HomeMy WebLinkAbout33 - PH-3 - Attachment 7 - 5/6/2014ATTACHMENT 7
EIR ERRATA SHEET
Administrative Draft—Subject to Change Errata
May 2014
The following are text changes intended to clarify or correct information in the Draft EIR as initiated by
the City of Costa Mesa. Revisions are shown below as excerpts from the Draft EIR text, with a lime
through deleted text and a double underline beneath inserted text. In order to indicate the location in the
Draft EIR where text has been changed, the reader is referred to the page number of the Draft EIR as
published on January 12, 2012.
The corrections and/or additions below do not constitute significant new information as defined by
CEQA Guidelines Section 15088.5. A lead agency is required to recirculate an EIR when "significant
new information is added to the EIR after public notice is given of the availability of the draft EIR for
public review under Section 10587 but before certification." New information added to the EIR is not
considered significant unless "the EIR is changed in a way that deprives the public of a meaningful
opportunity to comment upon a substantial adverse effect of the project or a feasible way to mitigate or
avoid such an effect (including a feasible project alternative) that the project's proponents have declined
to implement."
TEXT CHANGES TO FINAL EIR VOLUME I (DRAFT EIR)
Page 2-4, new "Public Actions and Approval Required" following "Zoning Code
Amendment CO -13-02"
Development Agreement
The City of Costa Mesa and the Developer have entered into Development Agreement DA -14-02 to
fund public infrastructure improvements in the project area. The Developer has agreed to provide two
hundred_ fifty thousand dollars ($250.000.00) as a public infrastructure improvement contribution
payable to the City prior to issuance of the first certificate of occupancy for the proposed pro'ect.
City of Costa Mesa 1 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
Errata Administrative Draft—Subject to Change
May 2014
Page 2-15, Table 2-1 Summary of Impacts and Mitigation Measures, following the end of the
table
Table 2-1 Summary of Impacts and Mitigation Measures
NI = no impact; LTS = less than significant; PS = potentially significant; SU = significant and unavoidable
Impact
Significance
Before
Mitigation
Mitigation Measures
Significance
After
Mitigation
RECREATION
Impact 4.11-1 Implementation of the
PS
MM4.11.1 The City of Costa Mesa and the Developer shall enter
LTS
proposed proiect could result in
substantial adverse physical impacts
into Development Agreement DA -14-02 to fund public
infrastructure improvements in the project area. The Developer
associated with increased used
aLaLaLQyjde $250.000 as a public infrastructure improvement
existing neighborhood and regional
contribution payable to the City of Costa Mesa prior to issuance
parks or other recreational facilities
of the first certificate of occupancy for the proposed project,J12
such that substantial physicaladdition-
deterioration of the
the Developer shall provide approximately 38.000 sf of
common usable open space and on-site amenities. which are to
occur or be accelerated. This is
considered a potentially significant
include recreation areas, a pool, reflective water feature -
clubhouse, fitness center, dog -park, community garden.
impact. However, implementation of
basketball court barbecues. bike racks and walking path.
mitigation would reduce this impact to
a less -than -significant level.
Page 3-15, new "Public Actions and Approval Required" following "Zoning Code
Amendment CO -13-02"
■ Development Agreement
The City of Costa Mesa and the Developer have entered into Development Agreement DA -14-02 to
fund public infrastructure improvements in the project area. The Developer has agreed ta=provide two
hundred- fifty thousand dollars ($250;000.00) as a public infrastructure improvement contribution
payable to the City prior to issuance of the first certificate of occupancy for the proposed pro'ect.
Page 4.8-24, "Parks" section, first paragraph
Parks
This section of the EIR describes park services within the City of Costa Yro`ie*s-eMesa and analyzes the
potential physical environmental effects related to parks created by construction of new or additional
facilities associated with implementation of the proposed project.
