HomeMy WebLinkAbout10 - CC-6 - Attachment 2 - 5/20/2014PROPOSAL
RFP No. 1166
Proposal for Fire Station #4
Renovation/Addition
CITY OF COSTA MESA
"IDS GROUP
PROPOSAL
RFP No. 1166
Proposal for Fire Station #4
Renovation/Addition
CITY OF COSTA MESA
Ak_►IDS GROUP
,A IDS GROUP
January 27, 2014
Ms. Kim Wilson
City of Costa Mesa I City Hall
77 Fair Drive
Costa Mesa, CA 92628
SUBJECT: Proposal for Fire Station #4 Renovation/ Addition
RFP No. 1166
Dear Ms. Wilson and Members of the Selection Committee:
IDS Group is pleased to present this proposal for the Renovation/Addition of Fire Station #4
to the City of Costa Mesa. IDS is an award -winning multi -discipline architecture and
engineering consulting firm with specific skill in the retrofit and rehabilitation of existing
facilities. With over 70 professionals, IDS provides industry -leading expertise in the
renovation and expansion of essential facilities..
• IDS is one of the most respected architecture and engineering firms in California. Our
proposed project architects and engineers have renowned reputations, with significant
hands-on experience with public agency rehabilitation and development projects. Our
principals and staff have been serving on many code development committees and have
published over 100 technical papers and engineering articles on structural and seismic
design and the retrofit of buildings.
• IDS has performed as the executive engineer on similar renovation and expansion
projects for numerous clients. Our clients include: City of Huntington Beach, City of
Anaheim, City of Los Angeles, City of Fullerton, City of San Bernardino, City of Riverside,
City of Orange, City of La Palma, City of Newport Beach, City of Irvine, City of Santa
Monica and many other counties, cities and state agencies.
• We pride ourselves in our ability to develop creative design solutions that are cost-
effective and least -disruptive to the structure and its occupants. We strive to provide
solutions that enhance the functionality of the existing structure by adding elements that
improve usability but also serve to provide seismic strengthening. For our innovative
design and upgrade projects, we have won multiple "Excellence in Structural
Engineering" awards from the Structural Engineers Associations of California and
Southern California during the last eight years.
• As a full -service Architectural/ Engineering consulting firm, IDS provides ancillary
consulting support services in-house, if needed, including architectural / ADA,
mechanical / electrical and civil engineering, surveying, cost estimating, and LEED
sustainability services.
IDS Group hereby acknowledges receipt of Amendment Number 1. Acknowledgment of the
Amendment documents is included following this cover letter. Additionally, we acknowledge
that the proposal price will be valid for a period of 180 days.
1 Peters Canyon Road, Suite 130, Irvine California 92606 ♦ T: 949.387.8500 ♦ F: 949.387.0800 ♦ www.idsgi.conn
We thank you for the opportunity to submit this proposal and look forward to a favorable
response from you. Please do not hesitate to call me at 949.387.8500 should you have any
questions.
Sincerely,
IDS
Group,
�Inc.
Silber, AIA
Principal Architect
AA IDS GROUP Page 2
REQUEST FOR PROPOSAL
laM
FIRE STATION #4 RENOVATION/ADDITION
RFP NO.1166
Costa Mesa
Fire Department
CITY OF COSTA MESA
Released on January 7, 2014
The referenced document has been modified as per the attached Amendment No. 1
Please sign this Amendment where designated and return the executed copy with
submission of your proposal. This amendment is hereby made part of the referenced
proposal as through fully set forth therein. Any questions regarding this amendment
should be addressed to Kimberly Wilson, email Kimberly.Wilson(a�Costamesaca.gov
Methodology Section
Provide a detailed description of the approach and methodology to be used to
accomplish the Scope of Work of this RFP. The Methodology Section should
include:
An implementation plan that describes in detail (i) the methods, including
controls by which your firm or entity manages projects of the type sought
by this RFP; (ii) methodology for soliciting and documenting views of
internal and external stakeholders; (iii) and any other project management
or implementation strategies or techniques that the respondent intends to
employ in carrying out the work.
