Project Management
Contract Administration
Caltrans RE Services
Inspection I Oversight
Constructability and Bid Reviews
` Scheduling and Claims Management
Project Estimating
Insurance Coverage
Em
Engineering 1 Public Works
Development Review
Staff Augmentation / Municipal Services
Design & Preparation of PS&E
Pavement Management (MTC Certified)
Preparing & Monitoring Federal, State, and Local Grant
Applications and Reimbursements
Land Surveying & Mapping
Civil Plan & Map Review
GIS/Document Management
Planning f Economic Development
Land Use Policy
Zoning Regulations
Design Review
Historic Preservation
Contract Planning
CEQA Compliance
Information Technology
Digital Plan Review
GIS
Scanning
Permitting Software
CSG is a fully insured company. In addition to the required State Worker's Compensation Insurance, CSG
has a comprehensive automobile policy in the amount of one million dollars ($1,000,000); coverage in
the amounts of two million dollars ($2,000,000) for general liability; and one million dollars ($1,000,000)
for professional errors and omissions. CSG will guarantees insurance for professional errors and
omissions will be maintained throughout the term of the contract and for three years following contract
termination. A certificate of insurance naming the City as insured will be issued upon award of contract.
Coverage Limits of Liability
WORKERS COMPENSATION
COMMERCIAL GENERAL LIABILITY:
AUTOMOBILE LIABafTY:
PROFESSIONAL LIABILITY:
(Errors and Omissions)
Statutory
$1,000,000 each occurrence
$2,000,000 aggregate
Personal Injury:
$1,000,000 each occurrence
$2,000,000 aggregate
Bodily Injury:
$500,000 per person
$1,000,000 per accident
Property Damage:
$100,000 per occurrence
$1,000,000 per claim
VW
Key Benefits
CSG employs a team of professionally licensed plan review engineers, certified building officials, plan
reviewers, inspectors and permit technicians to manage building department operations, support front
counter procedures, review all plans, and inspect structures for code conformance. Our longtime
experience in furnishing comprehensive building and fire life safety services to jurisdictions provides a
consistent, strong technical foundation to all projects—from cutting edge digital plan review to
providing faster -than -scheduled turnaround times and assisting in last minute inspection requests, CSG
will deliver quality services to the City of Costa Mesa.
CSG proposes the following key objectives:
► Accomplished customer service. We clearly understand the importance of our role in the success
'} of your City and commit to providing your citizens and business partners—residents, architects,
engineers, developers, contractors—as well as your City staff with the highest level service_
► Concentrated focus an wast -savings approach and methods. Because we proudly serve many
municipalities and agencies, we are constantly improving and adapting our services to save you
and your City precious dollars. We share a wealth of recommendations from our varied
experience with other communities and clients to help keep your budget healthy and on track.
■ Customized, responsive services. We are skilled at assessing time commitments, developing an
accurate work plan and applying dedicated, professional personnel. We can quickly fine-tune
staff or staffing levels to match or adjust to changes in plan review, inspection and front counter
activity always maintaining the highest level of customer service_ We hand pick staff uniquely
qualified and experienced to deliver the exact services requested.
► Fully committed and qualified personnel Each member of our staff are fully licensed and
certified at the highest level of industry standards. To keep our personnel on the industry's
cutting edge, many serve as popular educational instructors and lecturers as well as sit on
leading boards and committees far organizations developing and implementing important code
regulations. We also keep up with latest in procedures and use of products, i.e. green building,
ADA accessibility, CASA certification requirements, and more.
► Swift turnarounds and expedited services. With longtime experience in the digital plan review
process, our staff excels at the speediest turnarounds in the industry. We easily match and more
often beat any required timing and make available our scanned plan review documents free to
our clients. We maintain a long list of available, qualified candidates for plan review, inspection
and front counter support and can quickly respond to multi-level needs.
► Leading-edge technology with cost-saving solutions. CSG delivers a suite of digital options for
jurisdictions—speedy digital plan reviews including electronic versions of plan comments as well
J as a final set of scanned plans; an opti❑nal, easy-to-use online web application/portal for
y submittal, tracking and approval of digital plans; and, full scanning and archival services.
L�1
3
Scope of Work
Building Plan Review Services
CSG's professional engineers and plans examiners have all of the necessary licensing and certifications
to provide building plan check services. With regard to CSG's conflict of interest
policy, we have made the conscious decision to contract solely with public agencies
and do not provide private design services on any projects within the City of Costa
Mesa, thus eliminating any concern regarding conflict of interest. CSG acts at all
times as agents of the agencies we serve, providing responsive customer service to
all clientele. CSG is committed to putting the interests and needs of the City first
and foremost.
Compliance Standards
Our team of professionals is ready to assist in all aspects of plan review and focus on the special needs
and requirements of each of our clients_ We promise prompt turnaround times and offer comprehensive
online status reports. Our plan checkers carefully review all documents for compliance with building
codes, fire codes, energy conservation standards, State accessibility regulations, and all local ordinances.
We understand and will comply with the City's requirements for plan review services. Our engineers and
plan reviewers review plans for compliance with all policy and model codes adopted by the State,
including but not limited to:
► 2010 California Building Code, Volumes 1 and 2 as adopted by the State of California
► 2010 California Residential Cade
► 2010 California Electrical Code as adapted by the State of California
► 2010 California Plumbing Cade as adopted by the State of California
► 2010 California Mechanical Code as adopted by the State of California
► 2010 California Fire Cade as jointly published by the Western Fire Chiefs Association and the
National Fire Protection Association (NFPA) as amended and adopted by the State of California
(Title -24, Part 9 California Fire Code)
► National Fire Codes as published by the National Fire Protection Association (NFPA); as adopted
and referenced by the State of California (California Code of Regulations, Title -19, Section 1.09)
► 2010 State Historical Building Code
► 2008 /2010 California Energy Cade
► 2010 California Green Building Code
► NPDES/WQMP/SWPPP Compliance
► City adapted ordinances and amendments relative to building and municipal codes, including
project Conditions of Approval from other City departments, divisions, regulating agencies, and
jurisdictions
Plan Check Comments
All plan check comments will be formatted to the City's established correction list templates. Any
additional forms established by the City for alternative methods of construction and/or deviations from
requirements, such as disabled access, will be incorporated into the correction comments and returned
completed with the appropriate recommendations. In addition, Internet access is available for
transferring plan check comments. This will enable City staff to immediately modify our checklist for
incorporation with other department comments.
23g
OSHPD3 Reviews
Our staff of professional engineers, architects, and certified plans examiners is experienced with and
have successfully Completed many OSHPD3 plan reviews for multiple client agencies.
Green Building and LEED Certifications
CSG Consultants has all the qualifications necessary to assist the City in both the
development of policy and the implementation of green and sustainable building
practices. The Environmental and Sustainable Program division of CSG can assist on
demolition and recycling as well as public outreach involved in the building industry.
We have Certified Green Building Professionals (CGBP) and LEED accredited
personnel on staff. Building Division staff is experienced in plan review and
inspection for compliance with CalGreen and local green building ordinances.
m Third Party Plan Review
If requested by the City, CSG will provide third -party plan reviews. The applicant can provide payment
directly to CSG for plan review fees incurred by C5G. We will be responsible for the collection of any of
third -party fees.
CASp Services
We understand California Building Departments are required to have a CASA certified person in place
and available for technical questions and interpretations. Our CASA certified staff are knowledgeable of
state and federal accessibility laws and regulations and possesses the expertise necessary to promote
access to facilities for persons with disabilities. In accordance with newly -formed rules and regulations
we can supply a CASA certified professional to review all plans for accessibility and will comply with
regulations to provide a sufficient number of building department staff who are CASP certified by
January 1, 2014.
