Loading...
HomeMy WebLinkAbout53 - PH-2 - Attachment 8 - 4/15/2014ATTACHMENT S MARCH 24, 2014 PLANNING COMMISSION STAFF REPORT AND ATTACHMENTS -- � 0-3:- PLANNING COMMISSION AGENDA REPORT MEETING DATE: MARCH 24, 2014 ITEM NUMBER: nW3 SUBJECT: 125 EAST BAKER STREET APARTMENT PROJECT: FINAL EIR (STATE CLEARINGHOUSE # 2013081051); GENERAL PLAN AMENDMENT GP -13-02; REZONE R-13-02; ZONING CODE AMENDMENT CO -13-02; AND MASTER PLAN PA -13-11 125 EAST BAKER STREET FROM: PLANNING DIVISION/DEVELOPMENT SERVICES DEPARTMENT PRESENTATION BY: MEL LEE, SENIOR PLANNER DATE: MARCH 13, 2014 FOR FURTHER INFORMATION CONTACT: MEL LEE, AICP (714) 754-5611 mel.1ee(ftosta mesaca.aov DESCRIPTION The proposed project is a five -story, 240 -unit apartment complex (63 -foot maximum height proposed) at a density of 58 dwelling units (du's) per acre with a six -story parking structure (57 -foot maximum height proposed) with 457 parking spaces and four outdoor on -grade parking spaces, along with the following specific entitlements: 1. General Plan Amendment GP -13-42. Change the land use designation of the 4.17 - acre development site from Industrial Park to High Density Residential. In addition to the change in land use designation, the general plan amendment also involves text amendment(s) to the City's General Plan to reflect a site-specific density of 58 dwelling units per acre, and a site-specific height of six stories. 2. Rezone R-13-02. A rezone (or change) of the zoning classification of the 4.17 -acre development site from Commercial Limited (CL) to Planned Development Residential — High Density (PDR -HD). 3. Zoning Code Amendment CO -13-02. A zoning ordinance to amend Costa Mesa Municipal Code Title 13 for a site-specific density of 58 dwelling units per acre. The site is proposed to be designated PDR -HD (Planned Development Residential -High Density) in the City's Zoning Code. The designation allows up to 20 dwelling units per acre, or 83 dwelling units maximum for the site. The proposed 240 -unit project would require an amendment to Table 13-58 (Planned Development Standards) to allow a site-specific density of 58 dwelling units per acre for this project. 4. Master Plan PA -13-11. A Master Plan application for the proposed development of a five -story 240 -unit residential apartment building (63 feet overall height) that wraps around a six -story parking structure (57 feet overall height) with 457 parking spaces in the structure and four outdoor on -grade parking spaces with a deviation from: on- site parking spaces (538 parking spaces required; 461 parking spaces proposed). 5. Final Environmental Impact Report (State Clearinghouse #2013081051). Certification of the Final Environmental Impact Report (EIR) for the project. APPI IC_ANT Red Oak investments is the authorized agent for Nader Properties, the property owner. RECOMMENDATION That the Planning Commission adopt the attached resolutions recommending that the City Council take the following actions: 1. Certify the Final Environmental Impact Report for the project. 2. Approve by adoption of resolution General Plan Amendment GP -13-42. 3. Give first reading to the ordinance approving Rezone R -13-a2. 4. Give first reading to the ordinance approving Zoning Code Amendment CD -13-a2. 5. Approve by adoption of resolution Master Plan PA -13-11, subject to conditions of approval and the EIR Mitigation Monitoring and Reporting Program for the project. PLANNING APPLICATION SUMMARY Location: 125 East Baker Street Applications: Request: See first page of staff report. SUBJECT PROPERTY: GP-13-02IR-13-02! CO- 13-021PA-13-11 SURROUNDING PROPERTY: Zone: CL (Current); PDR -HD (Proposed) North: (Across Baker) MP, church and industrial uses General Plan: IP (Current); HDR (Proposed) South: Across Pullman MP, industrial uses Lot Dimensions: _- Irregular East: Across Pullman MP, industrial uses Lot Area: 181,415 SF (4.17 AC) West: CM 55 freeway off -ramp and drainage channel Existing Development: Two-story office building to be demolished Min. Private Open Space(Patio/Balcony) Min. 5 FT Dimensionl100 SF Min. 5 FT Dimension/100 SF 2 DEVELOPMENT STANDARD COMPARISON Based on Proposed PDR -HQ Zonin Development Standard Required/Allowed Proposed/Provided Lot Size: Lot Width N/A 340 FT Lot Area 43,564 SF 1 AC 181,415 SF 4.17 AC Density (High Densi Residential): Zone 20 du'sIAC $3 Units Max. 58 du'sIAC 240 Units Pro 1 General Plan 24 du's1AC 83 Units Max. 58 du'sIAC 240 Units Pro 1 Maximum Site Coverage Overall Project): Buildings NA NA Perimeter Open Space 20 FT Abutting Public ROW 20 FT Abutting Public ROW ❑ en Space(Total Site Area 42% 46.5% Min. Private Open Space(Patio/Balcony) Min. 5 FT Dimensionl100 SF Min. 5 FT Dimension/100 SF 2 Building Height: NA 5 Stories/63 FT (Apartments) (3) 6 Stories/57 FT (Parking Structure 3 Setbacks Overall Project): Front Baker Street NA 20 FT Side left -Pullman Street/right-55 F NA 20 FT/20 FT Rear NA NA On -Site Parking: 538 Spaces 457 Spaces (In Parking Structure) 4 Spaces (At Grade Open Parking) 461 Spaces Total 4 Driveway Width 16 FT Min. 25 FT NA = Not Applicable or No Requirement. (1) Site specific density requires General Plan Amendment and Zoning Code Amendment (see staff report discussion). (2) 100 SF requirement may be met through a combination of private balcony area and other deck areas in the common area, as long as the overall dimension of the balconyldeck is not less than 5 FT. (3) Site specific building height requires General Plan Amendment (see staff report discussion). 4 Reduction in number of on -sites aces requested see staff report discussion). CEQA Status Environmental Impact Report EIR Final Action City Council 101.(0— BACKGROUND Project SiteJEnvirons The project site is located at the southwest corner of Baker Street and Pullman Street. The site is approximately 4.17 -acres in size (181,415 square feet), is roughly triangular- shaped; and is currently occupied by a 66,600 -square -foot two-story office building constructed in 1974, a surface parking lot, signage, and landscaped areas within the parking area and around the perimeter of the site. The property is currently zoned CL (Commercial Limited) and has a General Plan Land Use Designation of Industrial Park (MP). The site is bounded to the north (across Baker Street) by buildings containing a church and various industrial uses zoned MP (Industrial Park), with a General Plan Land Use designation of Industrial Park; to the south and east (across Pullman Street) by various industrial buildings zoned MP (Industrial Park) with a General Plan Land Use designation of Industrial Park; and to the west by the off -ramp for the Costa Mesa Freeway (SR -55) and a drainage channel surrounded by chain link fencing. The site is also located approximately one-half mile to the west of John Wayne Airport (JWA). Project Proposal The proposed project involves replacing the existing office building and surface parking areas with an apartment building and parking structure as described above. The apartment units are comprised of studio, one -bedroom, two-bedroom, and three-bedroom units. A breakdown of the unit types are summarized in the table below: Studio & Lofts 1 Bedroom;& 2 Bedroom Lofts Lofts :3 Bedroom TOTAL 30 Units 107 Units 95 Units 8 Units 240 Units The building design and roof elements are modern style, i.e., characterized by simplified square and rectangular building forms with a variety of flat planes, projections, and recesses. The exterior consists of alternating stucco, smooth fiber cement panels with exposed attachments, and wood siding finishes. Additional accents include wood balcony rails and trellises, welded wire mesh grid systems that support the growth of landscape vines, and "caged rock" planters. The vehicular entrance to the parking structure is proposed to be provided from a single drive approach on Pullman Street. The project will include four outdoor on -grade parking spaces to serve the leasing office and 457 parking spaces provided within a six -level parking structure, which will also serve as a sound