2. Detailed description of efforts your firm or entity will undertake to achieve
client satisfaction and to satisfy the requirements of the "Scope of Work'
section.
3. Detailed project schedule, identifying all tasks and deliverables to be
performed, durations for each task, and overall time of completion,
including a complete transition plan. Include your plan to deal with
fluctuation in service needs and any associated price adjustments.
4. Detailed description of specific tasks you will require from City staff.
Explain what the respective roles of City staff and your staff would be to
complete the tasks specified in the Scope of Work.
Proposers are encouraged to provide additional innovative and/or creative
approaches for providing the service that will maximize efficient, cost-
effective operations or increased performance capabilities. In addition, the
City will consider proposals that offer alternative service delivery means
and methods for the services desired.
.411 other provisions ofthe invitation ofthis proposal shall remain in their entirety.
3
Vendors hereby acknowledge receipt and understanding of the above Amendment.
Complete & sign below and include this with your proposal for this RFP.
IDS Group, Inc.
Signature Date Company Name
Rami Elhassan, Principal
Typed Name and Title
1 Peters Canyon Rd, Suite 130
Irvine, CA 92606
Address
TYPE OF APPLICANT:
REQUEST FOR PROPOSAL
Fire Station #4 Renovation/Addition
VENDOR APPLICATION FORM
❑ NEW
Legal Contractual Name of Corporation:
® CURRENT VENDOR
IDS Group, Inc.
Contact Person for Agreement: Rami Elhassan, PhD, SE
Corporate Mailing Address:
City, State and Zip Code:
E-Mail Address: mmi.elhassan@idsgi.com
Phone: 949.387.8500
1 Peters Canyon Rd, Ste 130
Irvine, CA 92606
Contact Person for Proposals: Marc Block
Title- Marketing Manager
Business Telephone:
949.387.8500
Is your business: (check one)
❑ NONPROFIT CORPORATION
Is your business: (check one)
® CORPORATION
❑ INDIVIDUAL
❑ PARTNERSHIP
Fax: 949.387.0800
E-Mail Address: marc.block@idsgi.com
Business Fax: 949.387.0800
❑ FOR PROFIT CORPORATION
❑ LIMITED LIABILITY PARTNERSHIP
❑ SOLE PROPRIETORSHIP
❑ UNINCORPORATED ASSOCIATION
16
17
Names & Titles of Corporate Board Members
(Also list Names & Titles of persons with written authorization/resolution to sign contracts)
Names Title Phone
Said Hilmy, PhD, SE, LEED AP President 949,387.8500
Rami Elhassan, PhD, SE Vice President 949.387.8500.
Federal Tax Identification Number: 33-0819861
City of Costa Mesa Business License Number:
None
(If none, you must obtain a. Costa Mesa Business License upon award of contract.)
City of Costa Mesa Business License Expiration Date: N/A
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Table of Contents
TABLE OF CONTENTS
Background and Project Summary ...............................................................................................1
Methodology...................................................................................................................................
2
ImplementationPlan.........................................................................................................2
Scopeof Work....................................................................................................................3
CityCollaboration...............................................................................................................
6
Creative and Innovative Approach....................................................................................7
ProjectSchedule................................................................................................................7
Staffing........................................................................................................................................... 8
Qualifications................................................................................................................................12
LicensesI Registrations..................................................................................................16
FinancialCapacity........................................................................................................................17
FeeProposal.................................................................................................................................18
Forms and Disclosures................................................................................................................19
AA IDS GROUP Page i
PROPOSAL BACKGROUND AND PROJECT SUMMARY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Background and Project Summary
This scope of work for this project is consistent with previous assignments that we have
performed for other clients in Southern California. IDS' primary goal for this assignment is to
ensure that the City of Costa Mesa is provided with prompt, cost-effective and quality
professional architectural and engineering services.
The following presents our proposed Scope of Work, including a brief description of the
activities associated with each scope item.
Background
Fire Station No. 4 is a one-story, 6,000 SF type V-1hr construction, designed and built under
the 1964 UBC. The occupancy class is F-2, E-4, and G. The existing apparatus room is 39'-
10" X 58'-9". The dimension from the finish floor to the top roof steel beams is 16-0". The
existing apparatus bay currently housed 2 fire engines, the USAR-84, and the ME-84, and
the SCBA Bottle Filing Station.