Office Hours And Meeting Availability
CSG staff is available for applicant inquiries or conferences anytime during regular business hours
without charge via telephone; 8:00 AM to 5.00 PM, Monday through Friday. We can easily alter our
hours to meet the City's needs. Evenings and weekends for special events and meetings can be
accommodated with 24 hours notice. For your convenience, we can also meet with City staff, architects
and applicants. We recognize the value of pre -design consultation with prospective applicants and are
available to provide this service as well. Our Project Manager will be available in person for consultation
and meetings with a reasonable lead time.
�i Response to City Questions or Requests
CSG staff can typically respond to the City for all questions or requests generated during field inspection
on any plan review during the same day, but no longer than the following day a request is received.
Plans Pickup and Delivery
We coordinate the pickup and return of all pians to via CSG staff or a licensed courier service. This
service is provided at no additional cost.
Online Plan Check Status
CSG offers a convenient service allowing clients to check plan review status and comments online. By
logging an to our website, clicking on Plan Check Status, and entering a password, staff as well as
authorized applicants, can view each project document and communicate with the plan checker via e-
mail or post -a -nate. With a password, staff or authorized applicants can download comments from the
web upon completion of the plan review. There is no additional cost for this service.
Plan Review Timelines and Availability
We work hard to provide the best quality, and mast timely service in the industry. We pride ourselves in
maintaining our requested plan review turnaround times—even delivering faster than our awn
deadlines—for our clients. Our goal is to approve code -complying projects and to successfully and
quickly move work through jurisdiction processes. Our typical turnaround is as follows:
IN MAL REVIEW RE -CHECK
Residential New Construction 10 5
Residential Additions 10 3
Small Residential Remodel / Tenant improvements 10 3
Commercial New Construction 10 5
Commercial Additions 10 5
Small Commercial Remodels /Tenant Improvements 10 5
Large/Complex Commercial Projects 10 5
If a review is anticipated to take longer than the maximum turnaround timing, we will notify the City
representative for negotiation as to additional time required to ensure an appropriate level of review.
Accelerated Plan Check
CSG completes initial accelerated plan check in fewer than 5 working days. Rechecks are completed in
less time. At your request, we can perform plan Check services within an accelerated time frame;
negotiated on behalf of the applicant, the City, and CSG. The fee is also negotiated on behalf of the
applicant, the City, and CSG.
)digital Plan Review
CSG began the transition to digital plan review over 6 years ago, leading the consultant field with this
ground -breaking service. All paper plans submitted to CSG are immediately scanned into digital files and
Stored on our servers for speedy access to both our clients and our plan reviewers. Plan reviews are
performed with no disruption to the workflow using a dual monitor system. Our plan reviewers furnish
electronic versions of their plan comments conforming to each client's formatted templates. A
significant benefit to this process is clients are presented upon final approval, a set of digitally scanned
plans at no cost—thus saving valuable jurisdiction dollars and providing "green" and paperless,
convenient storage of all construction -related documents_
For several jurisdictions requesting a pure digital plan review workflow, we have developed an online
web application for an applicant to submit their digital files directly to us; including an online portal for
the applicant/jurisdiction to retrieve their comments and submitted digital files with redlines. This
-� online portal tracks all submittals, including re -submittals until the plans have been approved. Projects
submitted digitally are processed through an easy-to-use web portal which can be customized to suit
the needs of a jurisdiction.
2� 0
Quality Control / Quality Assurance
CSG's in-house quality assurance / quality control program utilizes a peer review process with multi-level
internal pian checking and project management. A Senior Plan Check Engineer directly associated with
the project is supported by technical staff in the review process to ensure consistency between
observations and field data. The Project Manager (not directly involved with the project) will review the
preliminary report to ensure compliance with our internal quality control standards. CSG currently
works in the City of Costa Mesa and is familiar with the city's needs and procedures.
L�1
Building Inspection Services
° CSG's ICC certified inspection staff possesses the necessary building industry experience to provide on-
call building inspection services. The following is our summary of qualifications to provide the requested
services.
Selection and Standards
CSG selects qualified, certified candidates for inspection services for review and
approval. We offer fully integrated, multi -disciplined building and fire inspection
services for residential, commercial, and industrial projects, and are experienced
in all construction types. In addition, we utilize combination inspection personnel
ft whenever possible to perform over-the-counter plan reviews or assist as customer
service back-up at the front counter in addition to regular inspection duties to
save jurisdictions valuable time and expenses. Our inspection staff easily
integrates into client organizations, consistently implementing policies and
procedures and remaining transparent to applicants and customers.
Our Project Manager will consult with the designated official on all discretionary decisions and/or
materials or types of construction, as well as ensuring all relevant regulatory agencies have approved
the project.
For purposes of consistent application and public relations, our inspectors research the policies and
special code interpretations. All inspections ensure compliance with current local and State building
codes and ordinances.
Continuing Certification and Training
We take pride in working with inspectors motivated to achieve the highest level of experience and
certification. We work hard to match your jurisdiction's level of safety and code compliance and
understand that personality and customer service is crucial to on-the-job success.
All CSG inspectors are ICC certified and are routinely updated through specialized training classes and
seminar attendance in approved and modern methods, materials, tools and safety used in building
inspection, as well as the most current building standards.
d Inspection Schedule
Our building and/or special project related inspection services are provided as -needed and can be scaled
down or ramped up to fit any schedule preferable to the City. Personnel will be available for duty during
the City's regular business hours Monday to Friday, from 8 a.m. to 5 p.m.; however we can also easily
alter our hours to fit any specific need the City might anticipate. Emergency inspections (usually
requests that pertain to a serious or urgent life/safety issue) can be provided as they are needed; nights,
weekends and holidays. All staff is familiar with a multitude of jurisdictional scheduling and tracking
systems and can quickly adapt to City requirements.
Inspection Notification Time
;i CSG will provide inspection staff in a timely manner. Notification time required to provide inspection
staff is typically 24 hours.
Tools and Equipment
CSG provides all vehicles, fuel, maintenance and other equipment necessary for inspectors to carry out
their duties.
CASA Inspection Services
CSG will provide a CASp certified person for inspection and technical questions and interpretations on
an as needed basis. CSG's CASA certified staff are available to provide on-site inspections of existing and
new facilities to assist jurisdictions on interpreting and applying state and federal accessibility standards.
Effective July 1, 2010, California building departments are required to have a CASA certified specialist in
place and available for accessibility questions. Additionally, the law requires that
by 2014, building departments employ CASA certified staff to review plans and
perform inspections in compliance with Senate Bill 1608 and the Americans with
Disabilities Act (ADA). California Senate Bill 1608 sets up a process and establishes
procedures for accessibility specialists (CASA) who are authorized by the State of
California to inspect properties for accessibility compliance. The Bill adds several
provisions to existing laws regarding construction -related disability access issues.
Its primary goal is to protect the disabled public and businesses alike. Further, 513
1608 provides an opportunity for businesses to get information about accessibility from inspectors
certified by the State of California.
CSG's CASA Program assists public agencies by providing accessibility compliance services by certified
specialists. Our CASp specialists are certified by the State as experts in disability access laws. Our CASp
specialists will conduct inspections and make recommendations on improving accessibility. Upon
passing a CASp inspection, CSG will recommend the issuance of a Disability Access Inspection Certificate.
These certificates are sequential and are issued by the Division of the State Architect.
Third Party Inspections
if requested by the City, CSG will provide third -party inspections. The applicant can provide payment
directly to CSG for inspection costs incurred by CSG. We will be responsible for the collection of any of
third -party fees.
