CITY OF COSTA MESA
FOR PAYMENT ON THE WARRANT LIST OF 3/24/14 DATE: 03/17/14
6th Payment to: C.J. Concrete Construction, Inc.
10142 Shoemaker Ave. Santa Fe Springs, CA 90670
PROJECT: PARKWAY CONCRETE REPAIR PROJECT (AREA 29)
City Project No. 12-21
PAGE: 1 OF 1
ITEM
NO
BID
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
1,900
LF
Remove and Reconstruct Curb and Gutter (C-6)
$38.00
1,395.0
LF
293.0
LF
1,688.0
LF
$53,010.00
$11,134.00
$64,144.00
$72,200.00
2
10,500
LF
Remove and Reconstruct Curb and Gutter (C-8)
$35.00
8,780.0
LF
127.0
LF
8,907.0
LF
$307,300.00
$4,445.00
$311,745.00
$367,500.00
3
3,500
SF
Concrete Sidewalk
$6.00
11,519.0
SF
140.0
SF
11,659.0
SF
$69,114.00
$840.00
$69,954.00
$21,000.00
4
18,000
SF
Concrete Driveway/DrivewayApproach
$7.00
14,314.0
SF
322.0
SF
14,636.0
SF
$100,198.00
$2,254.00
$102,452.00
$126,000.00
5
100
TON Miscellaneous AC Pavement
$120.00
100.0 TON
0.0 TON
100.0 TON
$12,000.00
$0.00
$12,000.00
$12,000.00
6
1,200
LF
Paint Curb Red
$10.00
1,966.0
LF
0.0
LF
1,966.0
LF
$19,660.00
$0.00
$19,660.00
$12,000.00
7
14,000
SF
Concrete X -Gutter, Spandrel, Loc. Depr. and Concrete Pad
$12.501
11,115
SF
0
SF
11,115
SF
$138,932.50
$0.00
$138,932.50
$175,000.00
8
1
FA
Project Management
$10,000.00
1.00
FA
0.0
FA
1
FA
$10,000.00
$0.00
$10,000.00
$10,000.00
A
6,000
SF
Remove Existing Concrete Sidewalk and Construct New
Concrete Sidewalk 6 inches Thick over Compacted Native Soil
$8,00
12,742
SF
0
SF
12,742
SF
$101,936.00
$0.00
$101,936.00
$48,000.00
B
887
SF
Colored 4" Sidewalk (South Coast Plaza Area: Anton Blvd.,
Park Center. and Town Center Dr.
$10.00
0
SF
887
SF
887
SF
$0.00
$8,870.00
$8,870.00
C
41
LF
Colored 8" Curb & Gutter (South Coast Plaza Area: Anton
Blvd. Park enter, and Town Center r.
$50.00
0
LF
41
LF
41
LF
$0.00
$2,050.00
$2,050.00
TOTAL:
$812,160.601
$29,593.001
$841,743.50
$843,700.00