Page 4.8-25, "Quimby Act" section, first paragraph
Quimby Act
The Quimby Act was established by the California legislature in 1965 to provide parks for the growing
communities in California. The Act authorizes cities to adopt ordinances addressing parkland and/or in -
125 East Baker Street Apartment Project EIR 2 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
Administrative Draft—Subject to Change Errata
May 2014
lieu fees for residential subdivisions for the purpose of providing parklands and recreational facilities.
unless the affiettiat of e36sting neighborhood and community park area in the City exceeds that hwik, i
whieh ease the City ffiay adopt a higher- standar-d not to emeeed 5 aeres per- 4,000 r-esidents. The Quiffib
However_ the proposed project
an apartment complex. not a residential subdivision. and is not subiect to the Citv of Costa Mesa
Parkland Impact Fee Schedule.
Page 4.8-28, "Effects Not Found to Be Significant" section
k Effects Not Found to Be Significant
The Initial Study prepared for the proposed project found that the effects of the proposed project would
be patefitia4y1 h n significant since the prol2osed project would not result in the provision of new or
lzh sy icallv altered government facilities_ or in the need for new or 1h s -y altered govern
facilities, or in the need for new or physically altered governmental facilities_ the construction of which
could cause significant environmental impacts_ in order to maintain acceptable service ratios_ response
times_ or other performance objectivesand ar-e therefor -e analyzed belaw with iaespeet te, �for parks.
Additional information and analysis is provided below to clarify potential effects to parks.
Pages 4.8-29 to 4.8-30, beginning with second paragraph
With Tthe addition of 346 residents, the proposed project would generate a need for approximately
1.47 acres of additional parkland and may place additional demands on the programming capability at
Del Mesa Parkander ark facilities in the City. rev-�tThe proposed project would provide
approximately X938.000 sf of common usable open space and on-site amenities, which include
recreation areas, a pool, and a clubhouse, and would largel�v alleviate demands on Del Mesa Park and
other parks. Based upon an anticipated population of 346 residents, it is anticipated that many of the
recreational needs of the future residents will be met by the proposed project's on-site recreational
amenities. watild generate the need for- 1.47--aer-es of parldand. 4he proposed projeef ifiell
site, as well as, sports eatirts.
For all the reasons noted above, the proposed project would not result in substantial adverse p=hXsical
impacts associated with the provision of new or physically altered park facilities, or in the need for new
or ph s�v altered facilities. The use of the on-site amenities, in addition to implementation of
mitigation measure MM4.11-1 as discussed in Section 4.11 (Recreation)_ would reduce impacts to existing
and/or facilities to a less-thanm!: g cantlevel.
> >
wid-rin the proposed subdMsion, or Wbere the subdivision eantains fifty (50) lots of fewer, the subdMde
fft aeeardanee with the sehedule of fees as adopted by resolution of the City Getineil."
City of Costa Mesa 3 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
Errata Administrative Draft—Subject to Change
May 2014
4.8.19 Cumulative Impacts—Parks
Threshold Would the project result in substantial adverse physical impacts associated with the
provision of new or physically altered governmental facilities, or in the need for new
or physically altered governmental facilities, the construction of which could cause
significant environmental impacts, in order to maintain acceptable service ratios,
response times, or other performance objectives for parks?
Project development, in combination with other cumulative residential development within the City of
Costa Mesa, would directly increase the population. Increases in population would generate a higher
demand for recreational facilities and programs, and reduce the existing parkland per resident ratio. The
Open Space and Recreation Element of the City's General Plan establishes a parkland demand factor of
5.76 acres per 1,000 residents. This standard could be provided through park fees, land dedication, or a
combination of both as described in CMMC Title 13, Chapter XI, Article 5 (Park and Recreation
Dedications) for residential subdivisions. Therefore, ,any cumulative
projects in the City_ that are residential subdivisions_ would not likely result in impacts to recreation
opportunities because such new development projects are required to eitherprovide adequate parkland
on-site., or pay applicable in -lieu park fees. Because there are mechanisms in place .,
through enfer-eemeiit of the to ensure that new residential subdivisions provides
its—their fair -share of park and recreational opportunities for future residents, and new apartment
tnroiects. which are not subiect to the Citv's bark im-Dact fee ordinance. have to mitigate for anv potential
impacts through pro�pecific mitigation measures_ the cumulative impact would be less than
significant. The proposed project's contribution would not be cumulatively considerable and would also
be less than significant.