Gradinglimprovement Plan Review and Inspections
The scope of work will include review of grading and drainage plans, improvement pians, construction
and post -construction best management practices, final and parcel maps, and other plans as required.
Review of tentative maps and engineering support through the entitlement process can also be
provided on an as -needed basis.
Additionally, site inspections for compliance with approved improvement plans and for compliance with
erosion control measures will be provided by our qualified staff.
In addition to review of plans and maps according the list above, CSG has the necessary equipment and
staff to provide topographic surveys for City -owned properties and roadways, and can also prepare
parcel or final maps on the City's behalf.
CSG's construction management services include project oversight, contract administration and
direction during construction, review of submittals, coordination and processing of Requests for
Information (RFIs), review and assistance in negotiating change orders, maintenance of project
schedules, field inspections and review of monthly progress payments to the contractor. Our inspectors
are experienced in all types of public works and development projects such as: water and sewer systems
4
r�
CSG can readily provide plan or map check services for the following major project types"
+�
►
Major and Minor Residential Subdivisions
►
Parks & Recreational Areas
►
Commercial Projects
►
Roadway Projects (New and Resurfacing)
-°
►
Multi -Use Projects
►
Utility Projects
►
Single -Family Homes
►
ADA Compliance Projects
Our experienced staff regularly reviews the following types of plans, maps, and studies:
1
Rough and Precise Grading Plans
►
Construction Details
Hydrology/Hydraulic Studies
►
Traffic Signal Plans
►
Utility Plans & Profiles (Storm Drain, Sanitary
►
Demolition Plans
.
Sewer, Water, Electric, Gas)
►
Construction Cost Estimates
_
►
Sewer Capacity Analyses
(Engineer's Estimates/Probable Costs)
►
Subdivision improvement Plans
►
Review of Tentative Maps and Preparation
z
(Roadways, tots, Lighting, Joint Trench)
of Conditions of Approval
�..
►
Roadway Plans and Profiles
►
Final Maps & Parcel Maps
(including Signage and Striping)
►
Plats and Legal Descriptions far Lot tine
►
Sediment and Erosion Control Plans
Adjustments, tot Mergers, and Easement or
►
Stormwater Pollution Prevention Plans
Right -of -Way Dedications/Abandonment
(SWPPPs)
.
Our staff is trained and experienced in the following:
►
NPDES Compliance, Specialized in
►
State General Construction Permit
.
Provision C.3 Compliance
(QSD's/QSP's on staff]
►
Hydromanagement (HM)
►
Caltrans Standard Specifications and
►
Construction Site Compliance for
Standard Plans
Water Quality Protection
►
Subdivision Maps Act &Land Surveyor's
►
Monera! on Uniform Traffic Control Devices
Art Industry Standard
(MUTCD)
In addition to review of plans and maps according the list above, CSG has the necessary equipment and
staff to provide topographic surveys for City -owned properties and roadways, and can also prepare
parcel or final maps on the City's behalf.
CSG's construction management services include project oversight, contract administration and
direction during construction, review of submittals, coordination and processing of Requests for
Information (RFIs), review and assistance in negotiating change orders, maintenance of project
schedules, field inspections and review of monthly progress payments to the contractor. Our inspectors
are experienced in all types of public works and development projects such as: water and sewer systems
4
r�
including recycled water systems, pump stations, storm drainage, roadway work, grading, paving, traffic
signals and public buildings, including police and fire stations, community and senior centers, libraries,
and other municipal buildings. They provide onsite construction inspection of all phases of the
construction and supervision of: materials sampling, testing and field survey work, as well as reviewing
onsite safety, traffic control, and public safety. CSG has provided Construction Management and
Inspection Services for many development projects as well as inspected all phases of developments
including water and sewer joint utilities, grading, drainage work, electrical lighting, concrete and asphalt
concrete work_
Review Process
New submittals will be coordinated with Sophie Truo ng, the proposed project manager. At the time of
new submittals, the applicant may decide to meet with the City and Ms. Truong to briefly present the
project and discuss any design challenges. At that time, CSG will perform a cursory review and let the
applicant know if additional documents are needed for the review.
Plan reviews may be conducted either at one of CSG's facilities or on-site at City offices. Typical and
"Expedited" turnaround times for each review will be as described below:
Improvement/Grading Plans
10 days
10 days
10 days
S days
Final Tract Maps
10days
S days
5 days
2-3 days
Parcel Maps
10 days
2-5 days
5 days
2-3 days
Jot Eine Adjwboe llat M
10 days
2-5 days
5 ,days
2-3 days
Once the plan check has been completed, the applicant may decide to meet with the reviewing party to
discuss the comments. Meetings with applicants and City staff may be conducted at CSG's offices or at
on-site at City's offices. CSG will be readily available to meet with developers and engineers to discuss
any concerns they may have at any stage during the review process.
For Final or Parcel Maps, we will perform the functions of Deputy City Engineer and Deputy City
Surveyor and complete the following:
■ Review for compliance with the approved Tentative Maps and Conditions of Approval
► Review for compliance with the Subdivision Map Act
► Review for compliance with the land Surveyor's Act
► Review of closure calculations
► Review of Title information for property, including existing easement based on information
provided in the preliminary title report
■ Review of record documents (maps, deeds, etc.)
► Review Development Agreement, Disposition and Development Agreement
► Review of Precise improvements Plans for compliance with Final/Parcel Map
► Review of other relevant documents/approvals for the subdivision
■ Sign mylar prints of the approved maps as City Engineer and City Surveyor.
1- 45
For Improvement Plans, we will perform the functions of Deputy City Engineer and review the plans and
supporting documents for compliance with the following:
►
Geotechnical recommendations
►
Hydrology1hydroulic studies
►
Municipal Code, City Design Guidelines and Standards, or other City procedures and policies
►
Community Plans (Specific Flan, General Plan)
►
Caltrans Standards
►
CEQA & other environmental documents
-� ►
Development Agreement & Disposition and Development Agreement
►
Finol/Parcel Map & Subdivision Map Act
►
National Pollution Discharge Elimination System (NPDES) permits
►
Other regional agency requirements as they relate to infrastructure needs
►
ADA compliance
►
Trac studies, parking issues
►
Industry Standards
Online Plan Review Tracking
CSG offers a convenient service allowing clients to check plan review status and comments online. By
- . logging on to our website, clicking on Plan Check Status, and entering a password, staff as well as
authorized applicants, can view each project document and communicate with the plan checker via e-
mail or post -a -note. With a password, staff or authorized applicants can download comments from the
web upon completion of the plan review. There is no additional cost for this service.
Quality Assurance/Quality Control
CSG's in-house quality assurance/quality control program utilizes a peer review process with multi-level
internal plan checking and project management. As highlighted in the organizational chart shown within
this proposal, a Principal Engineer directly associated with the project supports experienced staff in the
review process to maintain consistency between projects. Our staff has the technical support, tools, and
technical expertise to review and coordinate various types of development reviews at the highest level.
Fire Department Plan Review and Inspections of Fire Protection Systems
Fire Plan Review
We furnish fire and life safety, special hazards, and fire sprinkler and fire alarm plan review for any and
all structures with emphasis on the unique needs and requirements of each of our clients. We are also
experienced in special hazards and risks associated with industrial and commercial buildings, single-
family and multi -family complexes. We promise thorough, accurate review with prompt turnaround
times and offer comprehensive online status reports.
Our review ensures compliance with all local ordinances, and State Codes and
Federal codes and standards related to Fire and Life Safety, including the
following:
r
2010 California Building Code, Volumes 1 and 2 as adopted by the
Stare of California
2010 California Residential Cade
2010 California Mechanical Code as adapted by the State of California
2010 California Fire Code fos adopted by the State of California]
National Fire Codes as published by the National Fire Protection Association (NFPA); as adopted
and referenced by the State of California
City adopted ordinances and amendments relative to building and municipal codes, including
project Conditions of Approval from other City departments, divisions, regulating agencies, and
jurisdictions
PROJECT TIMELINES
Our typical turnaround is as follows:
New Construction Fire and Life.Saf. r0eview .......