The Fire Station requires a renovation and add on to accommodate additional vehicles and
relocate the SCBA Bottle Filing Station. The design will include the 2 options described
below:
Option 1: Extend the existing (39'-10" W x 58'-9" Q apparatus room at the roll -up door
(East) side by 201 x 16' H, to accommodate two ME-84 fire engines and one MT-84 ladder
truck.
Option 2: In addition to option 1, add a 25' W x 301 x 12' H garage adjacent but not
attached to the new addition or existing classroom structure that will accommodate one
utility and one reserve fire truck.
Description of the scope includes discussion of necessary payment of fees we understand to
be part of the project description but not the scope of A/E services included in the fee
portion of this proposal.
Project Goals
All our services will comply with the 2013 edition of the California Building, Fire, Plumbing,
Mechanical, Electrical, and Green Standards Code. Our architects and engineers are
thoroughly familiar with current accessibility regulations and federal ADA requirements as
they relate to fire station renovation and addition. We will be responsible for pulling all
necessary permits, paying all fees, and obtaining approved plans from the City.
Site Design, building architectural and engineering design will be under a single contract for
a cost of the work with a guarantee maximum price.
IDS aims to streamline the process for the City of Costa Mesa by keeping in mind simplicity,
durability, long service life, lowering future maintenance and repair costs, and reasonable
standardization of the fire station.
A IDS GROUP Page g
PROPOSAL METHODOLOGY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Methodology
Implementation Plan
Our implementation plan is based on an effective management of project and resources and
will include developing a project schedule, implementing effective communication protocol,
monitoring project cost and budget, and implementing quality control measures to ensure
quality products as follows.
Our plan is based upon a hierarchical team approach and is led by the Project Manager, Mr.
John Silber, AIA. In this plan, and as identified in the organization chart, he will assign a
Project Engineer, Architect and assemble the project team, matching the special capabilities
of our staff and / or consultants with the requirements of the project. The Project Manager is
committed to meeting staffing and schedule requirements necessary for successful project
completion.
Project communication begins with establishing project responsibilities, organizational
structure and clear lines of reporting within the consulting team. Based on our experience in
similar projects, we have developed a clear and efficient management procedure for our
services.
In this management plan, the Project Manager will give the City a single -point of contact /
responsibility for the overall contract. In addition, the Project Manager will:
• Ensure that the team is supported with the commitment of necessary resources of the
firm to respond to the project needs for a successful project completion.
■ Develop the project schedule and monitor the progress of the project through standing
team meeting and monitor the review budget at various stages. Provide progress reports
and facilitate the review of the work.
■ Monitor the technical performance of the project team, ensure quality and consistency
(QC), and ensure detection and resolution of project performance issues before they
become problems.
• Ensure that the City is clearly informed of the progress and status of the project.
• Enhance working relationships of team members and the City.
Each Project Engineer I Architect assigned for each needed discipline (mechanical,
electrical, architectural, etc.) project assignment will:
• Have full responsibility for the discipline from start to finish, immersing himself/herself in
the project and reporting progress to the Project Manager through standing meetings
scheduled at the start of the project.
• Assume full responsibility and liability for the work performed by assigned staff and bear
full responsibilities for the work.
• Attend necessary meetings, perform required site visits to project site(s) and perform
project design / design review.
Quality Assurance: Quality Assurance has been always our company's strong commitment.
We emphasize establishing and maintaining technical and professional expertise among our
staff and in their work product. We are staffed with licensed professionals, as are our sub-
J & IDS GROUP Page 2
PROPOSAL METHODOLOGY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
consultants. All our professionals are encouraged to maintain membership in professional
organizations, to attend professional development conferences and to sustain proficiency
within the field of engineering.
We implement a written and detailed program for quality assurance / quality control. It
requires the review of all engineering work by a QA I QC manager who is qualified in this type
of review. The main objective of this program is to satisfy the client's need for quality work
expected from our design team and also to limit the exposure of the county from problems
that may arise during construction.