barrier to the adjacent freeway noise. Access to each residential level will be provided directly from each level of the parking structure and additionally by stairs and elevators throughout the development. The site plan includes private open space and courtyard areas that allow for circulation through the project while still maintaining a sense of privacy for the residents. The project also contains resident amenities that include a pool, a spa, a state-of-the-art cardio gym, a dog park, a roof top deck, a business center, community gardens, and a clubhouse. A detailed description of the project is provided in the Environmental Impact Report (EIR) prepared for the project, under separate cover. Continued Public Hearing The public hearing was continued from the February 24, 2014 meeting to March 24, 2014 to address minor changes to the design of the vehicle entries to the project from Pullman Street, which has been reviewed and approved by the Transportation Services Division and the Fire Department. The revisions do not change staffs recommendation for any of the proposed entitlements, or the conclusions or mitigation measures of the EIR prepared for the project. ANALYSIS General Plan Amendment GP -13-02 As noted earlier, a change in the land use designation of the 4.17 -acre development site from Industrial Park to High Density Residential is proposed to accommodate the development. The proposed General Plan Amendment GP -13-02 would amend the following sections of the Land Use Element as underlined and italicized below: LAND USE DESIGNATIONS High -Density Residential In 2494 General Plan Amendment GP -13-02 was approved, it consisted of a site- specific residential density increase for a 4.17 -acre site at 125 East Baker Street. The maximum density allowed is 58 units/acre which allows a maximum of 240 dwell units. Building Height The Zoning Code does not specify a maximum building height for the PDR -HD zone; however, a maximum building height of four stories for buildings south of the San Diego (I-405) Freeway is established as an objective and a policy in the General Plan Land Use Element (Objective LU -1 C and Policy LU -1 C.2). Because the subject property for the proposed development is south of the 1-405 Freeway, the four-story maximum height would apply to the project. The proposed revision to the General Pian objective/policy language is underlined and italicized below. Objective LUA C Promote land use patterns and development, which contribute to community and neighborhood identity. Policy LU -1C.2 Limit building height to four stories above grade south of the 1-405 Freeway, except for special purpose housing, such as elderly, affordable, or student housing. An exception is for the Newport Plaza property at 1901 Newport Boulevard where a six -level parking structure is allowed, and the property at 125 East Baker Street where a five - .r story, 240 -unit apartment building and six-sto parking structure are allowed (GP -13-02). Rezone R-13-02 A rezone (or change) of the zoning classification of the 4.17 -acre development site from Commercial Limited (CL) to Planned Development Residential — High Density (PDR - HD). The proposed rezone to PDR -HD would be consistent with the proposed High Density Residential General Plan designation for the project site. Zoning Code Amendment CC -13.02 A zoning ordinance to amend Costa Mesa Municipal Code Title 13 for a site-specific density of 58 dwelling units per acre would be required. The proposed 240 -unit project would require an amendment to Table 13-58 (Planned Development Standards) to allow a site-specific density of 58 dwelling units per acre for this project. The revised Table 13-58 is presented with changes as underlined and italicized below: Revised Table 13-58 (Planned Development Standards) Devefopmera PDR -LD POR -MD PDR -HD PAR -NCM PDC PDI slandRrd Maximum Density 8 12 20 35 20 per Section 13-59 Note: See North Note: The maximum MAXIMUM Costa Mesa Specific density for 1901 Newport DENSITY Plan for exceptions, Boulevard is 40 dwelling CRITERIA. units per acre. See North (dwelling units per Note: The maximum Costa Mesa Specific Plan acre) densV for 125 East for exceptions. Baker Street is 58 dwelling units per acre (Cd -13-02)_ Master Plan PA -13-99 As noted earlier, the Master Plan application is for the proposed development of a five - story 240 -unit residential apartment building (63 feet overall height) that wraps around a six -story parking structure (57 feet overall height) with 457 parking spaces in the parking structure and four outdoor on -grade parking spaces with a deviation from the following zoning code development standards: on-site parking spaces (538 parking spaces required; 461 parking spaces proposed). With regard to the master plan, staff notes the following: The pMLect features guality construction and materials. As noted earlier, the building design and roof elements reflect a modern style, i,e., characterized by simplified square and rectangular building forms with a variety of flat planes, projections, and recesses. The exterior consists of alternating stucco, smooth fiber cement panels with exposed attachments, and wood siding finishes. Additional accents include wood balcony rails and trellises, welded wire mesh grid systems that support the growth of landscape vines, and "caged rock" planters. The developer will also be required to contact the City's Transportation Services Division and the California Department of Transportation (Caltrans) to replace the chain link fence between the westerly property line and the drainage channel v -ditch with a combination wrought iron fence with pilaster supports or other fence/barrier acceptable to both the City and Caltrans, and landscape the area between the westerly property line and the v - ditch consistent with the abutting on-site landscape. The proposalprovides on-site amenities comparable with quality residential PMLects of this size and density. The proposed resident amenities include a 5,400 square -foot clubhouse, business center, and state-of-the-art cardio gym. Beyond the Clubhouse is over 12,223 square feet of landscaped courtyard with a pool, spa and related recreation areas. A separate more passive courtyard encompasses 5,385 square feet of additional common open space. Stretching along the western edge of the property is the 13,797 square foot "resident back yard", including a dog park, basketball courts, landscaped walkways and community gardens. The parking study prepared for the proiect, rather than strict application of the Parkin re uirements in the Zoning Code qaropriatelZ identifies the parking demand for this protect. A shared parking analysis was prepared for this project as a tool to identify peak parking demand. The parking study was prepared by Linscott, Law and Greenspan Engineers (LLG) and is included in the Transportation/Traffic section of the EIR. The study concludes that the parking will be sufficient to accommodate the proposed mix of units within this project based on the following. The project was compared with nine comparable sites in Costa Mesa, Irvine, Orange, Fullerton, Santa Ana, Monrovia, and Pasadena. This array of peak parking rates yields an average ratio of 1.33 spaces per unit, an 85th percentile ratio of 1.47 spaces per unit, and a maximum ratio of 1.75 spaces per unit (based on The Legacy multifamily residential project approved at 580 Anton Boulevard). The study estimates the project's parking needs based on the application of the average, 85th percentile, and maximum parking rates from the comparable sites mentioned above. For the 240 units proposed, it is estimated that the average parking demand would be 319 spaces, the 851h percentile demand would be 353 spaces, and the maximum demand would be 420 spaces. Comparing the maximum demand of 420 spaces against the proposed supply of 457 spaces in the structure yields a surplus of 37 spaces. The parking study has been reviewed by the City's Transportation Services Division, and they concur with the study