..... .....: ?:
3
..
New Commercial or Residential Complexes
5
3
4 New Campus with Multiple Structures Po...
S e..
3
New Fire Sprinkler System
5
3
Tenant irnpra�rernPnt Firs Spr ralcieF cstem
3
New Fire Alarm System
5
3
Tanani lmprovement FireAiarsn'SjrSte�n
. ..........
3
New Construction Fire and Life Safe
_ tY Review
5
3
Sial Hazard or Use Regulated by the Fire Code
3
Occupancies Using Reportable Quantities of Hazardous Materials
5
3
Review of State Regulated Occupancies.............._.._
3
Many projects are small in scope and plans can be reviewed on-site if in-house staff is utilized. At your
request, we have a team of additional professionals available fortimely
review on complex or sensitive
projects. If a review is anticipated to take longer than the maximum
turnaround timing, we will notify
the City immediately to determine best alternatives.
i4-
"1
Fire inspection Services
SELECTION AND STANDARDS
We offer fully integrated, multi -disciplined building and fire inspection services for residential,
commercial, and industrial projects, and are experienced in all construction types. Our certified
inspectors ensure compliance with applicable fire codes and requirements by identifying code violations,
offering solutions to developers, property owners and tenants on potential risks and safety hazards, and
by working as a team to correct violations. Our fire inspection staff easily integrates into client
organizations, consistently implementing policies and procedures and remaining transparent to
applicants and customers.
For purposes of consistent application and public relations, our inspectors research the policies
and special code interpretations of the City. All inspections ensure compliance with current City
and State building codes and ordinances.
INSPECTION SCHEDULE
Our building and/or special project related inspection services are provided as -needed. Personnel are
typically available for duty from Monday to Friday, from 8 a.m. to 5 p.m.; however we can easily alter
our hours to better fit the City's needs. Emergency inspections (usually requests that pertain to a serious
or urgent life/safety issue) can be provided as they are needed; nights, weekends and holidays. All staff
is familiar with a multitude of jurisdictional scheduling and tracking systems and can quickly adapt to
City requirements.
CONTINUING CERTIFICATION AND TRAINING
We take pride in working with inspectors motivated to achieve the highest level of experience and
certification. We work hard to match your jurisdiction's level of safety and code compliance and
understand that personality and customer service is crucial to on-the-job success. All CSG inspectors are
certified and are routinely updated through specialized training classes and seminar attendance in
approved and modern methods, materials, tools and safety used in building inspection, as well as the
most current building standards.
INSPECTION NOTIFICATION TIME
CSG will work with the City to provide inspection staff in a timely manner. Notification time required to
provide inspection staff is typically 24 hours.
TOOLS AND EQUIPMENT
CSG provides all vehicles, fuel maintenance and other equipment necessary for inspectors to carry out
duties.
2�8
Permit Processing 1 Front Counter Support
C5G has staff immediately available to provide Permit Technician services. As requested, the following is
our summary of qualifications to provide the requested services. Resumes for all proposed staff are
included in the Appendix of this proposal.
These first response services are vital to the success of the entire building and safety permit process as
they often set the tone for the applicant whether a homeowner, contractor, or architect. CSG handpicks
exceptionally qualified personnel with a central focus on operating as an extension of the City's team,
,.5 understanding the importance of exemplary customer service, knowledge on the inner -workings of
building departments, and are thoroughly familiar with the building application and permit process.
Our permit technicians are trained in a multitude of jurisdictional scheduling and tracking systems and
can quickly adapt to City requirements. Many of our staff are also dual -role employees and can serve as
hath inspector(s) and front counter support. Personnel work collaboratively with applicants and have a
can do attitude to help resolve issues and find solutions for applicants. Qualified candidates with the
required experience will be presented for City approval. Personnel can provide the following, but are not
limited to:
P Welcome and receive customers at the public services counter
► Provide public information regarding permit applications, plan review and inspection
requirements
P Answer questions quickly and correctly directly from the public, from phone calls and emails
t Receive, process and issue building permits and coordinate the plan review and inspection
a process, including tracking, routing and storage of plans
1 ► Ident6 and assist in the collection of all necessary fees for building permit applications, and
r' other building department services
�r
► Maintain filing systems necessaryfor tracking in -progress applications, permits issued, plan
checks in progress, approved plans and other appropriate
► Develop reports required such as applications submitted, permits issued, inspection requests,
revenue, etc.
► Create public informational documents, handouts explaining technical issues or requirements for
permit issuance
► Familiarity with various permit tracking software programs
D
Iwo
--h
Code Enforcement
Code enforcement activities are a crucial service to ensure not only public health
and safety but also to enhance economic development throughout the City.
Blighted conditions such as vacant lots, overgrown weeds, deteriorated building
exteriors, missing or broken windows and screens, foreclosures, and inoperable
vehicles all contribute to City deterioration. CSG can supply code enforcement
specialist to identify and work with property owners to correct code violations to
the exact specifications needed to satisfy the City. Codes and ordinances
enforced include:
► Zoning Codes
Building Codes
► Housing
► Public Nuisances
► State Health & Safety Codes
► Other Issues Relating to Health, Safety, and Community Welfare
Typical services include preparing abatement cases for and testifying in public hearings and court
proceedings on behalf of the City, serving as a resource and providing information on the City of Costa
Mesa regulations to property owners, residents, businesses, the general public, and other City
departments and divisions.
Staffing Qualifications
Technical Capabilities and General Experience
CSG is well qualified to provide professional plan check and inspection services to the City of Costa Mesa
for Building, Grading Improvement and Fire Prevention services. All of our clients are exclusively public
agencies, thus eliminating any concern of conflict of interest. Each of our proposed staff members
possesses the necessary certification and training required for these services. Please refer to the
Technical Capabilities and Personnel Qualifications Table for more detailed information regarding our
proposed staff credentials. We have included a comprehensive list of clients and services provided
within the References Section of this proposal.
Our staff understands the development approval process because we have worked side-by-side with
local communities building and refining these very systems. CSG has carefully selected key professionals
and anticipated resources specific to this project. We offer professional engineers, highly qualified plan
examiners, fully certified inspectors as well as certified technicians with extensive experience. All
proposed personnel are highly skilled and experienced understanding the policies and procedures
necessary for streamlined services and superior customer care. Main staff profiles are included within
this proposal for your review. Additional staff can be added when workload warrants. With each
additional staff member proposed, CSG will obtain prior approval from the City's designated manager.
LV CSG will not utilize the services of sub -consultants for this contract.
Commitment to Excellence
We encourage staff to participate in and contribute to the many associations important to aur industry.
CSG was recently honored as the California Building Official Association's (CALBO) Industry Leader of the
Year for service and dedication to the building and safety industry. Knowing technical excellence and
r� proficiency is vital to successful public service, attendance at update seminars, specialized training
classes, and continuing certification conferences are an integral part delivering the best in the business
to our clients. Many of our staff hold or have held key positions within the groups listed below as well as
serve as in -demand instructors and trainers. We support community outreach whenever possible.
�. LEAGUE
"e-- OF CALIFORNIA
�- CITIES
-' MEMBER
CfnC+�" (ALIFORNAMADINGOFFICLAIE
� 1
rx+oF.ru in.rNd..rx.oiw.
