HomeMy WebLinkAbout08 - CC-5 - Attachment 3 - 2/18/2014ATTACHMENT 3 PROJ. CIP PROJECT NAME AND STATUS NO. 1 ANAHEIM/SUPERIOR STORM DRAIN AND STORMWATER MITIGATION PROJECT: This project consists of installation of Reinforced Concrete Box on Anaheim Avenue and Detention/Infiltration system at Lions Park. • Complete the construction documents and will advertise for construction by March 2014. 2 PACIFIC AVENUE AND CANYON DRIVE STREET IMPROVEMENT PROJECT: This project consists of reconstruction of damaged curb & gutter, sidewalks, driveways, cross gutters and mill and AC overlay. • This project is being advertised for construction • Begin construction in March 2014. 3 2013-2014 CITYWIDE STREET REHABILITATION: This project consists of mill & AC overlay and/or slurry seal application of the streets located within the Mesa North, Westside, Upper and Lower Bird tracks and area around the Trinity Church neighborhoods. • This project is being advertised for construction • Begin construction in March 2014. 4 2013-2014 CITYWIDE PARKWAY REPAIR AND NEW SIDEWALK CONSTRUCTION: This project consists of citywide removal and construction of damaged curb & gutter, sidewalks, driveways and cross gutters • This project is being advertised for construction. • Begin construction by January 2014. 5 2013-2014 CITYWIDE UNIMPROVED ALLEYS: This project consists of removal and replacement of the damaged pavement at several alleys • This project is being advertised for construction • Be in construction in March 2014. 6 2013-2014 CDBG STREET AND ALLEY IMPROVEMENT PROJECT: This project consists of rehabilitation of alleys and streets within the CDBG area. • This project is being advertised for construction • Be in construction in March 2014. 7 VICTORIA/VALLEY INTERSECTION IMPROVEMENTS: This project consists of reconstruction of the north leg of the intersection and traffic signal modifications. • A construction contract has been awarded. 8 WEST 19TH STREET IMPROVEMENTS: This project consists of construction of a right -turn lane into the Tower on 19th Street, pedestrian signal replacements, and street light modifications. This project is federally funded. • A construction contract has been awarded. 9 PARKING LOT REHABILITATION PROJECT: This project consists of rehabilitation of the following parking lots: 1. Vista Park parking lot 2. Balearic Center parking Lot 3. Canyon Park parking lot 4. Fire Station No. 5 parking lot • This project is being advertised for construction. ATTACHMENT 3 PROD. CIP PROJECT NAME AND STATUS NO. 10 DEL MAR AVENUE MEDIAN IMPROVEMENTS: This project consists of construction of a raised landscaped median on Del Mar Avenue just east of Newport Boulevard. • This project is in the design phase. 11 EAST 17TH STREET LANDSCAPE ENHANCEMENT: This project consists of construction of raised landscaped median on 17th Street from Santa Ana Avenue to Irvine Avenue and intersection widening at Tustin Avenue and 17th Street. • The construction contract has been awarded. 12 DOWNTOWN COSTA MESA GATEWAY LANDSCAPE IMPROVEMENT: This project consists of construction of a monument sign at the end of SR 55 FWY near 19th street and landscaped improvement at the median and the east side of the freeway. • The construction contract has been awarded.