methodology, suggested parking rates, and the consultant's conclusions regarding adequate parking. Staff is also recommending the following as a condition of approval: • A parking management plan shall be submitted to the Development Services Director and the Transportation Services Manager prior to final occupancy of the building. The parking management plan shall denote the following: o Method of allocation of assigned parking. o Location of visitor parking, including appropriate signage. o Location of security gates, if any, and how gates will be operated. o Location of employee parking. o Provide proof of a contract with a towing service to enforce the parking regulations if parking problems arise. The proiect has been designed to be compatible with the surrounding uses in the area and future apartment tenants will be notified of the existing uses in the vicinity of this rp oject• The project has been designed as a self-contained residential community with on-site amenities as discussed above. The architectural style of the building, with its clean modern lines, glass, wood and metal accents, is visually compatible with the architecture of the surrounding industrial area. A condition of approval has been incorporated requiring future tenants to be notified that there are surrounding industrial uses in the area, including but not limited to, operational characteristics such as hours of operation, delivery schedules, outdoor activities, noise, and odor generation. Additionally, future tenants will be notified of the existing airport in the vicinity of the project and the units will be designed with sound attenuation measures to mitigate any noise impacts. Number of Construction Jobs According to the applicant, the project will generate the following jobs: During Planning and Construction: • 166 temporary construction jobs over two years. • 15 temporary design professional jobs. Post Construction: ■ T permanent on site jobs, plus ancillary service jobs. John Wayne Airport (JWA) As noted earlier, the project site is located approximately one-half mile to the west of John Wayne Airport (JWA). The Federal Aviation Administration (FAA) issued a Determination of No Hazard To Air Navigation on May 16, 2613, which established a maximum building height of 111 feet above mean sea level (approximately 65 feet above ground level) for the proposed project. The Airport Land Use Commission for Orange County (ALUC), at their meeting of January 16, 2614, determined, on a 6-1 vote, that the proposed project was consistent with the Commission's Airport Environs Land Use Plan (AELUP) for John Wayne Airport (JWA) and the AELUP for Heliports, and recommended the following condition of approval, which has been incorporated into the draft resolution for PA -13-11: • Outdoor signage shall be provided informing the public of the presence of an operating airport for all designated outdoor common or recreational areas. If the proposed project should change significantly after the ALUC review, the proposed project must return to ALUC for another consistency determination. ENVIRONMENTAL DETERMINATION An Environmental Impact Report (EIR) has been prepared for the project in accordance with the California Environmental Quality Act (CEQA). In accordance with CEQA Guidelines Section 15987, the Draft Environmental Impact Report was made available for a 45 -day public review and comment period beginning on November 6, 2913, and remained available for comment until December 20, 2913. The Final EIR document can be found on the City's website at the below link: http:/A& ww.costa mesaca, gov/index. asr)x? page=151 Electronic copies can also be obtained on CD's from the Planning Division at no charge. Hardcopies are also available for review at the following locations: City of Costa Mesa Planning Division/Development Services Department 77 Fair Drive Costa Mesa, CA 92628 The Costa Mesa/Donald Dungan Library 1855 Park Avenue Costa Mesa, CA 92627 Mesa Verde Library 2969 Mesa Verde Drive East Costa Mesa, CA 92626 Response to Comments In total, twelve comment letters regarding the Draft EIR were received during the public review and comment period from five public agencies, one organization, and six individuals. Additionally, the Draft EIR was presented to the Planning Commission during their regularly scheduled meeting on December 9, 2913, and five speakers provided comments on the proposed project during the Planning Commission Meeting. The comments have been incorporated, where appropriate, in the Final EIR document. Brief Summary of Significant Environmental Impacts and Mitigation Measures Under CEQA, a "significant impact" represents a substantial or potentially substantial adverse physical change to the environment. In evaluating specific effects of the project on the environment, the EIR identifies thresholds of significance for each effect, evaluates the potential environmental change associated with each effect, and then characterizes the effects as impacts. With the implementation of the mitigation measures identified in the EIR for the proposed project, all potentially significant impacts have been reduced to less than significant levels, as briefly summarized in the table below: Summary of Significant Environmental Impacts Potentially Significant Level of Significance After Environmental Effects Mitigation Measure Summary (1) Mitigation Air Quality ■ Maintain equipment during construction Less than significant r Minimize dust during construction • Paint and building coatings to comply with air quality standards 0 Provide a sealed HVAC system for all units Hydrology/Water Duality ■ Provide a Water Quality Management Less than significant Plan WQMP Land Use/Planning ■ Notification to future residents of airport Less than significant in the vicinity of the project Noise . Comply with applicable noise attenuation Less than significant standards • Minimize noise impacts during construction TransportationfTraffic . Provide a traffic signal at Baker/Pullman Less than significant intersection • Provide street improvements at Red Hill/ Baker intersection ■ Payment of traffic impact fees • Provide adequate sight distance for vehicles at all project drive approaches (1) Refer to the Final EIR document for detailed descriptions of each mitigation measure. LEGAL REVIEW The Final EIR and draft resolutions have been reviewed and approved as to form by the City Attorney's Office. CONCLUSION With implementation of the mitigation measures identified in the EIR for the proposed project, all potentially significant impacts have been reduced to less than significant levels. With the implementation of the recommended conditions of approval, the proposed project will be compatible and harmonious with uses that exist within the general neighborhood. The project features quality construction and materials. The proposal provides on-site amenities expected of quality residential developments of this type. The parking study prepared for the project identifies that the parking demand is adequate for this project. The Airport Land Use Commission for Orange County (ALUC) determined that the proposed project was consistent with the Commission's Airport Environs Land Use Plan (AELUP) for John Wayne Airport (JWA). Therefore staff recommends that the Planning Commission approve a resolution recommending that the City Council certify the Final EIR Prepared for the promect and approval of the pro4ect sub'ect to Conditions of Approval and the Mitigation Monitoring and Reiporting Program. f6- ALTERNATIVES The Planning Commission has the following alternatives: 1. Continue the item to allow additional time for further analysis or revisions to the project. 