I
► League of California Cities
► California Building Officials
► International Code Council
► ICC Chapters of Sacramento Valley, Fast Bay, Peninsula,
Napa-Solano, Yosemite, Monterey, Shasta Cascade, Los
Angeles Basin, Coachella, Orange Empire, Foothill
■ County Building Officials of California
► California Fire Chiefs Association
► Northern Fire Prevention Officers
► Southern Fire Prevention Officers
■ American Public Works Association
► institute of Transportation Engineers
► Structural Engineers Association of Northern California
► Structural Engineers Association of Southern California
Project Management and Team Interaction
Khoa Duong, PE, will serve as Project Manager for this contract and ensure adequate resources are
applied as well as oversight and quality control at all levels. Khoa has acted as the contract Building
Manager for many Southern California communities throughout his career.
Primary Personnel Qualifications
Khoa Duong, PE
Professional Engineer, State of California
43901
Project Management,
Project Manager/ Plan
Certified Plans Examiner, ICC Certified
0846436
Building (Structural & Non -
Review Engineer
Structural), T24 Energy,
Accessibility, Plumbing,
Mechanical, Electrical
Paul Armstrong, PE, CB0
Professional Engireer, State of California
45484
Building {Structural 8 Non-
enior Flan Review
engineer,
Building Official, tCC Certrfed
0002014 -CB
Stnxtural), T24 Energy,
Building official
Accessibility, Plumbing,
MechanicN. Elec€racat
Ritchie Kato,
Structural Engineer, State of Caiiiomia
SE2650
& Non
p
SE, PE, CASA
Civil Engineer, State of California
031833
StructuraBuilding l), T24 En
Energy,
Structural Plan Review
CASp Specialist
272
Plumbing,
Accessibility, Plumbing,
Accessibility,
Engineer
,
Mechanical, Electrical, CASp
Ed Chock, 5E, PE
Structurai Engineer, California
5! 3759
Structural Engineer
Structural Engineer, Nevada
018W5
Structural Engineer, Arizona
51735
Structural Engineer, Utah
78507M
Civil Engineer, California
2203
Civil Engineer, Nevada
24158
Building (Sbuct'ural & Norr-
Civil Engineer, Texas
018605
Structurat), T24 Energy,
D
Certified Building, ICC Certified
106754 3118
Accessibility, Plumbing,
Plans Exarrorier, ICC Certified
88554
Mechanical, Electrical
ID
Building Plans Examiner CBCCertified
01230W
Building Plans Examiner Certified
6123030
Certifted Building Official Certified
6123430
Regisfered Civil Engineer
24158
Registered Structural Engineer
3758
Tung Le, EIT
Plans Examiner
Building (Structural & Non -
Plans Examiner
Structural), T24 Energy,
Accessibility, Plumbing,
Mechanical, Electrical
Sophie Truong, PE,
civil Engineer, State of California
068110
Development
QSPIGSD
Certified SWPPP D evelope r1P ractitioner (QSDf.QSP)
Review/SWPPP Plan Review
Senior Engineer I SWPPP
Vance Cools
Bui'ding Inspector, ICC Certified
5003436
Combination Inspector
Combination Inspector, ICC Certified
5003436
Residential Combination Inspector, ICC Certified
5003436
Inspection
Commercial Plumbing Inspector, ICC Certified
5003436
CALBO Disaster Worker
5403436
SAP50558
Dennis Lockard
Certified Fire Marshal, Registered Chief Officer
Fire Plan Review, Inspection
Fire Plan Reviewerllnspector
uniform Fire Code Inspector,
1055844
Fire Inspector II
1065844
Daniel Najera
Fire Prevention 1A
Fire Plan Review, inspection
Fire Prevention 1 B
Fire Prevention 10
a�
Alenoush (E1#en) Petr ian
Building &Safety Permit Technician 1 &'2
g
p�(t'Technician
iJ
Permit Technician, Clerical
Relevant Project Experience I References
A brief sampling of our relevant experience is presented below.
The Anaheim Regional Transportation Intermodal Center (ARTIC) I ANAHEIM, CA
CSG performed fire and life safety and electrical reviews for the
Anaheim Regional Transportation Intermodal Center (ARTIC) project;
a world-class development project in the City of Anaheim at 2626
Katella Road. ARTIC combines a transportation gateway and mixed-
use activity tenter on a 16 -acre site owned by the Orange County
Transportation Authority (OCTA) and the City of Anaheim.
Construction details include a 120 foot high dam shell-like, 2 -story
structure and interior mezzanine. The structure is connected to train
platforms by a bridge.
ARTIC will serve as a hub for Orange County and the region, where
freeways, major arterials, bus routes and Orange County's backbone rail system converge. ARTIC
services will include: OCTA bus, Anaheim Resort Transit, airport flyaway shuttles, taxi, and tour and
charter buses as well as accommodate future plans for the Anaheim Rapid Connection (ARC) and high-
speed trains.
City of Fullerton Police Department Facility I F U L L E R T o N. CA
The present Fullerton Police facility was originally dedicated as the City Hall in July,
1942. The building's balanced design, enclosing the sunken patio on two sides, is
complemented by fine detail work that is particularly apparent in the central corner
tower. The Police Department has occupied the building since construction of the
New City Hall in 1963.
A Coordinated and provide building and structural plan check
P Provided on-call building inspection services
Best Buy I TUSTIN. CA
I Provided on-going building plan review
P Provided Building Inspection services
I Reviewed plans for on- and off-site improvements
I Collaborated with the city toward the timely delivery of the
project
Participated in hearings and presentations to City Council and
various neighborhood organizations
Richard Nixon Library I YCRBA LINDA. CA
► Coordinated and provided building and structural plan
review throughout the project
► Reviewed plans for on-site improvements
► Assisted the City in handling Architects, Structural Engineers,
and overall plan check comments
► Worked with staff and development team from the
beginning to ensure all questions pertaining to the structure
were addressed, thereby allowing construction to start on
time
► Participated in numerous hearings and presentations to City
Council and various neighborhood organizations
References
Our track record of success with our clients is outstanding and we encourage you to contact our
references with any questions or clarification you might require. We have provided representative
building services within the last year or longer for the following:
City of Fullerton
County of Orange
Kirk Warren
Hadi. Tabatabaee, P.E., C.S.O.
Building and Cade Enforcement Manager
County Building Official
303 West Commonwealth Avenue
300 N. Flower
Fullerton, CA 92832
PO Box 4048
(714) 738-6558
Santa Ana, CA 92702
Building Plan Review and Inspection Services
(714) 667-8843)
Ongoing -11 years
Staff Augmentation, Engineering Plan Review Services
Ongoing - 7 years
City of Anaheim
Jon Traw, P.E.
Chief Building Official
200 S. Anaheim Blvd.
Anaheim, CA 92805
(714) 765.5153
Building Plan Review and Inspection Services
Ongoing — 4 years
City of Orange
David Khorram, P.E.
Building Official
300 East Chapman Ave.
Orange, CA 92865
(714) 744-2222
Building Plan Review and inspection Services
Ongoing —12 years
City of Tustin
Y. Henry Huang, P.E., C.B.O.
Building Official
300 Centennial Way
Tustin, CA 42780
(714) 573-3130
Building Plan Review and Inspection Services
Ongoing - 8 years
City of La Habra
Roy Fewell
Chief Building Official
201 E. La Habra Blvd.
La Habra, C4 90531
(552)905-9724
Building Plan Review and inspection, Building Official,
Counter Technician, Staff Augmentation,
Engineering Plan Review Services
Ongoing —10 years
-255
�y
Proposed Rates
CSG will mail an invoice at the beginning of every month for services rendered during the previous
month. We do not anticipate the use of sub -contractors for this project. CSG provides pick-up and
delivery of plans as no additional cost. CSG proposes the use of a percentage option based on plan
review fees collected by the City, or compensation utilizing hourly rates.
