Loading...
HomeMy WebLinkAbout- CC-4 - Attachment 2 - 3/4/2018CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF: 3rd Payment to: GRIGOLLA & SONS CONSTRUCTION CO., INC. P.O. BOX 949, AZUSA, CA 91702 01/17/14 PROJECT: REHABILITATION OF ALLEY NO. 10, ALLEY NO. 44, AND ALLEY NO. 104 City Project No. 13-03 DATE: 01/13/14 PAGE: 1 OF 1 ITEM BID UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 1 LS MOBILIZATION $6,000.00 100 % 0 % 100 % $6,000.00 $0.00 $6,000.00 $6,000.00 2 28000 SF SAWCUT & REMOVE EXISTING AND CONSTRUCT 6 -INCH $6.00 26,883 SF 15 SF 26,898 SF $161,298.00 $90.00 $161,388.00 $168,000.00 THICK PCC PAVEMENT FOR ALLEY NOS. 010 & 104 3 30000 SF SAWCUT & REMOVE EXISTING AND CONSTRUCT 7 -INCH $6.50 28,615 SF 1,776 SF 30,391 SF $185,997.50 $11,544.00 $197,541.50 $195,000.00 THICK PCC PAVEMENT FOR ALLEY NO. 044 4 120 TN SAWCUT AND REMOVE EXISTING AND CONSTRUCT AC $425.00 0 TN 130 TN 130 TN $0.00 $55,250.00 $55,250.00 $51,000.00 SLOT PAVE 5 670 SF SAWCUT AND REMOVE EXISTING AND CONSTRUCT 6" $10.00 652 SF 5 SF 657 SF $6,520.00 $50.00 $6,570.00 $6,700.00 PCC ALLEY APPROACH 6 70 LF SAWCUT AND REMOVE EXISTING AND COSNTRUCT 8" $36.00 63 LF 63 LF 126 LF $2,268.00 $2,268.00 $4,536.00 $2,520.00 CURB AND GUTTER 7 10 LF SAWCUT AND REMOVE EXISTING AND CONSTRUCT 18- $20.00 0 LF 0 LF 0 LF $0.00 $0.00 $0.00 $200.00 INCH CURB 8 1400 LF CONSTRUCT 3" PCC FOUNDATION CURB $9.00 0 LF 0 LF 0 LF $0.00 $0.00 $0.00 $12,600.00 9 825 SF SAWCUT AND REMOVE EXISTING AND CONSTRUCT 4" $7,00 557 SF 52 SF 609 SF $3,899.00 $364.00 $4,263.00 $5,775.00 THICK PCC SIDEWALK 10 410 SF CONSTRUCT 6" PCC DRIEVWAY APPROACH $10.00 235 SF 0 SF 1 235 SF $2,350.00 $0.00 $2,350.00 $4,100.00 11 1 EA ADJUST MANHOLE TO FINISHED GRADE. $150.00 1 EA 0 EA 1 EA $150.00 $0.00 $150.00 $150.00 12 3 EA ADJUST WATER VALVE LID AND CAN TO FINISHED $100.00 4 EA 0 EA 4 EA $400.00 $0.00 $400.00 $300.00 GRADE. 13 7 EA ADJUST PULL BOX OR UTILITY VAULT LID TO FINISHED $100.00 6 EA 0 EA 6 EA $600.00 $0.00 $600.00 $700.00 GRADE. 14 4 EA RE-ESTABLISH EXISTING SURVEY MONUMENT $1,500.00 0 EA 4 EA 4 EA $0.00 $6,000.00 $6,000.00 $6,000.00 15 1 LS SIGNING AND STRIPING $3,000.00 67 % 33 % 100 % $2,010.00 $990.00 $3,000.00 $3,000.00 16 1 LS TRAFFIC CONTROL $3,000.00 67 % 33 % 100 % $2,010.00 $990.00 $3,000.00 $3,000.00 17 1 FA PROJECT MANAGEMENT 25 000.00 0 FA 0 FA 0 FA $0.00 $0.00 10.00 $25,000.00 PROJECT TOTAL: $373,502.50 $77,546.00 $451,048.50 $490,045.00 SRI