Page 4.8-24, Section 4.8.20 (References), following last reference
4.8.20 References
Costa Mesa, City of. 1974. City of Costa Mesa Municpal Code, January 1974.
2002a. City of Costa Mesa 2000 General Plan, adopted January 2002.
125 East Baker Street Apartment Project EIR 4 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
I
Pill"
Y_
4.8.19 Cumulative Impacts—Parks
Threshold Would the project result in substantial adverse physical impacts associated with the
provision of new or physically altered governmental facilities, or in the need for new
or physically altered governmental facilities, the construction of which could cause
significant environmental impacts, in order to maintain acceptable service ratios,
response times, or other performance objectives for parks?
Project development, in combination with other cumulative residential development within the City of
Costa Mesa, would directly increase the population. Increases in population would generate a higher
demand for recreational facilities and programs, and reduce the existing parkland per resident ratio. The
Open Space and Recreation Element of the City's General Plan establishes a parkland demand factor of
5.76 acres per 1,000 residents. This standard could be provided through park fees, land dedication, or a
combination of both as described in CMMC Title 13, Chapter XI, Article 5 (Park and Recreation
Dedications) for residential subdivisions. Therefore, ,any cumulative
projects in the City_ that are residential subdivisions_ would not likely result in impacts to recreation
opportunities because such new development projects are required to eitherprovide adequate parkland
on-site., or pay applicable in -lieu park fees. Because there are mechanisms in place .,
through enfer-eemeiit of the to ensure that new residential subdivisions provides
its—their fair -share of park and recreational opportunities for future residents, and new apartment
tnroiects. which are not subiect to the Citv's bark im-Dact fee ordinance. have to mitigate for anv potential
impacts through pro�pecific mitigation measures_ the cumulative impact would be less than
significant. The proposed project's contribution would not be cumulatively considerable and would also
be less than significant.
Page 4.8-24, Section 4.8.20 (References), following last reference
4.8.20 References
Costa Mesa, City of. 1974. City of Costa Mesa Municpal Code, January 1974.
2002a. City of Costa Mesa 2000 General Plan, adopted January 2002.
125 East Baker Street Apartment Project EIR 4 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
Administrative Draft—Subject to Change Errata
May 2014
2002b. City of Costa Mesa 2000 General Plan Environmental Impact Report. Final EIR No. 1051,
January.
Following page 4.10-26, a new Section 4.11 (Recreation) has been added.
4.11 RECREATION
This section of the EIR describes existing park facilities within the City of Costa Mesa and analyzes the
potential environmental effects associated with the increased use of existinaneizhborhood and reajonal
parks_ or the requirement for the construction of new or the expansion of existing recreational facilities
associated with implementation of the pro osed ro'ect.
Data for this section were taken from City of Costa Mesa Open Space Element. Full reference -list entries
for all cited materials are provided in Section 4.11.5 (Referenced.
4.11.1 Environmental Setting
The Citv of Costa Mesa's inventory of oven space and recreation opportunities includes a wide range of
facilities including highly developed_ active recreation sites to low -activity, passive open spaces.
Section 4.8 (Public Services) includes Figure 4.8-5 (Parks_ Recreation_ and Open Space InventogJ which
depicts the existing network of open space and recreation facilities in the City of Costa Mesa. In addition_
Table 4.8-3 (Open Space Inventorv) lists the open space and nark facilities and their respective acreages
in the City of Costa Mesa.