Percentage I Hourly Rate Schedule
CSG will mail an invoice at the beginning of every month for services rendered during the previous
month. Compensation can be based on hourly rates or on a percentage fee basis. Hourly fees are listed
as well as the requested proposed percentage fees:
Plan Review Services
Description Rates
*Fee includes initial review and 2 reviews, if necessary, additional reviews will incur hourly fees
Full Plan Check Services by Percentage .................... . .. . . . . . . ... 75% of the City's Collected Plan Review Fees
Structural j Mechanical I Electrical I Plumbing
. Plan Review by Percentage ........................................... 35% of theCity's Collected Plan Review Fees
Chief Plan Check Engineer (Manag"er) ................... ........:. '....... .. , ...................... $100 per hour
Plan Check Engineer. .............................. _ ....... ............... ... . $85 - 95 per hour
Plans Examiner, ......................... ...... ................ $75 per hour
Building Inspection Services
Chief of Inspection (Manager) ...................... ................................................
$80 per hour
Senior Building inspector (Supervisor) .. ............................................................
$70 per hour
Combination Building inspector......................................................................
$55 per hour
Building Official Services
Assistant Building Official. . . ...................... ..............
.... ....... . ...................... $100 per hour
Permit Technician Services I Clerical Support
_. Permit Technician Supervisor/Manager..........................................
. ................... $50 per hour
Permit Technician II ............................................
.................................... $40 per hour
Permit Technician I (entry level)....................................................................
$30 per hour
Office Supervisor/Manager..........................................................................
$30 per hour
Office Assistant II.. . ........ ____ ........ __ ..............
_ ....... ........... ........ $30 per hour
OfficeAssistant ....................................................................................
$30 per hour
CASp Services
CASp Consultation... . ......... ___ ....................
_ .......... ................ $85 per hour
CASp Inspection ...................................................
.................................. $55 per hour
Fre Prevention Services
Fire Marshal........................................................................................
$95 per hour
Fire Plans Examiner ...................................
85% of the City's Collected Plan Review Fees $85 per hour
Fire Inspector.......................................................................................
$55 per hour
Code Enforcement Services
Chief of Code Enforcement (Manager) .....................................
. ........................ $80 per hour
Sr. Code Enforcement Officer (Supervisor)..........................................................
$70 per hour
Code Enforcement Officer.. . _ . _ _ . ... ................
..................... ...... _.. _ _ _ $55 per hour
All hourly rotes include overhead costs including, bur not limited to, salaries, benefits, Workers Compensation insurance, office
expenses, etc. should the scope of work change or circumstances develop which necessitate special handling we will notify the
City prior to proceeding. Annual adjustments may be made by mutual agreement based upon current CPI.
Additional ! nfonnation Ir.
Optional Contract Services
As a multi -discipline firm, CSG can provide additional consulting services in response to the City's needs
and requests. When additional staff is needed, our experienced professionals are ready at a moment's
notice. We will work side-by-side with existing staff to meet needs and budget requirements. We
currently augment staffing in many Building Departments, serving as building officials, inspectors, and
counter technicians during periods of transition or high level project flow. CSG can also furnish code
enforcement, geotechnical plan check, grading, subdivision map, and improvement review. We can
work full-time or part-time, on a long-term or temporary basis.
Electronic Plan Review
CSG has an excellent Information Technology team available to assist the City with any IT needs. Our
staff is extremely familiar with many municipal software applications. In addition, CSG has developed
GreenVue Fusion, an innovative web -based Electronic Permit System integrated with a Digital Plan
Review engine. Our product is a single source solution managing the full life cycle of any community
development project, big or small_ CSG currently provides digital plan review services to a number of
jurisdictions within California. By allowing for the electronic management and delivery of all
documentation required for a project, it is possible the only piece of paper printed will be the final
Certificate of Occupancy. Our integrated, intelligent system includes the following key modules:
► Permit Generation and Management
■ Plan Routing and Trucking
► Collaborative Digital Plan Review
■ Field Inspection Management
■ Code Enforcement Case Tracking
► Digital Archive
► Built-in Public Web Portal
GreenVue Fusion is backed by CSG's diverse team of highly experienced individuals with solid public
-- service backgrounds. We leverage the latest technologies to deliver a superior product. GreenVue
Fusion represents the next logical step in the evolution of permit systems.
Environmental and Sustainable Programs
The Environmental and Sustainable Programs Section can provide jurisdictions with program design,
development, and implementation in green building programs, sustainable City programs, waste
reduction programs, and climate change action plans. CSG can work with your staff to create a practical
1
` and effective program with CSG staff providing guidelines, policies, resources, and implementation
assistance.
J r30!T2�0 n c ^ 7vasu mes
KH®A ®U®NG, PE
Vice President, Southern California
Building and Fire Life Safety
LICENSES I CE@IIVICATIONS
Civil Engineer, State ❑f California 1439oi
Plans Examiner I lcc 084o436 -B3
CEC Non Residential I NR05-94-5665
GEC Residential f 805-05-5055
EDUCATION
Bachelor of Science, Civil Engineering I California Polytechnic State University, Pomona
Mr. Duong serves as CSG's Building and Life Safety Manager and perforins the key role of plan review
quality control. With more than twenty five years of experience in building plan review, including onsite
plan check engineer services, Khoa ensures that CSG's clients receive the highest quality plan review
services. Prior to joining CSG, Mr. Duong worked in both the public and private sectors. His experience
includes the following -
.0 Vice President in charge of plan review for Berryman & Henigar, where he worked for Pen years
0 Supervising plan review engineer for Wilidan, where he was responsible for the day -Po -day
operations of the pian review section in the Sara Bernardino office and served as plan review
engineer for numerous cities and counties throughout California and Nevada.
P Flan review engineer with the City of San Diego Building Department.
Mr. Duong's expertise includes review of complex commercial, industrial and residential structures for
compliance with applicable building codes and ordinances, engineering standards and specifications,
supplemental energy requirements, and ADA regulations- The following reflects a portion of Khoa's
relevant experience. -
Supervising Plan Check Engineer, Various California Cities. Khoa provided plan check oversight for
over 40 jurisdictions, including the Cines of San Bruno, South San Francisco, Pomona, Fontana, Sim:
Valley, Mission Viejo, Garden Grove, Redondo Beach, Hermosa Beach, Buena Park, Santa Ana, Indian
Wells, Loma Linda, Ontario, Colton, and San Bernardino, as well as the Counties of San Bernardino, Los
Angeles and San Diego. in addition, Khoa managed plan check engineers and oversaw the day-to-day
operations of the building department. He also served as engineer for plan check services, performing
paper and electronic structural plan check and non-structural MEP, energy, and ADA reviews for
commercial, industrial, and residential structures.
Plan Check Engineer, Various California Cities. Khoa served as Plan Check Engineer for the Cities of
Turlock, Burlingame, Rancho Cordova, Chino. Murrieta, and Costa Mesa. Mr- Duong performed structural
plan check and nor -structural MEP, energy, as well as ADA reviews for commercial, industrial, and
residential structures -
In -House Plan Check Engineer, Various California Cities. Khoa served as an In -House Plan Check
a._ Engineer for the Cities of Orange, Fullerton, Yorba Linda, Tustin, Westminster, and La Habra, performing
structural plan check and non-structural MEP. energy, and ADA reviews. He interfaced with developers,
architects, and engineers.