2. Recommend City Council deny the project. If the City Council denies the project, the applicant could not submit substantially the same type f 'ppIication for six months. ze MEL LEE, AICP J G A , AICP Senior Planner Inter'R Ass' nt Director of Development Services Attachments: 1. Applicant's Project Description 2. Additional Correspondence from Public 3. Final EIR Mitigation Monitoring and Reporting Program 4. Draft Planning Commission Resolution for Final Certification 5. Draft Planning Commission Resolution for General Amendment 5. Draft Planning Commission Resolution for Rezone 7, Draft Planning Commission Resolution for Zoning Amendment 8. Draft Planning Commission Resolution for Master Plan 9. Maps and Plans 10. Final Environmental Impact Report (Under Separate Cover) Also Available on the City Website at hftp://www.costamesaca.gov/index,aspx?[)age=1 51 cc: Director of Economic & Development 1 Deputy CEO Sr. Deputy City Attorney Public Services Director City Engineer Transportation Services Manager Fire Protection Analyst Staff (4) File (2) SIV Plan Code Distribution List — Agencies and Persons Who Provided Comment on the Project EIR Red Oak Investments Attn: Joe Flanagan 2101 Business Center Drive, #230 Irvine, CA 92512 Nader Properties -1 IA- 3 Harbor Light Newport Beach, CA 92657 Atkins Attn: Trina S. Abbott 3570 Carmel Mountain Road, Suite 300 San Diego, CA, 92130 InFocus Consultants Attn: Peter Naghavi 418 Avenida Salvador San Clemente, CA 92672 - 15-- ATTACHMENT 1 APPLICANT'S PROJECT DESCRIPTION - I f.6r 125 Baker PROJECT DESCRIPTION The Project Applicant, Red Oak Investments LLC, proposes to construct 240 residential dwelling units within a five -story structure on the property known as 125 East Baker The properties are approximately 4.2 acres in size and is currently developed with a 60,000 square foot office building developed in 1974. The site is bounded by Pullman St. to the east, Baker St, to the North and the 55 Fwy access road to the west. The Applicant proposes to develop the 240 units in a combination of studio, one, two and three bedroom units. The site plan includes private open space and courtyard areas that allow for circulation through the Project while still maintaining a sense of privacy for the residents. The project also contains resident amenities that include a pool, a spa, a state- of-the-art cardio gym, a dog park, a roof top deck, a business center community gardens and a clubhouse. The Project will include 469 parking spaces provided within five levels in an above -grade covered parking structure, which will also serve as a sound barrier to the adjacent freeway noise. Access to each residential level will be provided directly from each level of the parking structure and additionally by stairs and elevators throughout the development. The Project would be accessible from two driveways located directly on Pullman. LA11616000.5 ATTACHMENT 2 ADDITIONAL CORRESPONDENCE FROM PUBLIC January 14, 2014 Honorable Mayor .lames Righeimer Honorable Mayor Pro Tens Stephen Mensinger Honorable City Council Members Planning; Commissioners and City Planning; Staff Cr ry of COSTA NIFSA 77 Fair Drive Costa Mesa CA 92626 Re: Multi Family Rezone 125 Baker Honorable Mayor, Trust all is well. I wanted to drop you a note and let you know that 1 had an opportunity to review the plans for Mr. Flanagan and lir. Wong for their residential project. We are in support of adding residential units in the sobecalairport area. I think it will create community and bring families to the neighborhood. I hope that their project gets approved. Thank you for your continued dedication to our city. Sinc Shaheen Sadeghi January 21, 2014 Honorable MayorJames Righeimer Honorable Mayor Pro Tem Stephen Mensinger Honorable City Council Members Planning Commissioners and City Planning Staff GTy of COSTA MESA 77 Fair Drive Costa Mesa CA 92626 Re: Multi Family Rezone —125 Baker Street Dear Honorable Mayor, City Council and Planning Commission: Burke Real Estate Group developed the North West corner of Baker Street and Redhill Avenue. This project was a conversion of one large industrial building (former Briggs Cunningham Auto Museum) into a 3 building modern office complex. Burke Real Estate Group also occupies this location with our Corporate Office. As a Business and property owner in chose proximity to the proposed property, I am in support of the proposed housing project at 125 Baker. This neighborhood while once a heavy manufacturing zone has been transitioning for decades away from strictly industrial uses. Today you will find a mix of uses. Office buildings continue to be developed in what were once industrial buildings, Churches coexist with schools and light industrial. Adding residential on the periphery seems to be a natural progression and should help alleviate business commute traffic. Sincerely, Brian R. Burke Eau F2KL REAL ESTATE GROUP 2613 E. BAKER STREET SUITE 106 COSTA Mesa, CA 92626 TCL: 71 4.924.6666 Fax: 718 4 6RII1 s■41V�` WWW.1+kJ�KF GROL p,N ET ()7) �A) watnllp tal?'� OC CHURCH January 29, 2014 Honorable Mayor James Righeimer 1-lonorable Mayor Pro Tem Stephen Mensinger flonorabie City Council Members Planning Commissioners and City Planning Staff City of Costa Mesa 77 Fair Drive Costa Mesa CA 92626 Sent via HSPS Re: Multi Family Rezone -125 Balser Street Dear Council and Commission: Watermark OC Church 3186 Pullman St., Costa Mesa, CA, 92626 P: 714.597,6000 F:714.597.6009 Watermark OC Church has the privilege of serving local schools, business, neighborhoods, and families within the 92626 and neighboring zip codes. Our church currently consists of around three hundred families and adults. We place a high value on our local community, both in partnering and serving our local community. We believe the Red Oak Housing proposal is a great way to add another unique aspect to the Redhill Zone, which already consists of businesses, schools, and churches. Watermark OC Church supports the rezone of this area and the development of this upscale housing project. Sincerely, Ptistorucky Dennis Lead Pastor of Watermark OC Church 4,dg4. el, AIRPORT LAND USE COMMISSION GRANGE COUM-Y FOR GRANGE COUNTY IN OR 3160 Airway Avenue • Costa Mesa, California 92626 • 949.252.5170 fax: 949.252.5178 January 29, 2014 Mel Lee, AICP Senior Planner City of Costa Mesa 77 Fair Drive P.O. Box 1200 Costa Mesa, CA 92628 Subject: City of Costa Mesa Baker Street Apartments Project (125 East Baker Street) Dear Mr. Lee: During the meeting held on January 16, 2014 the Airport Land Use Commission (ALUC) for Orange County considered the subject project. The matter was duty discussed, moved, seconded and carried by a 6 to 1 vote by the Commission to find the City of Costa Mesa's proposed Baker Street Apartments Project to be Consistent with the Commission's Airport Environs Land Use Plan (AEL UP) for John Wayne Airport (JWA) and with the AEL UP for Heliport's. The Consistency finding was as follows: The Commission found the proposed Baker Street Apartments Project consistent with the AEL UP for JWA and the AEL UP for Heliports as recommended by ALUC staff with the added condition that the City of Costa Mesa require outdoor signage informing the public of the presence of an operating airport for all designated outdoor common or recreational areas. If the proposed project should change significantly after this ALUC review, the proposed project must return to ALUC for another Consistency determination. Please contact ALUC staff at (949) 252-5123 or via email at Ichoumnocair.corn if you require additional information or have questions regarding this proceeding. Sincerely, r Kari A. Rigoni Executive Officer -122— EW POR T Real Estate Services, Inc Glen Allen Pr idemt February 3, 2014 Honorable Mayor James Righeimer Honorable Mayor Pro Tem Stephen Mensinger Honorable City Council Members Planning Commissioners and City Planning Staff CITY OF COSTA MESA 77 Fair Drive Costa Mesa CA 92626 11 , Sent via USPS RE: POTENTIAL MULTIFAMILY REZONE —SEC BAKER STREET/ NEWPORT (55) FWY Dear Sirs: I wanted to send this letter indicating my strong support for the referenced project. As a business owner in Costa Mesa, located near the subject property, I believe this development will provide much needed employee housing in our area. Our firm employs both senior level managers as well as administrative, accounting and support staff in our corporate facility located