Residents of the proposed project would most likely use Del Mesa Park, which is located approximately -
0.5 mile to the north. The 2.46 -acre park includes picnic tables, a playground, and volleyball and
basketball facilities.
4.11.2 Regulatory Framework
■ Federal
There are no federal regulatiapplicable to parkland or recreational facilities.
w State
Quimby Act
The Ouimbv Act was established by the California legislature in 1965 to provide narks for the growin
communities in California. The Act authorizes cities to adopt ordinances addressing parkland and/or in -
lieu fees for residential subdivisions for the purpose rovidin"arklands and recreational facilities.
However, the proposed project is an apartment complex, not a residential subdivision, and is not subject
to the City of Costa Mesa Parkland Impact Fee Schedule.
City of Costa Mesa 5 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
Errata Administrative Draft—Subject to Change
May 2014
State Public Park Preservation Act
The primary instrument for protecting and preservingparkland is the state Public Park Preservation Act.
Under the Public Resource Code; cities and counties may not acquire aniproper , that is in use as a
public park for any non -park use unless compensation or land_ or both_ are provided to replace the
parkland acquired, to avoid a net loss of parkland.
alifornia Street and Highway Code
The California Street and Highway Code establishes standards for pedestrian and bicycle facilities within
or adjacent to the right-of-way of roads_ streets_ and highways.
E Local
City of Costa Mesa General Plan
The City of Costa Mesa General Plan 012en Space and Recreation Element includes the following
and policies that are relevant to the analysis:
Goal OSR-1 Environmental Quality and Resource Conservation. It is the goal of the City of Costa
Mesa to provide its citizens with a high duality environment through the
development of recreation resources, and the preservation of open space.
Objective OSR 1A Preserve the City's open space lands_ and provide additional community and
neighborhood parkland in conjunction with future population increases to
provide adequate recreational opportunities and relief from the pressures of urban
development.
Policy OSR-1A.1 Provide a minimum of 5.76 acres of permanent public open
space (consisting- of 4.26 acres of neighborhood and
community parks and 1.5 acres in school ard% for every
1,000 residents.
Policy 0SR-1A.5 Encourage_ throughh development rights transfers or other
incentives_ the developmentprivate permanent open ace
and recreation facilities to meet the needs of the City's
residents.
Policy 0SR-1A.8 Continue to require; through development standards_ the
integration en space and recreational uses and facilities
into all muldple-family residential pro'ects.
City of Costa Mesa Municipal Code Title 13, Chapter A Article 5 (Park and
Recreation Dedications)
The Citv's standard for permanent public open space is 5.76 acres per 1.000 residents. Citv Municinal
Code Section 13-251 states; `Every residential subdivider who creates a subdivision shall be required to
dedicate a portion of the land_ pay a fee in lieu thereof or do a combination of both_ as established in
this article for the purpose of providing park and recreational facilities to serve future residents of the
subdivision." Chapter XI_ Article 5_ establishes the development impact fees for residential development
125 East Baker Street Apartment Project EIR 6 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
Administrative Draft—Subject to Change Errata
May 2014
in lieu of land dedication. CMMC Section 13-256 (Amount of Fee in Lieu of Land Dedication) specifies
that "where there is no public park or recreation facility required within the proposed subdivision_ or
where the subdivision contains fifty (50) lots or fewer, the subdivider shall Fav a fee in lieu of land
dedication reflecting the value of land required for park and recreation purposes_ in accordance with the
schedule of fees as adopted by resolution of the Citv Council." Although this City code provision does
not aanly to the aronosed aroiect_ it can provide a frame of reference for the Groner provision of hark
and recreational facilities.