J 9
f +
PAUL ARMSTRONG, PE, CBO
Senior Plan Review Engineer I Building Official
LICENSES AND CERTIFICATES
Building Official 10002014 -CB
Professional Engineer, State of California 145464
EDUCATION
B.S. Civil Engineering I California State University, Long Beach
Advanced Study, Fire Protection Engineering I University of California, Irvine
PROFESSIONAL AFFILIATIONS
Secretariat: International Residential Code for 1 and 2 Family Dwellings (1997-2000)
Co -Secretariat: ICC
Performance Based Building Code
Secretariat: International Zoning Code (1996-2000)
Secretariat: General Design, Administrative, Lateral Design, Fire and Life Safety and Fire Risk Code
Committees of ICBO (1992-1996)
Technical Editor: 1997 Uniform Codes and UBC Handbook
NIBS HHS Code Comparison Committee (1994)
FEMA Building Performance Review Team member (1993)
NIBS Flood Standards Comparison Committee (1992)
Coordinator, Pacific Rim Conference on Performance Based Codes
Various ASCE Standards committees
SEAOC Code Committee liaison
ASME A17.1 Code Coordinating Committee
ANSI Construction Standards Board
AWARDS
CALBO Instructor of the Year
Paul offers a strong background in plan review and code development from his longtime position with ICBOACC
starting as an engineer and ending as Vice President. Paul was the Building Official of EI Monte and "knows
code" from many angles with 21 years experience in the building codes and standards community, including his
work with all the Uniform and International Codes, ASCE 7, ANSI A917.1, FHAct, ADA, CA Title 24 Accessibility
regulations, to name a few. At CSG Paul combines his wealth of knowledge, hard work, and excellent customer
services; tap into Paul for all code related issues including effective plan review and inspection solutions.
Z6,
H
3
91
41
0
on
r
m
c
3
D
m
n
9
RITCHIE KATO, SE, PE, CASp
Plan Review Engineer
LRCERSES r CERTIFICATiON
Structural Engineer, State of California I SE2650
s Civil Engineer, State of California 1 C31833
Certified Access Specialist I CASp-272
EDUCATION
M.S. Degree, Structural Engineering I Stanford University, Palo Alto, CA
B.S- Degree, Civil Engineering I California Polytechnic State University, Pomona, CA
Mr. Kato is a Structural Engireer and Building Official for CSG Consultants, Inc. His extensive experience in
b performing plan review on public, commercial, industrial, and residential structures provides CSG's clients with
premiere quality plan review services- His expertise includes structural design and plan review far compliance
with applicable UBC, UPC, UMC, NEC, Califomia amendments, accessibility, energy requirements, and state
handicapped regulabons-
Prior to his employment with CSG, Mr. Kato was the Principal for Kato Engineering, where he performed
structural engineering consulting services for public and private clients. He was responsible for structural design
and structural plan reviewing for a full spectrum of building types and occupancies. His employment with the
City of Westminster provided him with extensive plan review experience, Mr- Kato reviewed plans for
compliance with all relevant state and local codes -
Subsequent to his work with the City of Westminster as a plan review engineer, Mr. Kato was commissioned by
the City to update the municipal code to correspond to current California code requirements.
Mr- Kato has performed plan review for the Westminster Town Hall and Police Station, Laguna Hills High
School, Chapman University, Whittier Christian High School, and the City of Orange, Main Public Library. His
extensive knowledge of public buildings and his commitment to timeliness and quality contribute greatly to each
jurisdiction he serves.
r-
Mr. Kato was commissioned as full-time Buildino Official for the City of La Habra. Recommended by the City of
Orange, Mr, Kato assisted the City of La Habra; Building Department during their period of transition,
supervising and managing pian review, inspection and counter staff, coordinating the various building
departments, and managing personnel issues. Additionally, Mr. Kato coordinated City and private projects with
the building, planning, engineering, and public works departments, worked to update the City's municipal code,
t_ and provide feedback to facilitate development of efficient departmental practices and procedures.
Mr. Kato has the expertise and broad experience necessary to effectively coordinate, foster, and help develop
all aspects of a municipal building department.
In
In
0
C
M
n
rD
n
a
in
w
rn
ED CH®CK, SE, PE
Structural Engineer
LICENSES I CERVFICATIlONS
Structural Engineer, California 13759
- Structural Engineer, Nevada I oi86o5
Structural Engineer, Arizona 151735
Structural Engineer, Utah j 7850765-2203
Civil Engineer, California j 24158
Civil Engineer, Nevada i o18605
Civil Engineer, Texas 1 *5754
Building Official I =3778
Plans Examiner I lcc ss554
Building Plans Examiner CSC Certified 10123030
Building Plans Examiner Certified w3wo
Certified Building Official Certified o723b3o
Registered Civil Engineer 124158
Registered Structural Engineer 13759
EBUCATION
Master of Science, Civil Engineering j California State University, Long Beach
Bachelor of Science, Mechanical Engineering I California State University, Long Beach
As a Structural Engineer for CSG Consuitants, Ed provides pian review of complex structural and non-structural
buildings for numerous government agencies and municipal jurisdictions. He has a thorough knowledge of local,
state and international building codes.
Ed has both public and private sector experience. Prior to joining CSG, he worked as a consultant Plan Review
Manager, with oversight in the day to day operations of the building plan review division. Duties included plan
checking, management of the plan review function, hiring and training plan check staff and providing building
official services to contract cities.
Ed also served as Building Official for the City of Dana Point; providing building department management for the
City, responsible for plan check, building inspection and the public counter staff.
Additional private experience includes serving as Plan Review Division Manager for a consultant company with
duties including plan check of buildings and structures for compliance with the California Building Code, Title 24
Disabled Accessibility and Energy requirements, coordination of plan check service with contract jurisdictions
and staff supervision.
As an Engineer with the County of Orange, his duties included pian checking, public counter service and issuing
building permits for building projects in the county unincorporated areas.
Ed also served as a Senior Facilities Design Specialist/Lead Structural Engineer for Rockwell international's
Rocketdyne Division in Canoga Park. In this role, his respombilities included design and construction
management of construction project for company facilities such as rocket test stands, manufacturing and
industrial buildings, office renovations, bridge crane systems and pipe support systems. Duties included
structural design and drafting, project management, construction coordination, review of vendors design and
management of the structural design unit_ In addition, he supervised the engineering of the civil/structural design
group.
M
CL
rn
0
n
m
TNNG LE, EIT
Plans Examiner
LICENSES / CERTIRCATIONS
Engineer -In -Training, State of California 1122739
EDUCATION
Bachelor of Science in Civil Engineering (Structural Emphasis)
California Polytechnic State University, Pomona
Mr. Tung D. Le serves in the Plan Review Division at CSG's Southern California headquarters, located in
Santa Ana. He currently performs building plan reviews of complex commercial and residential structures
and reviews existing buildings for change of use or occupancy in compliance with California codes and
City ordinances. Mr. Le brings a strong work ethic and positive attittude, providing CSG's clients with the
highest quality plan review and customer service.
Prior to joining CSG, Mr. Le developed his skills in structural design during his internship at Van Dorpe
Chou & Associates, a structural engineering consultant firm. He performed structural design for single
family dwellings and residential complexes, as well as shop drawing reviews.
Mr. Le has also broadened and developed his level of experience through his internship as a staff
engineer at Leighton Group Inc., focusing on geotechnical engineering. His duties included obtaining soil
samples, conducting field investigations, formalizing boring logs, and preparing soil reports.