about a mile from the proposed project. We believe that this project will provide much needed attractive housing for our professional and administrative staff, particularly in the 20 to 40 year old age demographic that provides future business managers and leaders in Costa Mesa. As you know, the west airport area of Costa Mesa has experienced a dramatic conversion to higher skilled office workers, many of whore are in need of quality, affordable housing in a cutting edge, state-of-the- art architectural environment. Businesses such as mine need these discriminating younger emerging managers to fill our demand for higher skilled workers. New high-quality housing, particularly in Orange County, is a critical component to attracting and retaining these employees who will make current and future significant contributions to Costa Mesa. As importantly, as a real estate owner in this area, I truly believe that the conversion from the current use to the proposed use will be a net positive for property values in our arca by both enhancing the surrounding architecture as well as providing much needed rental housing stock. As both a property owner and business owner in the immediate area of the proposed project, we strongly support the proposed project and look forward to the opportunity to speak at both Planning Commission and City Council to further express the importance of this type of redevelopment for both our direct mixed use community as well as the greater City of Costa Mesa. Yours truly, NEWPORT REAL ESTATE SERVICES, INC. J Glen Allen President 0:INRES1Correspondence1125 Baker Costa Mesa 013014.docx 3184H Airway Avenue ■ Costa Mesa, CA 92626 ■ Tel: (714) 850-0085 ■ Fax: (714) 850-0086 ■ www.nres.net ■ Lic. 01342064 `123 PloneeR PROKIRG 11106 2430 SOUTH GRAND AVENUE * SANTA ASIA, CA 92-05 * (714) 544-9751 * t$Ufl) 528.6567 FAX (714) 428-0291 February 27.201 -1 I lonorab.le Ma\ or James Righeimer Honorable Mayor Pro 'Fem Stephen Mcnsinger 1 lcmorable Cita COUncil Members Planning Commissioners and City Planning Stall' CITY of COST: M E -SA 77 Fair Drive Costa Mesa CA 92626 Re: 125 Baker Street Dear Council and Commission: I have owned the building at 3030 Pullman. Pullman since 1978 1 have been patiently watching the neighborhood transition through the years. We have seen industrial buildings shirt to office buildings, schools and churches. These uses by all appearances coexist quite well. '1'he proposed addition of the residential prqiect at 125 Baker would complement most of the current uses in the area. The addition of residential is working well on the other side of the airport in Irvine so I see no reason that it can't be successful on "our side"` of the airport as well. IESr. '� PH -3 wamco March 12, 2014 Honorable Mayor .lames Righeimer Honorable Mayor Pro Tem Stephen Mensinger Honorable City Council Members Planning Commissioners and City Planning Staff CITY OF COSTA MESA 77 Fair Drive Costa Mesa CA 92525 Re: Multi Family Rezone — 125 Baker Street Dear Ionorable Mayor, City Council and Planning Commission: RH Matthews, LLC purchased 3128 Red Hill and 325 Baker in 2010 and we have invested heavily in both properties. After extensive renovation of these properties we moved our aerospace lighting business (Wamco) into 3128 Red Hill and leased 325 Baker to Fox Rent A Car. As a Business and property owner in close proximity to the proposed property, I am in support of the housing project at 125 Baker. This project is a good addition to the neighborhood and should help create jobs, boost the property tax rolls and boost the property values of the entire neighborhood. Some of my own employees are excited at the possibility of housing within walking distance from work. As a live long resident of Costa mesa/Newport Beach I have seen a lot change over the years. This area was once all industrial and now with churches and schools have moved in. We now have more of a community feel to the neighborhood and I believe this housing project will be a good addition to the area. Sincerely, Greg Matthews Executive Vice President 3128 Red Hill Avenue 714-545-5560 www.wamcoinc.com Costa Mesa, CA 92626 714-545-6093 fax info@wameoinc.com P4-3 December 3, 20113 City of Costa Mesa Honorable Mayor Jim Righeimer Honorable Mayor Pro Tem Stephen Mensinger Honorable City Council Members Planning Commissioners and City Planning Staff 77 Pair Drive Costa Mesa, CA 92626 Subject: Baker Street Apartments- Red Oak Development As President and Partner of Slater Builders Inc. located at 3100 Pullman Street, I feel it pertinent that I write to you regarding the above referenced development proposal. In the almost 20 years that our company has been located in the Redhill area we have seen the slow progression of new office conversion from the original light manufacturing that existed in the `60s and '70s. This transition has trended along with other areas of Costa Mesa i.e. the Westside area of 171'' Street and Placentia. Our current building at 3100 Pullman was once light manufacturing and we converted it for Trico Realty to an office use. Along with this change has come the off business hour use of buildings for religious purposes. There are five religious organizations now occupying buildings in the Redhill zone. The Red Oak proposal for upscale housing apartments will be a compatible fit for the area as it will compliment the existing office and religious uses. One does not have to venture far to find live/work uses in numerous parts of Orange County. The proposed project is on an isolated piece of property which is well suited for residential use. There are ample support services in the immediate neighborhood on Bristol and Baker as well as at Bristol and Redhill. Our Company has looked with numerous developers at adjacent properties for retail use which would support a residential project. The current office building is very out dated and not desirable in the current market as an office complex. The conversion of the use to residential would have a definite tax increase for the city and be a significant benefit to the Redhill area. I fully support the change in use and the proposed development by Red Oak Investments. Sincerely, Bill Dunlap President S L T f fl B U i L D F 3100-B Pullman Street, Costa Mesa, CA 92526 Tel; [714] 434-4887 Fax: (714) 434-5173 www.slaterbuilders.com License #575832 —126— PR -3 December 6, 2013 Mel Lee City of Costa Mesa, Planning Division 77 Fair Drive Costa Mesa, CA 92628 RE: 125 East Baker Street Apartments Dear Mr. Lee, Trico Realty, Inc. is in favor of the proposed High Density Residential Development at 125 East Baker Street Costa Mesa, CA 92626. We agree with the City of Costa Mesa's Environmental Impact Report stating that the proposed project will not have significant impacts on visual character, construction, or other aspects relating to the enjoyment of the immediate vicinity of the proposed project as a working environment. With this being said, a traffic study has indicated that the proposed project will have a very significant impact c congestion on Pullman Street near and at its intersection with Baker Street. Trico Realty strongly endorses the installation of traffic signals at the intersection of Pullman and Baker. We believe that if the city intends to approve a high density residential project at an already congested intersection, it has an indisputable obligation to mitigate current and future congestion. Sincerely, Mike Harrison Vice President and CFO Alex Remo Property Manager Brokerage / Development 1 Management 3100-A Pullman Street, Costa Mesa, CA 92626 (714} 751-4420 Fax(714)540-4579 www.tricoreal!y.com DFfELD.00342120 T WexU31206 125 E Baker E I R Comments.dou Real Tech ❑ecember 9, 2013 IIonorable Mayor James Righeimer I lonorable Mayor Pro Tem Stephen Mensinger I lonorable City Council Members Planning Commissioners and City Planning Staff CITY OF COSTA MF SA 77 Fair Drive Costa Mesa CA 92625 Sent via USPS Re: Potential Multi Family Rezone — SEC Raker Street/ Newport (55) Freeway To Whom It May Concern: My firm