Our practice stresses response to project requirements, adherence to applicable codes and
regulations, developing work products consistent with standards prevailing in the profession
and producing documents conforming to our in-house standards established. Throughout
the course of the project our Project Manager will be in continuous contact with our team
members to ensure efficient use of the capabilities of the entire team. He will ensure that
our team understand the County's requirements and preferences as wells as to assure
adherence to the project schedules and deliverables in a timely manner. The City will be
provided with a minimum of a biweekly update of the progress of the work.
Staffing and Resources Management Plan: Our team members are guaranteed to be
available on request to serve the City of Costa Mesa. IDS has a total staff of over 70
professionals and our team members all have the depth and adequacy of resources to
successfully complete assigned projects within the County -specified time frame.
Our experience with our clients has been to furnish the most expeditious and efficient
response time available. Our current and projected backlog of projects will enable us to
provide a quick turnaround for this project. We are sufficiently staffed with licensed
engineers and designer and our team has the required specialized and in depth resources
necessary to ensure that project assignments will be performed according to schedule.
Scope of Work
The project consists of two phases. Phase I will complete the process of establishing which
of the two options will be fully developed. Phase II will see the full development of
construction documents, permitting, and construction. Both phases will be completed at a
fast paced and focused development in order to meet the City's project schedule.
Facility Performance
Based on the building's designation as an essential services facility, the performance of its
structural systems as well as its non-structural systems and equipment is of great
importance. In this project, IDS will work closely with the City to identify the impact to
systems critical to the facility's continued operation arising from the addition.
Phase I Scope of Work
Phase I will consist of development of the two options from concept to Schematic Design
alternatives with their associated probable costs and recommendations. The evaluation will
include a thorough and detailed review of the structure and systems that would affect the
performance of this Essential Facility. Statements of probable costs associated with the
each alternative will also be developed in this phase in order to allow the City to make
informed decisions regarding the project. We anticipate approximately 3 to 4 meetings with
AA IDS GROUP Page 3
PROPOSAL METHODOLOGY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
the City to discuss the project during this phase. Phase I will conclude with the City's
selection of a Preferred Option Schematic Design.
1. Kickoff I Project Mobilization: Review the project goals and anticipated results along
with our understanding of the project and our plan of project delivery with the City.
Establish standing / periodic meetings and communication protocol. Establish desired
structural performance levels and acceptance criteria and identify permit requirements
for the project, including disabled access compliance, and fire -life safety improvement
requirements. Schedule field reviews and testing.
2. Document Review and Field Reviews: Review the available documents and identify
areas where additional information is required. Visit the facility to investigate and verify
the existing configurations and condition of the structure. If required, the capacity of the
existing foundations as well as any proposed new foundations will be established in
consultation with our geotechnical engineer. Soil boring and sample testing may be
necessary.
3. Preliminary Architectural/ Engineering Systems Analysis: Assess the capacities of the
structural components. Perform preliminary structural I seismic analysis and develop
retrofit schemes with a focus on minimizing facility disruption while balancing cost and
feasibility. Evaluate the proposed Scheme 1 and Scheme 2 in terms of potential impacts
to the facility operations, as well as impacts to architectural features and MEP
components.
4. Develop one Schematic Design each for Option 1 and Option 2: Development of these
preliminary concepts and review of their impact on the Facility as well as their
constructability are important at this stage of the project. IDS will ensure that its work is
focused on the identifying the most probable design solution for each option and
identifying significant roadblocks to their ultimate implementation early in the design.
5. Statement of Probable Cost: Prepare a preliminary Statement of Probable Cost for each
alternative, and present / discuss all options with the City along with their advantages
and disadvantages.
6. Report I Presentation: Submit one Schematic Design each for Option 1 and Option 2
and budget for same, and solicit City feedback. This work includes preliminary work
limits and staging plans for discussion purposes. Update concepts, work plans and costs
as appropriate based on meeting results.