4.11.3 Impacts and Mitigation Measures
Analytic Method
L Thresholds of Sianificance
The followin
thresholds of sianificance
are
based on the 2013 CEOA
Guidelines Appendix G. For
purposes of this
EIR; implementation
of the prol2osed
project may have
a significant adverse impact on
neighborhood
and regional parks
or other recreational
facilities if it would
do any of the following
■ Increase the use of existing neighborhood and regional parks or other recreational facilities such
that substantial physical deterioration of the facility would occur or be accelerated
■ Include recreational facilities or require the construction or expansion of recreational facilities
that might have an adverse physical effect on the environment
■ Effects Not Found to Be Significant
The Initial Studv orenared for the nronosed aroiect found that the potential effect of the tDronosed
project on recreation facilities would be insignificant. Additional information and analysis is provided
below to clarify potential recreation effects. Notably, the Initial Study's conclusion was based upon the
incorrect assumption that Quimby Act fees, discussed above, would apply t�proposed project.
Although such fees would not aaaly to the nronosed aroiect_ there are other reasons for the same
onclusion, as discussed in detail belo
City of Costa Mesa 7 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
Errata
■ Project Impacts and Mitigation
Administrative Draft—Subject to Change
May 2014
Threshold Would the project increase the use of existing neighborhood and regional barks or
other recreational facilities such that substantial physical deterioration of the facility
would occur or be accelerated?
Impact 4.11-1 Implementation of the Proposed Proiiect could result in substantial adverse
physical impacts associated with increased use of existing neighborhood
and regional parks or other recreational facilities such that substantial
physical deterioration of the facility would occur or be accelerated. This is
considered a Potentially significant impact. However, implementation of
mitigation would reduce this impact to a less-than-sjZ ja=tlevel.
The Proposed project consists of 240 residential units, which would result in the addition of
approximately 346 residents to the proiecL,site. Residents of the proposed project would most likely use
Del Mesa Park; located approximatel-)T 0.5 mile to the north. The 2.46 -acre park includes _picnic tables;
121a-)�ground, volleyball, and basketball facilities.
With the addition of approximately 346 residents, the proposed project would a need for
apl2roximately1.47 acres of additional parkland as required per General Plan Policy No. 0SR-1A.1 an
may lace additional demands on the 12rogrammina capability at Del Mesa Park and other park facilities
in the City of Costa Mesa. This is considered a potentiallnificant im act.
However. the proposed project would provide approximately 38.000 sf of common usable open space
and on-site amenities- which include recreation areas, a pool, reflective water feature, clubhouse, fitness
center, dog -park. communityuarden, basketball court, barbeques, bike racks and walking path. Because
these amenities are similar to those available at Del Mesa Park or other adjacent parks and recreational
facilities in the City and, in fact, are more extensive than those specificalltprovided at Del Mesa Park_
residents would be reasonably likely to use on-site amenities more than Del Mesa Park or other City
facilities. Therefore- the demands on Del Mesa Park and other adjacent parks from the pro osed proms
are expected to be reduced due to the extensive on-site amenities to be provided artproposed
project. In addition- the Applicant will contribute funds to the City_ of Costa Mesa (Development
Azteement DA -14-02, for public infrastructure improvements in the project area. The Applicant has
calculated thea proximate value of the on-site amenities, in addition to the Development Azreement
contribution, as shown in Table 4.11-1 (Applicant Amenity Package
Table 4.11-1 Applicant Amenity Package
Value of On -Site Amenities
$3.284,920.00
Development Agreement Contribution (Infrastructure Improvements)
1250-000.00
Total Value of Amenity Package
$1534,920.00
Contribution per Unit (240 du)
U4,ZM
125 East Baker Street Apartment Project EIR 8 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
Administrative Draft—Subject to Change Errata
May 2014
If the nroiect were a residential subdivision it would be subiect to the Citv of Costa Mesa Parkland
Impact Fee Schedule_ and the fee per multi -family dwelling unit would be 513.829. Since the pro'ect is an
apartment and not a residential subdivision_ it is not subject to the Quimby Act or the City's Parkland
Impact Fee Schedule. However_ it is subject to the implementation of MM4.11-1_ which would ensure
that the Applicant provides a combination of on-site amenities as well as a contribution of funds to the
Citv of Costa Mesa for oublic infrastructure improvements_ would reduce this impact to a less -than -
significant level.