recently purchased and completely remodeled our building at 3199 L Airport Loop I7rive; we relocated our office from Dove Street in Newport Beach. Our new building, previously consisting of warehouse and storefront, is now predominantly office. We believe that we have upgraded our offices significantly and have added value for our neighbors in Costa Mesa. The recent repaving of Redhill was another well needed improvement to the west -side of John Wayne Airport. It has come to our attention that the 125 Baker Street building desires a rezone to multi- family residential units instead of office space. My firm and I applaud the concept and fully support the rezone. The current office building is functionally obsolete; in order to bring the building to current office leasing standards, the building would need to be demolished; eurrent economics will not aIIow that, so the building will attract low, or no, rent paying tenants and will slowly depreciate into a bigger eyesore. Irvine has integratcd residential into the Business Complex frequently with success; retail uses have followed, making the community much more vibrant due its mixed use nature. Newport Beach has also allowed residential to be developed in Koll Center Newport. It makes total sense to have residential closer to the work place. Mariner's Church School, Rock Harbor Church, the trampoline center on Airway, the bike store on Airway, alt uses that have made the West side of the Airport a more attractive and interesting environment. Multi- family residential will enhance the trend. Sincerely, ]RFA 1, i,5'rATF: & LOG is ics Tt:Ci1NOLOGY, INC. Kim Josephson Kim Josephson kjosephson(Preai-techinc,corn 657.2107 5551 5199 Airport Loop Drive, Bidg E, Costa Mesa, CA 92626 DRE License No, 712155 126 PR,3 >IV Aviation S&rviC s, /17 C_ December 12, 241.3 Honorable Mayor .Tames Righeimer Honorable Mayor Pro Tern Stephen Mensinger Honorable City Council Members NRnni.ng Commissioners and C:ity.PIanning Staff CITY €lF Cos•rA MESA 77 lair Drive Costa Mesa CA 92626 Sent via USPS Re: Multi Family Rezone — 125 Baker Street Dear Council and Conauissi.on: N-3 Leading Edge Avlatlon Services 3432 Airway Avenue Costa Mesa, Califomia 92525 P: 714.555.0575 F- 714.556.4023 Leading Edge Aviation Services is headquartered in. Costa Mesa and employs over 1000 employees locally and across the country. As a contractor to companies such as Boeing Company, United Airlines, American Airlines, et at the company has a vested interest in local develtfpnieat in Costa Mesa to support job growth, econoinic growth and improvements in infrastructure:, particularly as it relates to roads, commercial and residential properties. In fact, Leading f:dge has and continues to invest in Costa Mesa and last ycar completed its new corporate headquarters located on Ainvay Avenue just down the street horn 12.5 Baker. As a business owner, investor and resident of the area I have witnessed firsthand the evolution of the surrounding area from heavy manufacturing to lite manufacturing, retail, professional services as well as the Schools and Churches that have contributed to a diverse doinographic blend. The area, while once an industrial area has slowly over tirne become an eclectic mix of uses. This progression in the local area Icuds itself to the addition of high-end apartment housing as a perfect complement to the current mix of businesses. From Segerstrom Performing Acts Center, South Coast Plaza and Metro Pointe to Triangle Square and East 17`i' Street Promenade, the business -friendly Costa Mesa reflects .this unique confluence of business/retail and residential. The Red Oak Housing proposal is a statural extension of the "Costa Mesa Advantage" in the Redhill Zone. l..eadirig ledge Aviation Services offers 100% support f'or the rezone of this area and the development of this upscale housing project. Sincerely, W. Michael Manclark Chairman and FALL zder Expert. Innovative. Consistent. T— 129, P4..3 February 28, 2014 Honorable Mayor James Righeimer I ionorable Mayor Pro Tem Stephen Mensinger Ilonorable City Council Members Planning Commissioners and City Planning Staff CI TV OF COSTA MESA 77 fair Drive Costa Mesa CA 92625 Re: Red Oak Project at 125 Baker Dear City leaders: As a significant property owner and operator in the area, I support the idea of adding residential uses in and around the airport. My family business has been located in this area for over 30 years and we have witnessed the neighborhood transformation first hand. Residential uses are already prominent in the vicinity and should be encouraged. The location ]ends itself'to a multifamily development as it is close to jobs, amenities and transportation. The immediate neighborhood is already a mix of eclectic uses and this development will only add to a vibrant district. In addition, l Relieve it will add to my land value and that of the surrounding property owners. Southern California has been successfully integrating residential uses in and around commercial/industrial uses for decades and it is great to see Costa Mesa adapting to a regional trend. Joe Flanagan of Red Oak Investments took an hour at my office to personally walk me through his proposed development and answer my questions. So, I have reviewed the concept with the developer and have every confidence that this will be an extremely successful deal giving the consumer an opportunity to live a lifestyle that is not widely available today. Sincerely, Jim Warmington, Jr. I President & CEO `f'he Warmington group 3090 Pullman Street I Costa Mesa. CA 92626 I snow,. Amhl March 11), -2014 M a< or and Cil N, Comic iI Memhers Pla:inim! C =r milssioners l lat rtirt€. 11�1,;.rr�r r;t. - Attention list€[ I..c�: ilSS. d Musu CA 4`6_10 Ilk?: The Baker Stmet inject by Red flak Investments Dena I.1onorahlc Mayor, C.;itti CoUnCri, Pl3n1iir3 CElMMiSSiOri afid k1el ( w,ocar oper'aws As luxury car business in the Cite' '!IC"'a. sevcr,ll hlocl;� away from the 240 -unit IUXL rV NsidCratial project proposCd l=�, lied Oak Iaveslmerats tin Baker St reel., I �t .Q t t ,�jm! ct, l fie pre �J xi cl f sgreat am :1w millions that will b invested t: wr� , i x d maks the area even beiter i he, area already has � wixttsre of ir_ws. I -lie prrrject w'111 �-rd(i to Lht� mix in a € ood way. It ig a twod Complement to Rock Fkirf-ror- Chu ch. Watermark C Mire(, l.yon Mtzscum, *vlarit cvr tichoo1. Eu rocar and a.II the olTicc buiIdings arr=und. Sir�Cerol�. � jeOOO Ree HIL -L- , COSTA M'E i , CA 0 '"S�=_?O 13�— ATTACHMENT 3 FINAL EIR MITIGATION MONITORING AND REPORTING PROGRAM CHAPTER 11 Mifigalion Monitoring and Reporting Program SECTION 11.4 Mltigafion Monitoring and Reporting Progrom Matrix Table 11-1 Mitigation Monitoring and Reporting Program Matrix Final EIR February 2014 Responsible Compliance VerficaHor? Agency) Mltigatlon Measure Action Required Monitoring Phase Party I Initial Date Comments AIR QUALITY MM4.2-1 The Applicant shall require by contract specifications that construction equipment engines be maintained in good condition and in proper tune per manufacturer's specification for the duration of construction. Contract specifications shall be included in project construction documents, which shall be reviewed by the City of Costa Mesa prior to issuance of a grading permit. Construction document specifications Prior to issuance of building permit; during construction City Planning; SCAQMD MM4.2-2 The Applicant shall require by contract specifications that construction operations Construction document Prior to issuance City Planning; rely on the electricity infrastructure surrounding the construction site rather than electrical specifications of building permit; SCAQMD generators powered by internal combustion engines. Contract specifications shall be included during construction in project construction documents, which shall be reviewed by the City of Costa Mesa prior to issuance of a grading permit. MM4.2.3 As required by South Coast Air Quality Management District Rule 403—Fugitive Construction document Prior to issuance City