Phase II Scope of Work
Phase 11 consists of the preparation of construction documents and implementation of the
Preferred Option Design and the construction of that Preferred Option. The project design
will include consideration of the facility's location, neighborhood vicinity, and use and
maintenance as a public structure. Sustainable building practices as well as the City's Green
Building design and construction guidelines will provide a basis for the design. This design
will also comply with the current Building Code and standards. Finally, our work will be
closely coordinated with the City in order to meet the project timeline while providing clear
and comprehensive Construction Documents for bid and construction. We anticipate
attendance at regularly scheduled meetings with the City to discuss the project.
A A I DS GROUP Page 4
PROPOSAL METHODOLOGY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
1. Complete Design and Specifications: Prepare analyses, design calculations and
construction drawings and specifications to meet the project goals, building codes and
City standards. This design will provide innovative solutions to minimize disruption of
Facility operations and activities as well as consideration of construction costs. This will
include all necessary architectural, structural, mechanical, electrical, plumbing, fire
protection, and civil design services required for obtaining necessary permits.
2. Field Constructability Review: Take the Preferred Option Schematic Design to the field
to visually confirm constructability, and make adjustments as necessary. A key aspect of
this constructability review is determining potential impacts on building operations and
non-structural systems, and integrating this information into the most cost-effective /
least -disruptive design solution. IDS' in-house experts in architectural, mechanical,
plumbing and electrical systems and engineering will play a key role in helping to
minimize adverse impacts to non-structural systems.
3. Preliminary Statement of Probable Cost: Update the preliminary Statement of Probable
Cost at the Design Development stage to ensure that the project design is on -track and
consistent with the City's plans and budget for project implementation.
4. City Review: Although collaboration with the City will be made throughout the process, a
formal submittal of project documentation at the Design Development stage will be
provided for City review. This submittal will include the probable cost indicated above.
5. Finalize Construction Document Package: Finalization of the Construction Document
package will continue through the City review period, however, this finalization will also
incorporate any comments or concerns identified by the City during their review.
6. Final Field Constructability Review. As the Construction Documents are nearing
completion, IDS will visit the site once more to verify the documents and make
adjustments as necessary based on construction issues or other design items identified.
7. Final Statement of Probable Cost: Prepare a final Statement of Probable Cost based on
the completed Construction Documents. This Statement of Probable Cost will be
provided in sufficient detail to ensure the successful completion of the project within the
approved budget.
8. Project Submittal: Submit the Construction Document package for Plan Check and
provide support through the plan check approval process to obtain the necessary
permits. Any comments received through this process will be incorporated into the
Construction Documents. As the documents are finalized for approval, IDS will perform
final checks to ensure that bid documents comply with all owner and regulatory agency
general conditions, general requirements and construction regulations.
9. Bid Support: Support and assist the City in bidding the project and performing bid
evaluation as requested. Attend a job walk and answer questions from interested
bidders.
AA IDS GROUP Page 5
PROPOSAL METHODOLOGY
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
10.Construction Administration: Provide project management services throughout the
course of the project, including discipline coordination / document checking,
coordination with owner's representatives, data coordination, value engineering analysis,
site analysis, off -site utility studies, materials research / specifications, constructability
reviews and sustainability.
• Attend regularly scheduled meetings to discuss the project.
• Respond to contractor's requests for information and review submittals during
construction.
Provide appropriate on -site observations / job walks during construction to maintain
awareness of the project development and to assure conformance with the contract
documents; prepare deficiency reports if required; provide review and approval of all
items required by the construction contract; evaluate Change Order Requests; provide
supplemental documents for clarification for resolution of conflicts encountered during
construction.
Develop punch lists and recommendations to the City for substantial completion date
and acceptance of all corrective and completion work by the contractor; ensure that all
specified submittal / close-out documents are received prior to payment to the
contractor and are responsive to the intent.
Standards of Work - Deliverables
As a leader in the field of architecture and engineering for building additions and
modifications, IDS is accustomed to providing high quality documents that provide clear and
concise descriptions of the project results. The design furnished under the scope of this
proposal will be of a quality acceptable to the City.
