HomeMy WebLinkAbout05 - CC-4 - Attachment 1 - 4/15/2014W CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 3/24/14 DATE: 03/17/14 6th Payment to: C.J. Concrete Construction, Inc. 10142 Shoemaker Ave. Santa Fe Springs, CA 90670 PROJECT: PARKWAY CONCRETE REPAIR PROJECT (AREA 29) City Project No. 12-21 PAGE: 1 OF 1 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1,900 LF Remove and Reconstruct Curb and Gutter (C-6) $38.00 1,395.0 LF 293.0 LF 1,688.0 LF $53,010.00 $11,134.00 $64,144.00 $72,200.00 2 10,500 LF Remove and Reconstruct Curb and Gutter (C-8) $35.00 8,780.0 LF 127.0 LF 8,907.0 LF $307,300.00 $4,445.00 $311,745.00 $367,500.00 3 3,500 SF Concrete Sidewalk $6.00 11,519.0 SF 140.0 SF 11,659.0 SF $69,114.00 $840.00 $69,954.00 $21,000.00 4 18,000 SF Concrete Driveway/DrivewayApproach $7.00 14,314.0 SF 322.0 SF 14,636.0 SF $100,198.00 $2,254.00 $102,452.00 $126,000.00 5 100 TON Miscellaneous AC Pavement $120.00 100.0 TON 0.0 TON 100.0 TON $12,000.00 $0.00 $12,000.00 $12,000.00 6 1,200 LF Paint Curb Red $10.00 1,966.0 LF 0.0 LF 1,966.0 LF $19,660.00 $0.00 $19,660.00 $12,000.00 7 14,000 SF Concrete X -Gutter, Spandrel, Loc. Depr. and Concrete Pad $12.501 11,115 SF 0 SF 11,115 SF $138,932.50 $0.00 $138,932.50 $175,000.00 8 1 FA Project Management $10,000.00 1.00 FA 0.0 FA 1 FA $10,000.00 $0.00 $10,000.00 $10,000.00 A 6,000 SF Remove Existing Concrete Sidewalk and Construct New Concrete Sidewalk 6 inches Thick over Compacted Native Soil $8,00 12,742 SF 0 SF 12,742 SF $101,936.00 $0.00 $101,936.00 $48,000.00 B 887 SF Colored 4" Sidewalk (South Coast Plaza Area: Anton Blvd., Park Center. and Town Center Dr. $10.00 0 SF 887 SF 887 SF $0.00 $8,870.00 $8,870.00 C 41 LF Colored 8" Curb & Gutter (South Coast Plaza Area: Anton Blvd. Park enter, and Town Center r. $50.00 0 LF 41 LF 41 LF $0.00 $2,050.00 $2,050.00 TOTAL: $812,160.601 $29,593.001 $841,743.50 $843,700.00