Planning; Dust, all construction activities that are capable of generating fugitive dust are required to specifications of building permit; SCAQMD implement dust control measures during each phase of project development to reduce the during construction amount of particulate matter entrained in the ambient air. These measures include the followi ng: ■ Application of soil stabilizers to inactive construction areas • Quick replacement of ground cover in disturbed areas. If disturbed graded areas remain inactive for greater than 4 days, nontoxic soil stabilizers shall be applied. in Watering of exposed surfaces two times daily ■ Watering of all unpaved haul roads two times daily ■ Covering all stock piles with tarp ■ Reduction of vehicle speed on unpaved roads ■ Post signs on site limiting traffic to 15 miles per hour or less ■ Sweep streets adjacent to the project site at the end of the day if visible soil material is carried over to adjacent roads • Cover or have water applied to the exposed surface of all trucks hauling dirt, sand, soil, or other loose materials prior to leaving the site to prevent dust from impacting the surrounding areas rr Install wheel washers where vehicles enter and exit unpaved roads onto paved roads to wash off trucks and any equipment leaving the site each trip 125 East Baker Streel Apartment Project EIR SCH No. 2013081051 11-2 City of Costa Mesa Red Oak Investments. LLC Final EIR February 2014 Table 11-1 Mitigation Monitoring and Reporting Program Matrix CHAPTER 11 Mitigation Monitoring and Reporting Program SECTION 11.4 Mifigallon Monitoring and Reporting Program Matrix HYDROLOGYIWATER QUALITY MM 4.4-1 The project applicant shall finalize the drainage plan and prepare a project Water Finalize drainage plan, Prior to issuance Responsible Compliance Vetftodon Quality Management Plan (WQMP) conforming to Orange County DAMP requirements. The Agency] of building permit; Orange, City of IMgafloh moos me Action Required Monitoring Phase PCNty frdlral bate Comments MM4.2-4 The Applicant shall require by contract specifications that construction -related Construction document Prior to issuance City Planning; Department of equipment, including heavy-duty equipment, motor vehicles, and portable equipment, shall be specifications of building permit; SCAQMD Public Works turned off when not in use for more than 5 minutes. Diesel -fueled commercial motor vehicles during construction with gross vehicular weight ratings of greater than 10,000 pounds shall be turned off when components of the drainage plan and WQMP BMPs have been installed. not in use for more than S minutes. Contract specifications shall be included in the proposed project construction documents, which shall be approved by the City of Costa Mesa. MM4.2-5 The Applicant shall require by contract specifications that the architectural coating Construction document Prior to issuance City Planning; (paint and primer) products used have a VOG rating of 190 grams per liter or less, for all specifications of building permit; SCAQMD exterior and interior nonresidential land use architectural coating. As per SCAQMD during construction regulations, architectural coaling for residential land -uses shall not exceed 50 glliter interior or 100 glliter exterior. Contract specifications shall be included in the proposed project construction documents, which shall be approved by the City of Costa Mesa. MM4.2-6 Install a sealed HVAC system in conjunction with MERVE 13 or higher rated finers Installation of a sealed Prior to issuance City Planning; for all residential development within the project site. The sealed air system will be designed HVAC system in of building permit; SCAQMD so that all ambient air introduced into the interior living space would be filtered through conjunction with MERVE 13 during construction MERVE 13 or higher rated filters to remove DPM and other particulate matter. The MERVE or higher rated filters for all 13 or higher rated filter is designed to remove approximately 74 percent of particulates of 3 residential development microns or larger in size from the ambient air that is introduced to the system (NAFA 1999), within the project site As a conservative estimate of reductions, it is assumed that the residents are indoors up to 78 percent of the time (US DOL 2010). Therefore, a reduction of 58.75 percent of particulate matter is anticipated with respect to this measure. MM4.2.7 Install all HVAC system air intakes as far from SR 55 as possible. This will further Installation of HVAC Prior to issuance City Planning; reduce risk for all interior spaces to the risk where the HVAC air intake is placed, systems as from SR 55 as of building permit; SCAQMD possible during construction HYDROLOGYIWATER QUALITY MM 4.4-1 The project applicant shall finalize the drainage plan and prepare a project Water Finalize drainage plan, Prior to issuance County of Quality Management Plan (WQMP) conforming to Orange County DAMP requirements. The Prepare a project WQMP of building permit; Orange, City of plans shall be prepared by a Licensed Civil Engineer or Environmental Engineer and shall be conforming to Orange during construction Costa Mesa submitted to the City of Costa Mesa Department of Public Works for review and approval. County DAMP requirements Department of The City shall not issue a grading permit for the project until it has reviewed and approved the Public Works final drainage plan and WQMP. Prior to issuance of building permits, the City shall ensure the components of the drainage plan and WQMP BMPs have been installed. City of Costa Mesa 11.3 125 East Baker Street Apartment Project EIR Red Oak Investments, LLC SCH No. 2013081051 CHAPTER 11 Mitigation Monitoring and Reporting Program SECTION 1 1.4 Mitigation Monitoring and Reporting Program Matrix Table 11-1 Mitigation Monitoring and Reporting Program Matrix Final E1R February 2014 Comp encyl fiance Measure I Action "uked I Mont7oring Phase I A Parcty 'nNaDate VenComments LAND USEIPLANNING MM4.5-1 The applicant for the proposed project shall provide a written statement to each Post Notice of Airport in Prior to issuance City of Costa residential unit and resident, notifying them of potential annoyances associated with aircraft Vicinity within residential of occupancy Mesa Planning overflight and proximity to airport operations, including the fallowing, with final form and development area permit Department content to be reviewed and approved by the Economic and Development Services Director and City Attorney: "NOTICE OF AIRPORT IN VICINITY: This property is presently located in the vicinity of an airport, within what is known as an airport influence area. For that reason, the properly may be subject to some of the annoyances or inconveniences associated with proximity to airport operations (for example, noise, vibration, or odors). Individual sensitivities to those annoyances, if any, are associated with the property before your purchase and determine whether they are acceptable to you. POSTING OF NOTICE OF DISCLOSURE IN EACH RESIDENTIAL UNIT Prior to offering the first residential unit for purchase, lease, or rent, the property owner or developer shall post a copy of the Notice of Disclosure in every unit in a conspicuous location. Also, a copy of the Notice of Disclosure shall be included in all materials distributed for the project, including but not limited to: the prospectus, informational literature, and residential lease and rental agreements." NOISE MM4.6-11 Prior to issuance of a certificate of occupancy, the applicant shall prepare an Prepare acoustical analysis Prior to issuance City of Costa acoustical analysis ensuring that interior noise levels due to exterior noise sources will be at of building permit Mesa Planning or below 45 dBA CNEL in all units. One or a combination of the following measures will be Department incorporated as necessary to ensure interior noise will be at or below 45 dBA CNEL: a. Limit opening and penetrations on portions of buildings impacted by noise. b. Apply noise insulation to walls, roofs, doors, windows, and other penetrations. c. Install dual -paned windows. For some units, it may be necessary for the windows to be able to remain closed to ensure that interior noise levels meet the interior standard of 45 dBA CNEL. Consequently, a ventilation or air conditioning system would be required for these units to provide a habitable interior environment with the windows closed. 