HomeMy WebLinkAbout- - "Go Green Program" Permit Fee Waivers - 7/17/2012CITY COUNCIL AGENDA REPORT
MEETING DATE: JULY 17, 2012
ITEM NUMBER:
SUBJECT: "GO GREEN PROGRAM": PERMIT FEE WAIVERS FOR SOLAR SYSTEMS AND
ELECTRIC VEHICLE CHARGING STATIONS
DATE: JULY 9, 2012
FROM: PLANNING DIVISIONIDEVELOPMENT SERVICES DEPARTMENT
PRESENTATION BY: KEITH CLARKE, INTERIM CHIEF PLANS EXAMINER
FOR FURTHER INFORMATION CONTACT: CLAIRE FLYNN, AICP (714) 754-5278
claire.flynn@costamosaca.gov
RECOMMENDATION
Consider a variety of options, and direct staff to initiate the Go Green Program. (See
Table A for options).
BACKGROUND
In January 2012, Planning staff and the Building Official met with the Planning
Commission Vice Chair Sam Clark to explore incentives to promote energy
conversation. After discussing different approaches, it was decided to pursue a fee
waiver program for permits related to solar energy systems and electric vehicle
charging stations.
On April 8, 2012, Planning Commission considered various options for the Go Green
Program and directed staff to present different alternatives for City Council
consideration.
ANALYSIS
Solar Energy
Solar energy is a renewable energy source. An increasing number of residential and
commercial property owners are therefore making significant investments in solar
electric systems. Solar cells do not require much maintenance once brought up to their
maximum efficiency and are considered quiet collectors. Unlike other energy sources
they produce no noise, solar energy can be very reliable, and can last longer than most
other energy sources.
While the initial investment on solar system equipment can be expensive, long-term
savings and benefits are certainly possible and make the use of this system attractive.
Due to further and advanced improvements in solar energy technology, the equipment
costs have been reduced making solar energy more cost-effective to be utilized for the
average homeowner or small business.
The following table provides three different fee waiver/reduction options for Council
consideration:
Table A — Different Options to Structure the Go Green Program
Options (Select One)
Description of Savings
APPROXIMATE
Cost over 5 -month period
throughi 12)
A: 100% Fee Waiver
$340 for electrical and building
permits for residential solar
$2,000 per month
{"Exhibit A1" of Draft Resolution}
energy systems.
Or $10,000 over five-month period
$1,400 for electrical and
building permits for
commercial solar energy
systems.
$100 for electrical permits for
an electric vehicle charging
station.
6: 50% Discount Fee Program
$150 for electrical and building
permits for residential solar
$1,000 per month
("Exhibit A2" of Draft Resolution)
energy systems.
Or $5,000 over five-month period
$704 for electrical and building
permits for commercial solar
energy systems.
$54 for electrical permits for an
electric vehicle charging
station.
C. Maximum "Flat Cap" Program
Program is active until the
Max. $10,000
maximum limit for the fee
"Exhibit AY of Draft Resolution
reduction program is reached.
Note:
The fee waiver/reduction program would apply to both residential and nonresidential
(commercial/industrial) users and would be limited to one fee waiver/reduction per
residential household or business.
Electric Vehicle Charging Stations
Given uncertainty and volatility in gasoline prices, there is increased demand in owning
and operating electric -powered motor vehicles. Many vehicle owners find them
practical, affordable and economically sustainable in today's economy. Additionally,
green electric or electric -hybrid plug-in vehicles increase environmentally cleaner air,
and reduce the need for imported fossil fuels. These electrical vehicles can be
charged at home thru a standard wall outlet for very minimal cost per day. They can
also be charged at different networks of electric vehicle charging stations at major
shopping centers (South Coast Plaza) or governmental properties (City Halls, etc.).
"Go Green Program"
Subject to City Council direction, the proposed program could be effective for a six month
period as recommended by the Planning Commission, starting in August through the
December 15, 2012. Following is some key information:
• The City averages approximately 42 solar -related permits per year, or an
average of 4 per month.
* The peak period for issuing permits for solar systems is November and
December months because State rebate deadlines occur during the last
couple of months of each calendar year.
• The projected revenue loss of a 5 -month solar permit waiver program is
approximately a max. of $10,000, or approximately $2,000 per month.
• The City issues about 5 permits per year for electric vehicle charging
stations. The cost for these permits can vary greatly and are dependent
upon the type and number of charging stations. (please provide few
examples so that the Council can have an idea.
Options for a Fee Reduction I Fee Waiver Program
Planning Commission recommended approval of the Go Green Program in some form as
determined by Council. While the Planning Commission was supportive of the 100% Fee
Waiver Program, there was a preference expressed to keep the options open-ended,
subject to Council's approval.
r
After conducting preliminary research, staff is not aware of any grant program available
through the South Coast Air Quality Management District, Southern California Edison, or
StatelFederal that would offset the cost of the Go Green Program. Responses to survey
of surrounding Cities regarding any related waiver programs are pending at the time of
publication of this report and shall be provided at the hearing.
To implement the Go Green Program, The City Council must adopt the attached
resolution waiving or reducing the solar and electrical permit fees during the effective date
of the program: August 1 thorough December 31, 2012.