Deliverables will be neat in appearance, organized, and technically and grammatically
correct, and all provided dimensions will be in English units. IDS will at no additional cost to
the City, correct errors, omissions, and any incorrect or improper analysis and / or drafting in
the report that are discovered subsequent to completing the report review process.
City Collaboration
City assistance/support with regards to the following is essential to the timely and cost-
effective completion of this 90 day project. Therefore our proposal assumes:
1. The City provides as -built drawings of the facility
2. That City selection of the preferred option at schematic design is made within one
week
3. Building permit approval can be made without discretionary public hearings
concerning Planning/Zoning (i.e. CUP/Variance/Zone Change or Design Review
Board)
4. Building Permit review and approval completed on an expedited basis
5. Any SWPPP/NPDES processing will be done by the city or by IDS as additional
services.
Additional Assumptions and Exclusions:
A l IDS GROUP Page 6
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
METHODOLOGY
• Any landscape architecture by others than IDS or as additional services by IDS
■ Additional electrical load assumed to not require service upgrade
• Engineering for installation or modification of existing essential facility emergency
electrical power system excluded or provided as additional services by IDS
Creative and Innovative Approach
IDS Group integrates the A/E team into an all-under-one-roof/all-at-the-same-time process.
The architects and engineers of IDS will make the first site visit/investigation together so as
to brainstorm on the spot. This allows for a rapid determination and the most engineering -
friendly schematic design. What IDS proposes at schematic design will be buildable and
cost-effective. This speeds development of the construction documents and the approval of
plans at permit.
Project Schedule
IDS Group is prepared and equipped to provide architectural and engineering services to the
City of Costa Mesa in a timely manner and on relatively short notice so as to enable the
Client to meet critical, and at times unpredictable, deadlines and schedules.
The anticipated I proposed project schedules for this project is outlined below.
Task
As -Built Documentation
Week
0-1
Schematic Design for Two Options: Analysis and Design
2-3
Presentation of Schematic Design: Meet with City (Include Cost Estimate)
3
Receive City Preferred Option Directive
3
Design Development - Preferred Option
4-5
Present Preliminary Design (30% CD) to City and Secure Directives (include
updated cost estimate)
4-5
Construction Documents - Complete to 90%
6-10
Submit 90% Construction Documents to City and to Building Department
10
Plan Check to Permit Ready- Incorporate City'Redlines'
10-13
Permit Ready to Issue - Project Ready for Bid Phase
13
AA IDS GROUP Page 7
PROPOSAL
STAFFING
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Staffing
This seasoned group of professionals has worked independently or teamed on projects with
similar scopes of work. Our expertise and project team is well suited for this project and has
proven success providing A/E services to many Cities in Southern California.
Michael Cecconi, AIA
Robert Freeman, AIA
Jon Higgins, AIA
Gene Diep
John Silber. AIA
David Pomerleau, MS, SE
Victor Mercado, MS, SE
Melissa Kubischta, PE
Satinder Sethee, PhD - Principal Testing Engineer
Felix Touza, PE, LEED AP
Tep Kalambaheti, PE, LEED
BD+C
Stephen Hall, PE, LC, LEED
BD+C
Additional Team Resumes available upon request.
Rami Elhassan, PhD, SE
Michael Sosinski, PE,PP,
QSD/P, LEED AP
Derek Karimoto, PE
Edward (Ted) Riddell, PG, CEG - Project Geologist
Lawrence J.D. Chang, PE - Sr Geotechnical Engineer
AA IDS GROUP Page 8
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
John Silber, AIA
Project Manager
STAFFING
48 Anticipated Hours of Service
Mr. Silber has been an active member of the architecture and urban
design of Southern California for 40 years. His work has covered a broad
range of urban projects, including a number in areas of special interest,
such as the link public education creates between culture and economic
vitality. He has mastered the interface between older buildings and
modern code standards for fire/life safety, energy, and accessibility. Mr. Silber is the former
Architectural Director of the Los Angeles Community Design Center. He has also served as a
Project Architect with Rob Wellington Quigley, FAIA, in San Diego and with Solberg and Lowe,
AIA, of Santa Monica.