125 East Baker Street Apartment Project E I R 11.4 Cify of Costa Mesa 5CH No. 2013081051 Red Oak Investments, LLC Final EIR February 2414 Table 11-1 Mitigation Monitoring and Reporting Program Matrix CHAPTER 1 1 Mitigation Monitoring and Reporting Program SECTION 11,4 Mitigation Monitoring and Reporting Program Matrix TRANS PORTno NITRAF FIC MM4.9-1 Pullman Street/Baker Street Intersection. Prior to issuance of a certificate of Install traffic signal and Prior to issuance kesponsible Agencyl Compliance Verification occupancy for the proposed project, the project applicant shall install a traffic signal and Mitigation Measure Action Required Monitoring Phase Party tri d Date Commerds MM4.6-2 For construction activities within 200 feet of existing commercial or industrial Construction document Prior to issuance City of Costa intersection. Intersection design will incorporate the existing driveway that provides access to businesses, the construction contractor shall implement the following measures during specifications of building permit Mesa Planning the 150 Baker Street property per the City of Costa Mesa Design Guidelines and California construction: Department Manual on Uniform Traffic Control Devices. The applicant will install signal interconnect a. The construction contractor shall provide written notification to all commercial and between Pullman StreetlBaker Street traffic signal and existing traffic signals at the Baker industrial tenants at least three weeks prior to the start of construction activities within Street/Red Hill Avenue and Baker StreetlSR 55 NB Ramps intersections. In conjunction with 200 feet of the receptor informing them of the estimated start date and duration of signalization, the project applicant will resbipe Baker Street to provide a dedicated eastbound daytime vibration -generating construction activities. and westbound left -tum lane, and a dedicated eastbound right -turn lane. Crosswalks and b. Stationary sources, such as temporary generators, shall be located as far from off-site ADA compliant ramps will be installed as required by the City. receptors as possible. MM4.9-2 Red Hili AvenuelBaker Street Intersection. Prior to issuance of a certificate of c. Trucks shall be prohibited from idling along streets serving the construction site. Prior to issuance City of Costa occupancy for the proposed project, the project applicant will implement the planned TRANS PORTno NITRAF FIC MM4.9-1 Pullman Street/Baker Street Intersection. Prior to issuance of a certificate of Install traffic signal and Prior to issuance City of Costa occupancy for the proposed project, the project applicant shall install a traffic signal and associated signing of occupancy Mesa Public associated signing modifications and pavement legends at the Pullman Street/Baker Sheet modifications and pavement permit Works intersection. Intersection design will incorporate the existing driveway that provides access to legends at the Pullman department the 150 Baker Street property per the City of Costa Mesa Design Guidelines and California StreetBaker Street Manual on Uniform Traffic Control Devices. The applicant will install signal interconnect intersection between Pullman StreetlBaker Street traffic signal and existing traffic signals at the Baker Street/Red Hill Avenue and Baker StreetlSR 55 NB Ramps intersections. In conjunction with signalization, the project applicant will resbipe Baker Street to provide a dedicated eastbound and westbound left -tum lane, and a dedicated eastbound right -turn lane. Crosswalks and ADA compliant ramps will be installed as required by the City. MM4.9-2 Red Hili AvenuelBaker Street Intersection. Prior to issuance of a certificate of Implement planned Prior to issuance City of Costa occupancy for the proposed project, the project applicant will implement the planned improvements at of occupancy Mesa Public improvements at this intersection as identified in the current City of Costa Mesa General intersection as identified in permit Works Plan, except the project applicant will provide a dedicated southbound right -turn lane, with the current City of Costa Department overlap phasing, in lieu of the planned third southbound shared through/right-turn lane. The Mesa General Plan, except applicant will modify the existing traffic signal accordingly to current City of Costa Mesa the project applicant will Standards and Design Guidelines. provide a dedicated southbound right -turn lane, with overlap phasing, in lieu of the planned third southbound shared throughlright-turn lane City of Costa Mesa Red Oak Investments, LLC 11-5 125 East Baker Street Apartment Project E I R SCH No. 201 308 1 D51 CHAPTER 1 1 Mitigall on Monitoring and Reporting Program SECTION 1 1.4 Mitigation Monitoring and Reporting Program Matrix Table 11-1 Mitigation Monitoring and Reporting Program Matrix Final EIR February 2014 125 East Baker Street Apartment Project EIR SC H No. 2013081051 11-4 City of Costa Mesa Red Oak Investments. LLC Responsible Compgance Venftatfon Agency/ Mitigation Measwe Action "Wired Monitorfng Phase Poanty Initial Date Comments MM4.9.3 Traffic Impact Fees. Prior to issuance of a certificate of occupancy for the proposed Project applicant will pay Prior to issuance City of Costa project, the project applicant will pay the City's required traffic impact fee, based on the the City's required traffic of occupancy Mesa Planning project's net increase in trips. The precise fee required will be determined upon issuance of impact fee, based on the permit department project building permits. project's net increase in trips MM4.9-4 To ensure adequate sight distance is provided at the project driveways, the project Project driveways and Prior to issuance City of Costa driveways and landscaping and/or hardscape on north side of these driveways will be landscaping and/or of occupancy Mesa Public designed such that a driver's clear line of sight is not obstructed and does not threaten hardscape on north side of permit Works vehicular or pedestrian safety, as determined by the City Traffic Engineer. The minimum these driveways will be department stopping sight distance will be 300 feet. The following design recommendations will be designed such that a implemented: driver's clear line of sight is ■ Install stop signs and stop bars at the proposed project driveways on Pullman Street. not obstructed and does not Install all appropriate striping, signage and/or pavement legends per City of Costa Mesa threaten vehicular or standards/requirements. pedestrian safety, as ■ All plants and shrubs within the limited use area (see Figure 4.9-3 [Line of Sight determined by the City Analysis)) will be of the y ]j type that will grow no higher than 30 inches above the curb or a Traffic Engineer have a canopy no lower than 72 inches above curb. • The maximum tree size and minimum tree spacing in the limited use area will be limited to 24 -inch caliper tree trunks (maximum size at maturity) spaced at 40 feet on center. ■ Subject to review and approval by the City Traffic Engineer, prohibit oh -street parking on Pullman Street between project driveways and on the north side of the primary project driveway, and restripe Pullman Street to include a dedicated southbound right -tum lane at the primary project driveway with minimum storage of 100 feet be provided. Curbside parking will be restricted for a minimum of 200 feet north of the primary driveway. Parking will be restricted via installation of red curb and appropriate parking restriction signs. 125 East Baker Street Apartment Project EIR SC H No. 2013081051 11-4 City of Costa Mesa Red Oak Investments. LLC