MM4.11-1 The Citv of Costa Mesa and the Developer shall enter into Development Agreement DA -14-02 to
fund public infrastructure improvements in the bMiect area. The Developer shall provide 5'250.000
as a public infrastructure improvement contribution payable to the City of Costa Mesa prior to
issuance of the first certificate�cf occupan fc or theroosed�proiect. In addition. the Developer shall
provide approximately 38.000 sf of common usable open mace and on-site amenities. which are to
include recreation area& a pool. reflective water feature. clubhouse. fitness center, dohpark,. community
Urden. basketball court. barbecua bike racks and svalk.ia bath•
Threshold Would the project include recreational facilities or require the construction or
xpansion of recreational facilities that might have an adverse physical effect on the
environment?
Impact 4.11-2 Implementation of the proposed project would include recreational
facilities, but the construction of such recreational facilities would not have
an adverse physical effect on the environment. This would be a less-than-
signiWicant impact.
As discussed above_ the proposed project would add approximately 346 residents to the project
area and would generate the need for approximately 1.47 acres of parkland as required per General Plan
Policy No. OSR-1A.1. The proposed project would include the construction of on-site recreational
amenities includingzapool, reflective water feature_ clubhouse_ fitness center_ dog -park, community
garden, basketball court, barbeques. bike racks and walking=path that would not result in adverse impacts
on the environment. As to the construction of the on-site amenities, these would be constructed at the
same time and in the same manner as the proposed project itself. Therefore, there would be no different
environmental effects as to construction of the on-site amenities separate and apart from construction of
the proposed project itself_ which environmental effects are all analyzed in this EIR. As to the potential
construction or expansion of other recreational facilities_ the proposed project is not likely to cause such
construction or expansion due to the extensive on-site recreational amenities that would be hart of the
The proposed project would replace a commercial/industrial development in an existinIz urbanized
mmuni _ with a residential apartment complex includina recreational amenities that would help
alleviate demands on Del Mesa Park and other adjacent parks. In addition_ the Applicant would
contribute funds to the City of Costa Mesa for future public infrastructure improvements. Additionally_
implementation of mitigation measure MM4.11-1 (as discussed above) would ensure that the Applicant
provides a combination of on-site amenities as well as a contribution of funds to the City of Costa Mesa
for public infrastructure improvements. Any future public infrastructure improvements would be sub'ect
to the requirements of CEOA as well as other applicable laws and regulations_ and as part of standard
City of Costa Mesa 9 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
Errata Administrative Draft—Subject to Change
May 2014
development Procedures_ would be submitted to the Citv of Costa Mesa for review and aper
Therefore; the construction or expansion of recreational facilities as a result of the proposed proal
would not result in adverse impacts on the environment, and impacts would be considered less than
significant.
4.11.4 CumulativeImpacts
Threshold Would the project increase the use of existing neighborhood and regional parks or
Cher recreational facilities such that substantial physical deterioration of the facility
would occur or be accelerated?
Project�pment. in combination with other cumulative residential development within the City of
Costa Mesa; would directly increase the population; which would generate a higher demand for
recreational facilities and programs throughout the City. Overall. this could result in or accelerate the
physical deterioration of existing arks or other recreational facilities. The Open Space and Recreation
Element of the City's General Plan establishes a parkland demand factor of 5.76 acres per 1.000
residents. This standard could be met through park fees, land dedication, or a combination of both as
described in CMMC Title 13; Chanter XI; Article 5 (Park and Recreation Dedications) for projects that
are residential subdivisions. In addition; residential projects not subject to the city nark impact fee
ordinance; such as the prol2osed project, would be required to mitigat�y impacts on park and
recreational uses. Therefore, similar to the proposed project, future projects in the City would notlikely
result in cumulative impacts to recreation opportunities because new development projects (including
apartment projects and residential subdivision projects) are required adequate parkland onsite.