Education
• Masters of Architecture, Southern California Institute of Architecture (SCI-ARC)
• Bachelors of Arts, English Literature, University of San Diego
Professional Credentials
■ Licensed Architect: California (#C-15573)
• American Institute of Architects (AIA)
Ram! Elhassan, Ph.D., SE
Principal -in -Charge
24 Anticipated Hours of Service
Mr. Rami Elhassan, PhD, SE, has over 23 years of experience in the
design and analysis of buildings. He has managed and performed
structural design and evaluation services of buildings and structures for
many clients from the private and public sectors.
Education
■ Doctorate, Earthquake and Structural Engineering, University of California, Los Angeles
• Master of Science, Structural Engineering, University of California, Los Angeles
■ Bachelor of Science, Civil Engineering, Aleppo University
Professional Registration
• Professional Structural Engineer: California (#S-3930)
• Professional Civil Engineer: California (#C-46592)
Michael Cecconi, AIA, LEED BD+C
Architect
72 Anticipated Hours of Service
Michael has over 22 years of experience in architecture. His ability to
transfer design intent into instructions for building is exemplary. His work
has covered a broad range of civic and institutional projects and he brings
extensive publicly funded project experience. His overall knowledge of all
the many layers of building systems and ability to coordinate, denote, and
a A IDS GROUP Page 9
PROPOSAL STAFFING
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
manage creates a strong and complete project foundation. Michael will work closely with
client representatives, professional consultants, approval agencies and construction team.
Education
• Master of Architecture, Syracuse University
• Bachelor of Architecture, California State Polytechnic University, Pomona
CSU International Programs - one year study abroad in Florence, Italy
Professional Credentials
• Licensed Architect: California (#C-30141)
• American Institute of Architects (AIA)
• LEED Accredited Professional, Building Design and Construction (BD+C)
Relevant Project Experience
• Ventura County Fire Department - Piru Station #28
David Pomerleau, MS, SE
Senior Structural Engineer
52 Anticipated Hours of Service
Mr. Pomerleau is a licensed California Structural Engineer with over 22
years of structural engineering experience in building analysis and design,
including industrial buildings, government buildings, hospitals, office
buildings, parking garages, schools and theme parks. For his entire career,
David has provided structural engineering consulting services to public
agencies including the federal government, the State of California, local
municipalities including counties and cities, as well as universities and educational
institutions. David has led the IDS design team for many public works projects.
Education
• Master of Science, Engineering, University of California, Irvine
• Bachelor of Science, Civil Engineering, University of California, Irvine
Professional Credentials
• Professional Structural Engineer: California (#S-4537
• Professional Civil Engineer: California (#C-55244)
Relevant Project Experience
• Los Angeles Klinger Center Fire Department buildings.
Felix Touza, PE, CxA, LEED AP
Senior Mechanical Engineer
S Anticipated Hours of Service
Mr. Touza is experienced in all aspects of mechanical design and
construction supervision, working with both consulting firms and
contractors. With over 30 years of experience in HVAC and plumbing
design, he has consulted for numerous facilities, ranging from industrial
and institutional, to schools, hospitals, and food service. Mr. Touza has
also served as an HVAC Project Manager for the design of the Los Angeles
County+USC Hospital; a Senior Engineer in charge of QA/QC; and a Design Project Manager/
Department Head.
IDS GROUP Page 10
PROPOSAL STAFFING
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Education
• Bachelor of Science, Electrical Engineering, University of Havana
Professional Credentials
• Professional Mechanical Engineer: California (#M-26942)
• LEED Accredited Professional
Stephen Hall, PE, LC, LEED BD+C
Senior Electrical Engineer
12 Anticipated Hours of Service
Mr. Hall has over 33 years of experience in the electrical industry,
including experience as an inside journeyman wireman in electrical
construction, field engineering including design, construction and start-up,
and consulting engineering of all types of electrical installations, including
medium voltage electrical design. Stephen has the ability to direct
multidiscipline engineering projects from concept to fully operational status through sound
knowledge of engineering principles, practices and techniques as well as industry standards
and all applicable codes.