ALTERNATIVES
The City Council could consider other options with a different range of fee reductions
other than presented in this report. The Council could also decide to "receive and file" this
report.
FISCAL ANALYSIS
The fiscal analysis shall be provided by separate cover.
LEGAL ANALYSIS
The City Attorney's office has approved the attached resolution as to form.
CONCLUSION
Pursuant to the Planning Commission recommendation, the Go Green PrNram is to the
City Council for consideration.
OWW /-
CLAIRE FLYNN, AICP PETrK KA6HAVI
Asst. Development Se ces Director Director of Economi
Development/Deputy CEO
Attachments: 1. Resolution
Distribution: Chief Executive Officer
Assistant Chief Executive Officer
Director of Economic & Development7Deputy CEO
Public Services Director
City Attorney
Transportation Services Manager
City Engineer
City Clerk (9)
Staff (7)
File (2)
RESOLUTION NO. 12 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
COSTA MESA MODIFYING BUILDING AND ELECTRICAL
PERMIT FEES TO ESTABLISH A "GO GREEN" PROGRAM TO
PROMOTE SOLAR ENERGY SYSTEMS AND ELECTRICAL
VEHICLE CHARGING STATIONS IN RESIDENTIAL AND
NONRESIDENTIAL APPLICATIONS
THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY RESOLVE AS
FOLLOWS:
WHEREAS, Section 5-1 of Chapter 1, Title 5 of the Costa Mesa Municipal Code
authorizes the City Council to establish fees and fee schedules for permits relating to
the regulation of building and construction activities in the City of Costa Mesa;
WHEREAS, on July 17, 2012, the City Council conducted a public meeting to
consider a fee modification program and the fiscal implications of such a program;
WHEREAS, the City Council hereby desires to establish and promote a program
known as the "Go Green Program" for 2012 to encourage and facilitate the installation
of solar systems and electric vehicle charging stations in compliance with applicable
requirements of the Costa Mesa Building Codes and Development Ordinances, and to
reduce the costs of the building and electrical permit fees, for such work as described in
Section 1 and Exhibit A of this Resolution;
WHEREAS, the City Council hereby finds and determines that it is in the public's
interest and general welfare to establish the Go Green Program.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Costa
Mesa as follows:
1. Building/Electrical permit fees shall be collected and modified during the effective
period of the Go Green Program pursuant to the schedule described in Exhibit A
attached to this resolution.
2. The effective period of the Go Green Program shall apply to any completed
permit application received by or permits issued by the Building Safety Division
of the Development Services Department, on or after August 1, 2012, and the
effective period shall expire upon December 15, 2012.
BE IT FURTHER RESOLVED that, nothing contained in this Resolution shall be
deemed to waive any fees otherwise required by any other provision of law (including
but not limited to fees for City zoning entitlements, and/or fees collected by the City on
behalf of any other public agency or entity), nor otherwise waive compliance with any
other applicable provisions of the Costa Mesa Building Codes, Grading Ordinances,
Development Ordinances, or the Costa Mesa Zoning Code.
ATTEST:
PASSED AND ADOPTED this day of
2012.
ERIC BEVER
Mayor of the City of Costa Mesa
APPROVED AS TO FORM:
City Clerk of the City of Costa Mesa City Attorney
r'r
EXHIBIT Al
A: 100% Fee Waiver $300 for electrical and building
permits for residential solar $2,000 per month
("Exhibit A1" of Draft Resolution) energy systems.
or $10,000 over a five month period
$1,400 for electrical and
building permits for
commercial solar energy
systems.
$100 for electrical permits for
an electric vehicle charging
station.
Note:
The fee waiver program would apply to both residential and nonresidential
(commerciallindustdal) users. It would be limited to one fee waiver per residential
household or business.
Exhibit A2
Description
Description ,
Cost over onperiod
(August through December i
6: 50% Discount Fee Program
$150 for electrical and building
permits for residential solar
$1,000 per month
("Exhibit A2" of Draft Resolution)
energy systems.
Or $5,000 over a five-month period
$700 for electrical and building
permits for commercial solar
energy systems.
$50 for electrical permits for an
electric vehicle charging
station.
Note:
The fee waiver program would apply to both residential and nonresidential
(commercial/industrial) users. It would be limited to one fee waiver per residential
household or business.
q
C. Maximum "Flat Cap" Program
("Exhibit AT of Draft Resolution)
Note:
EXHIBIT A3
Program is active until the
maximum limit for the fee
reduction program is reached.
First come, First Served.
Max. $10,000
The fee waiver program would apply to both residential and nonresidential
(commercial/industrial) users. It would be limited to one fee waiver per residential
household or business.
1►
STATE OF CALIFORNIA)
)ss
COUNTY OF ORANGE )
I, , Deputy City Clerk and ex -officio Clerk of
the City Council of the City of Costa Mesa, hereby certify that the above foregoing
Resolution No. 12- as introduced and considered section by section at a regular
meeting of said City Council held on the day of , 212, and thereafter
passed and adopted as a whole at the regular meeting of said City Council held on the
day of , 2012, by the following roll call vote:
AYES:
NOES:
ABSENT:
IN WITNESS WHEREOF, I have hereby set my hand and affixed the Seal of the
City of Costa Mesa this day of , 2012.
Interim City Clerk
!c.