VU in- ark fees for improvements to existing narks and recreational facilities develop new parks
and/or private recreational facilities, or provide other mitigation to address any impacts. Because there
are mechanisms in place to ensure that future developments contribute park and recreational
opportunities for future residents, cumulative impacts would be less than significant. The proposed
nroiect's contribution to these imnacts would not be cumulativelv considerable and would also be less
than significant.
Threshold Would the project include recreational facilities or require the construction or
expansion of recreational facilities that might have an adverse physical effect on the
environment?
The proposed project would include the construction of on-site recreational amenities including
common open space and recreation areas, a pool, reflective water feature, clubhouse, fitness center, dog-
nark, communit garden. basketball court. barbedues. bike racks and walking Vath. that would not result
in adverse impacts on the environment. The proposed project would replace a commercial/industrial
development in an existing, urbanized community; with a residential apartment complex including
recreational amenities that would help alleviate demands on Del Mesa Park and other adjacent parks.
However. cumulative residential development within the City of Costa Mesa may include recreational
facilities or require the construction or expansion of recreational facilities that could result in adverse
_physical effects on the environment. The potential for adverse effects would be reduced by adherence to
city requirements and mitigation measures imposed on new development for the purpose of reducing or
avoiding such effects. As the potentially adverse effects of the proposed project would be reduced to a
125 East Baker Street Apartment Project EIR 10 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC
Administrative Draft—Subject to Change
May 2014
Errata
less -than -significant level_ the proposed project's contribution would not be cumulatively considerably
and would also be less -than -significant.
4.11.5 References
Costa Mesa. Citv of. 1974. City of Costa Mesa Munigbal Code, e anuary 1974.
2002a. Citv of Costa Mesa 2000 General Plan_ adopted Tanuary 2002.
2002b. City of Costa Mesa 2000 General Plan Environmental loact KW rt. Final EIR No. 1051_
anua .
City of Costa Mesa 125 East Baker Street Apartment Project EIR
Red Oak Investments, LLC SCH No. 2013081051
inn. r l
Administrative Draft—Subject to Change
May 2014
TEXT CHANGES TO FINAL EIR VOLUME IA (DRAFT EIR CHANGES, RESPONSES TO COMMENTS,
AND MITIGATION MONITORING AND REPORT PROGRAM)
Page 11-6, Table 11-1 (Mitigation Monitoring and Reporting Program Matrix), following the end of table
Table 11-1 Mitigation Monitoring and Reporting Program Matrix
Responsible Compliance Verification
Agency/
Mitigation Measure Action Required Monitoring Phase Party Initial Date Comments
RECREATION
MM4.11-1 The City of Costa Mesa and the Developer shall enter into Development
Project Applicant will pay
Prior to issuance
Citv of Costa
Agreement DA -14-02 to fund public infrastructure improvements in the project area. The
the $250,000 public
infrastructure improvement
of the first
certificate of
ccu�Dancv
Mesa Planning
Developer shall provide 250.000 as a public infrastructure improvement contribution payable
Department
to the City of Costa Mesa prior to issuance of the first certificate of occupancy for the
contribution, and Ovide
proposed project. In addition. the Developer shall provide approximately 38 000 sf of common
-pr
approximately 38,000 sf of
sable open space and on-site amenities, which are to include recreation areas, a pool.
common usable open space
reflective water feature, clubhouse, fitness center, dog -park- community garden, basketball
on site
arbeaues. bike racks and walking path.
125 East Baker Street Apartment Project EIR 12 City of Costa Mesa
SCH No. 2013081051 Red Oak Investments, LLC