Loading...
HomeMy WebLinkAbout- - Corp Yard Fire Damage Project No. 12-11 - 7/17/2012CITY COUNCIL AGENDA REPORT MEETING DATE: JULY 17, 2012 ITEM NUMBER: SUBJECT: CORPORATION YARD FIRE DAMAGE RESTORATION AT 2310 PLACENTIA AVENUE, COSTA MESA - CITY PROJECT NO. 12-11 DATE: JULY 5, 2012 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, INTERIM CITY ENGINEER, (714) 754-5335 RECOMMENDATION: Adopt plans, specifications, and working details for the Corporation Yard Fire Damage Restoration at 2310 Placentia Avenue, Costa Mesa, City Project No. 12-11. 2. Approve Budget Adjustment No. 13-003 (Attachment 1), in the amount of $177,699.00. 3. Award a construction contract to St. George Construction, Inc., 7839 Adwen Street, Downey, CA 90241, in the amount of $177,699.00 (base bid plus additive bid item No. A-1). 4. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: A portion of the vehicle and equipment storage area at the new Corporation Yard at 2310 Placentia Avenue was fire damaged on January 20, 2011. Since the fire incident, City staff has demolished the unsafe portions of the structure and hired consultants to provide the necessary structural calculations, construction drawings, and specifications necessary to obtain a building permit for the restoration of the facility. ANALYSIS: The scope of work for this project consists of rebuilding the fire -damaged storage facility, which includes the replacement of wood framing, roof trusses, metal roofing, concrete column, cement masonry block, chain link fence with entry gates, asphalt paving, stall markings and other tasks needed to complete the work required by the contract documents. The City Clerk received and opened ten (10) bids for this project on May 7, 2012. St. George Construction, Inc. was the apparent low bidder with a base bid proposal of $163,900.00. The Engineer's estimate was $270,000.00; and the average of the ten (10) base bids received for this project amounted to $226,129.30. An analysis of the bids indicates that the apparent low bidder submitted a bid proposal that is thirty-nine (39%) percent lower than the Engineer's estimate. The variance between the low bidder and the Engineer's estimate may be attributed to continued competitive conditions in the construction industry at this time. The Bid Abstract is included as Attachment "2". In addition to the base bid, the bidders were required to bid on an additive bid item, which was to be considered by the City subject to funding availability. Additive bid item No. A-1 is for the construction of site improvements including asphalt paving, striping, and curb stops. The incorporation of the additive bid item will result in a net increase to the contract of $13,799.00. Considering the low bid received for this work, and the overall project cost being below the Engineer's estimate, staff recommends the inclusion of this additive item of work. The license and references of St. George Construction, Inc. were checked and staff found them to be in good standing. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. If all the bids were rejected, the City would need to readvertise or to cancel the project. Staff believes that readvertising the project will not result in lower bids. FISCAL REVIEW: The City has already received payment for the claim for damages to the City Corporation Yard from its insurance policy with McLarens Young International. This payment was received into the Self Insurance Fund in the prior fiscal year. Therefore, the attached Budget Adjustment No. 13- 003 provides for the appropriation of $177,669.00 from undesignated fund balance in the Self Insurance Fund. LEGAL REVIEW: St. George Construction, Inc. has furnished the necessary bonds and insurance, which have been approved as to form by the City Attorney's Office. After the award and subsequent execution of the contract, a "Notice to Proceed" will be issued. CONCLUSION: The City has received bids for the Corporation Yard Fire Damage Restoration at 2310 Placentia Avenue, Costa Mesa, City Project No. 12-11. Staff has evaluated all of the bids and recommends that the City Council adopt the plans, specifications, and working details for said project; approve Budget Adjustment No. 13-003 in the amount of $177,699.00; award the contract to the apparent low bidder, St. George Construction, Inc., in the amount of $177,699.00 (base bid plus additive bid item No. A-1); and authorize the Mayor and the City Clerk to execute the Public Works Agreement. ERNESTO A01YNOZ Public Se es Director L"Otl-o� B BBYt*NCP Finance/IT Director 3 ,,� �, 3" - FARIBA FAZELI Interim City Engineer 2 ATTACHMENTS: "1" Budget Adjustment 13-003 "2" Bid Abstract DISTRIBUTION: Chief Executive Officer City Attorney City Clerk Director of Economic and Development, Deputy CEO Maintenance Services Manager Staff File 3 r F.. Z LU F, 6 U Q i r y O) V 7 0 t ,..I O � t1 � c 0 0 L Nv L Q d d R d � C Q d Z co 0 L c C 4= C v O L C� d = d C w _O 0 V +' i N C Q O � !LC 0 Q. N Of L L L w w tm � c c L d C F R N co co C O d F f6 2 = Q d O N O 0 Lu O E E ca o a CL o 0 Q a '� ) 42 a s L = ` 0 0 a a a W❑❑❑®❑ C C V C •� d � .rte. lC •L C E E (0 O m a co N a o d < LL 4 �L c�cca m c a O 7 c�oa aoi C (o C w a� a> "x o c C Lu is w W m o E '� O O O U .cc N W W LL LL U. L ❑ ❑ N E] El d cr d El i' N F- T V F - y O) N � n Of N C V► N N O 7 7 Q d cr d N Z Z 2 ❑ ❑ ❑ X A I . I . . . . I I I o a O cc LL > a`> > o a fl c CL m 16 ® o o Lo_ cc w ani C U C N ❑ r ❑ G ElO NG o CO r w Q t{f L Q L a a N C > > U 0 0 U)0 E M o 0 0 aCL Q o a V Q 0 U [:]V F1 c4 0 0 N c 0 L0 O f6 a 0 L a N m m LL co 40 0 W 1 CD v .t - w � ❑ o N N d � V R U N R m O N m a Q C � C C N R U. N N L d C d a p ca Z _ 3 SL m Ql N 0 -1-2 c .a ❑ 3 o v d .o N U `_ ` a o 0 wd 'c` o cc L cc N C co—: d m g 0 m n .o Q b M 7 � Q Z m Q o L t1 C d a ❑ i a co > a m > w O 7 � U U CL ,a 0).2 i^ oo m h N CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES STORAGE YARD FIRE DAMAGE REPLACEMENT CITY PROJECT NO. 12-11 BID OPENING DATE: MAY 7, 2012 BID OPENING RESULTS ATTACHMENT 2 Bidder City Base Bid Base Bid plus Additive Item A-1 1. ST. GEORGE CONSTRUCTION, INC. DOWNEY $163,900.00 $177,699.00 2. DE LA RIVA CONSTRUCTION, INC. FULLERTON $173,100.00 $189,900.00 3. ASTRA BUILDERS, INC. ANAHEIM $200,000.00 $290,000.00 4. TOUCHSTONE CONTRACTORS, INC. POMONA $202,500.00 $215,000.00 5. BETA GROUP, INC. WOODLAND HILLS $205,900.00 $226,200.00 6. AVAZ CONSTRUCTION, INC. WOODLAND HILLS $219,640.00 $237,840.00 7. CALIFORNIA TOP CONSTRUCTION, IRVINE $236,500.00 $245,000.00 8. LATCO CONSTRUCTION, INC. SAN CLEMENTE $265,725.00 $265,725.00 9. NEWREAL, INC. UPLAND $287,028.00 $300,000.00 10. UNITED RIGGERS & ERECTORS, INC. WALNUT $307,000.00 $307,000.00 Average Engineer's Estimate: $ $ 226,129.30 270,000.00 $245,436.40 $290,000.00