In
In
V
M
r -
M
X)
r
ro
M
SOPHIE TRIJONG, PE
Senior Engineer
REGISTRATIONS/ CERTIFICATIONS
Professional Civil Engineer I State of Calhbmia 68110
Certified SWPPP Developer/Practitioner (QSDIQSP)
EDUCATION
Bachelor of Science, Civil Engineering
University of California Berkeley, Berkeley, CA
TRAINING
California Subdivision Map Act Seminar
Bay Area Hydrology Model (BAHM)
Municipal Regional NPIDES Pen -nit Provision C.6 (Construction BMPs)
Ms. Truong has extensive experience in both the design and review of various types of projects at all
levels of development, from entitlement to final grading and improvement plans. Past projects have
included the preparation or review of tentative maps, final or parcel maps, and comprehensive
improvements plans for large, hillside and coastal residential subdivisions in both Southern and Northern
California, commercial and industrial projects in San Francisco Bay and the Los Angeles regions, and
various local public works projects such as bicycle paths, new roadway construction, roadway
rehabilitation, and utility projects. Some of Sophie's recent review projects include:
► Pacific Ridge 63 -lot Subdivision in Haff Moon Bay
! Redwood Gate 45 -lot Subdivision in Palo Alto
► The Oyster Point Redevelopment Project in South San Francisco
e The Branciforte Creek 32 -lot Subdivision in Santa Cruz
! Menlo College / Menlo School Redevelopment in Atherton
As part of her development review experience, Sophie manages incoming submittals, reviews plans and
prepares comments and redlines, and regularly meets with project applicants and City personnel to
- review the project and discuss design issues. In addition, Ms. Truong has been effectively managing
CSG's Development Review team since 2008, not only providing quality assurance/quality control for in-
house reviews, but also providing training, mentoring and engineering support to the review team.
Ms. Truong is particularly adept at reviewing projects for compliance with the State's Subdivision Map Act,
Local Ordinances, Project Conditions of Approval, NPDES permit requirements, CEQA mitigation
measures, Coastal Development Permit conditions of approval, and any other permits or regulations
enforced at the municipal, state, or federal level.
In addition to providing development review services, Sophie also provides on-going design and
surveying efforts as a project manager for Public Works projects. Some of Sophie's recent design
experience includes the Seymour Street Extension to Highway 1 and the Highway 1 Bicycle and
Pedestrian Trail in Half Moon Say, the federally funded Serramonte Blvd Roadway Rehabilitation Project
in Colma, and the Spencer Dam Spillway Repair ad Tartan Trail Sanitary Sewer Relocation Project in the
Town of Hillsborough.
Prior to joining CSG, Ms. Truong pursued a career in geotechnical engineering where she acquired
valuable knowledge in the construction industry preparing engineering recommendations for various
types of foundations and supervising field and laboratory work. She followed her geotechnical experience
with two years as a consultant for the City of Los Angeles, establishing methods of repair and managing
construction of the City-wide sewer system damaged in the 1994 Northridge earthquake.
In
In
V
M
a
In
F
M
LIn0
0
M
M
VANCE COOK
Building Inspector
LICENSES 1 CERTIFICATIONS
Building Inspector I rcc 500343.5-10 5043436-85
Combination Inspector I rcc5403436_s6
Residential Combination Inspector ; ICC5003436-R5
California Commercial Plumbing Inspector I icc 5oo343&i3
CALBC disaster Worker Certified I sgpsmw
EDUCATION
Fullerton Community College, Fullerton, CA I Electrical, Plumbing, Mechanical, Title 24
Energy/Access Disabled Access I Fullerton, CA
Addison Career Institute, uniform Building Code j Ontario, CA
Cerro Coso Community College, AA Degree I Ridgecrest, CA
Dale Camegie: Human Relations 1 Speaking I Anaheim, CA
Mr. Cook is a Building Inspector who joined CSG with oder ien years of professional experience, focusing on
building inspection and plan review. Among his many projects are commercial and residential building
inspections, chief swimming pool inspector for commercial and large estate for the City of Anaheim, contract
municipal building inspector for the cities of La Habra, Costa Mesa, and Tustin, permit technician services for
the County of Los Angeles, and structural surveys for the City of Los Angeles. Major projects include complete
inspections of renovated commercial structures, rated and non -rated single and community family residential
new construction, and assisting the cities of Costa Mesa and Tustin in implementing the 2005 energy code.
Prior to joining CSG, Mr_ Cook performed building and safety inspection services for three years for a number of
independent developers, contractors, and the public.
He has a wide range of experience including: field inspection; t1_B.C_ application; electrical, mechanical and
plumbing code application; code enforcement; permit technician; commercial and residential inspection,
commercial inspection, fire safety and administration.
3
In
In
0
In
F
C
ti
n
rD
D
n
0
0
x
AA0
�I
ALENOUSH (ELLEN) PETROSIAN
Permit Technician
C
LICENSES / CERTIFICATIONS
Building & Safety Permit Technician 1 & 2 C S"
EDUCATION
AutoCad I Irvine Valley College & Orange Coast College
Microsoft Office, Word, Excel, PowerPoint I Irvine Valley College
Adobe Acrobat, Enterprise 1 -JD Edwards and Quickbooks
Ms- Petrosian brings a full complement of experience and talent to any front counter environment. She is
extremely skilled at municipal environments, processes and procedures and understands the value of
exceptional customer service.
EXPERIENCE
City of Costa Mesa I Building and Safety Department & Transportation /Engineering Department
Intern/Volunteer
► Administrative duties, riling, word-processing, spreadsheets and data entry'
► Document archiving tracking and updating reports
J ► Permit technician duties; processing a variety of land use, building, plumbing, mechanical, reviewing
plans and development applications for completeness, calculating fees, issuing permits and explaining
the review process to front counter clients
► Scanning, drafting, and desktop publishing
► Engineering support related to the program area
PEP Investments I Irvine CA LARNC®, Inc. I Glendale, CA
Mechanical Engineer/Cost Estimator
► 1 -IUDs project based — Section 8 Housing Program
► Communications and interact with residents to ensure resident satisfaction
► Conduct showings for interested leasing prospects
► Filing, expense reports and financial management
® Rent collections, bank deposits, financial statements
► Monitor delinquencies
► Process purchase invoices and accounts payable
t` ® Manage and monitor maintenance requests and maintenance crew to assure coordination
► Site inspections to ensure work completion
r;
a
In
In
0
F
M
0
F-
m
rD
0
ALENOUSH (ELLEN) PETROSIAN
Permit Technician
LICENSES / CERTIFICATIONS
Building & Safety Permit Technician 1 & 2
EDUCATION
AutoCad I Irvine Valley College & Grange Coast College
Microsoft Office, Word, Excel, PowerPoint I Irvine Valley College
Adobe Acrobat, Enterprise t -JD Edwards and Quickbooks
Ms. Petrosian brings a full complement of experience and talent to any front counter environment. She is
extremely skilled at municipal environments, processes and procedures and understands the value of
exceptional customer service.
EXPERIENCE
City of Costa Mesa I Building and Safety Department & Transportation /Engineering Department
IntemlVolunteer
► Administrative duties, riling, word-processing, spreadsheets and data entry'
► Document archiving, tracking and updating reports
P Permit technician duties, processing a variety of land use, building, plumbing, mechanical, reviewing
plans and development applications for completeness, calculating fees, issuing pen -nits and explaining
the review process to front counter clients
► Scanning, drafting, and desktop publishing
► Engineering support related to the program area
PEP Investments I Irvine CA LAPINICO, Inc. I Glendale, CA
Mechanical Engineer/Cost Estimator
► HUD;s project based - Section S Housing Program
► Communications and interact with residents to erasure resident satisfaction
► Conduct showings for interested leasing prospects
► Piling, expense reports and financial management
► Rent collections, bank deposits, financial statements
► Monitor delinquencies
d Process purchase invoices and accounts payable
► Manage and monitor maintenance requests and maintenance crew to assure coordination
D Site inspections to ensure work completion
2-0
a
a
M
T.
ro
0
0
m
rn
ro
0