Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
- - Action Plan Amendment Attachment A - 6/19/2012
CPMP Version 2.0 Grantee Name: City of Costa Mesa Project Name: Street Improvement -Mission Drive Alley Description: I 131DIS Project #: I JUOG Code: ICA60846 COSTA MESA Street rehabilitation - Reconstruction of curb, gutter, sidewalk, driveway and driveway approaches. Additionally, cross gutter and spandrel will be replaced as part of alley pavement reconstruction, National Objective: Low- & Moderate - Income Area Benefit 24 CFR 570.208 (a)(1). Location: Priority Need Category CT:0639.04 BG:1 - 78.9% Low/ModSelect one: Infrastructure - --- ...... .._ . Explanation: Expected Completion Date: Activity will help revitalize neighborhoods by eliminating blighting conditions. Pro'ect revised as art of lune 19 2012 Action Plan Amendment. Original budget zctive reduced by $130.000 which was reallocated to Pro'ect #31 Wallace Ave.- — ObjectiveCategory Obje Storm Drain). D Decent Housing Q Suitable Living Environment ❑ Economic Opportunity Specific Objectives Outcome Categories Improve quality increase quantity of public improvements for lower income persons v 1 ❑ Availability/Accessibility ❑ Affordability 2 L ❑� Sustainability 01 People V Proposed 1,801 Accompl. Type: N J +� Underway Complete s Accompl. Type: Accompl. Type: V V N Oi O. __Jfi Accompl. Type: Accompl. Type: a Proposed Outcome Performance Measure Actual Outcome Eliminate at least one condition CD8G to be used to improve street contributing to neighborhood surfaces that are 75% - 5011/o blight deteriorated 03K Street Improvements 570.201(c) 1w Matrix Codes Matrix Codes Matrix Codes Matrix Codes j V . Matrix Codes L� Pro osed Amt. $ 197 455 N Co13G C p Fund Source: `► Actual Amount 06,105,112 72 Attachment A, CPMP Version 2.0 Grantee Name: City of Costa Mesa Project Name: Public infrastructure Improvement - Wallace Ave Storm Drain Description: I IDIS Project #: F JUOG Code: ICA60846 COSTA MESA CDBG funds will be used to install three catch basins and an underground reinforced concrete pipe storm drain system. National Objective: Low- & Moderate -Income Area Benefit 24 CFR 570.208 (a)(1). Location: Priority Need Category r Select one: Explanation: Expected Completion Date: Activity will help revitalize neighborhoods by eliminating blighting conditions. Pro"ect was approved as an amendment to the FY 11-12 Annual Action Plan 06/30/2013 on lune 19. 2012. Objective Category 0 Decent Housing © Suitable laving Environment ❑ Economic Opportunity Specific Objectives Outcome Categories 1 Improve quality increase quantity of public improvements for lower income persons ❑ Availability/Accessibility F] Affordability 2 -- - 3 _. 0 Sustainability 11 Public Facilities Proposed 1 ! Underway � Complete . . i t CL n L CL U I. a Proposed Outcome Performance Measure Actual Outcome Eliminate at least one condition CDBG to be used to improve street contributing to neighborhood surfaces that are 75% - 50% blight deteriorated 03I Flood Drain Improvements 570.201(c) __......... � � .. .......... _....... ......... N CDBG -V Proposed Amt. $ 130,000 Y i Actual Amount