Education
■ Bachelor of Science, Electrical Engineering, University of Nevada, Reno
Professional Credentials
• Professional Electrical Engineer: California (#E-16317)
• LEED Accredited Professional, with specialty building design and construction
• Lighting Certified, National Council for the Lighting Professions
Relevant Project Experience
• Design for Prototype Fire Stations City of Las Vegas
• Fire Station #51, City of North Las Vegas -Emergency System Upgrade
Michael Sosinski, PE, PP, QSD/P, LEED AP
Senior Civil Engineer
8 Anticipated Hours of Service
OrMr. Sosinski has over 30 years of nationwide experience in public works
engineering and real estate development. A LEED Accredited Professional
with direct LEED project experience, his areas of expertise in design
include complex hydrologic and floodplain studies, community water
systems, and traffic and transportation improvements. He has led complex
projects through multi -level agency review processes at the local, state,
and federal levels.
Education
■ Bachelor of Science, Civil and Environmental Engineering, Rutgers University
Professional Credentials
• Professional Civil Engineer: California (#C-77582), and New Jersey (#29929)
• Professional Planner: New Jersey (#3084)
• CASQA Certified QSD and QSP (#22786)
• LEED Accredited Professional
A & IDS GROUP Page 11
PROPOSAL QUALIFICATIONS
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Qualifications
The following project profiles demonstrate our extensive experience in approaching and
delivering public agency construction documents, similar to the Renovation/Addition for Fire
Station No. 4 (RFP No. 1166) project.
Orange Fire Department, Fire Station #4
Orange, California
Structural Improvements and Expansion
Dates I Status:
Completed 2011
Project Team:
Rami Elhassan, PhD, SE- Principal
Victor Mercado, SE -Project Engineer
Reference:
City of Orange
Mr. Majid A. Farhat, PE
Director of Design and Construction
714.744.5562
mfarhat@cityoforange.org
Bundy -Finkel Architects
Mr. Timothy Bundy, AIA, LEED AP,
714.850.7575
tbundy@bundyfinkel.com
Fire Station #4 is located in the City of Orange,
California. It is a 1-story Type V building with a
total floor area estimated at 4,130 SF. IDS Group
conducted site investigations and reviewed the
existing structure, and performed detailed
structural analysis. The expansion / upgrade
consisted of the demolition of the existing wood -
framed apparatus bay and the construction of an
expansion in order to provide space for turnout
storage, an exercise room and a larger apparatus
bay. The existing roof diaphragm was evaluated
and retrofitted with new shear transfer and drag
connections. The construction documents of the
structural modifications and expansion also
included improvements to the kitchen, bathrooms,
sleeping quarters, and site walls and the seismic
bracing of non-structural elements.
►. IDS GROUP Page 12
PROPOSAL QUALIFICATIONS
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Ventura County Fire Protection District, Fire Station #28
Piru, California
Seismic Upgrade, Improvements, and Expansion
Dates I Status:
completed 2008
Project Team:
Rami Elhassan, Ph.D., SE -
Engineer of Record
Victor Mercado, MS, SE -Project
Engineer I Construction
Administrator
Michael Cecconi, AIA, LEED AP
Reference:
DeWees Design
Mr. Donnie DeWees, Dir. of
Design
(949) 246-2809
ddewees@socall.rr.com
Fire Station #28, located in Piru, California, is a 1-story
Type V building with a total floor area estimated at
3,450 SF.
IDS Group conducted site investigations and reviewed
the existing structure, and performed detailed seismic
evaluation and retrofit. The seismic retrofit work
included strengthening of the roof diaphragms,
providing shear transfer connections and drag
members, and new shear walls, and the addition of a
new two -bay steel moment frame and foundation at
the apparatus bay doors.
The review of the non-structural elements, including
mechanical, electrical, and architectural elements of
the building revealed that many of these elements are
not adequately braced for seismic loads. Failure of
these elements could lead to falling hazards and
interruption to the operation of this essential facility.
Subsequent to our findings, structural documents for
ofit of the structural and
were developed into
construction documents
o included a 900 SF
ents to the kitchen,
bathrooms, and sleeping quarters.
the seismic upgrade and retr
non-structural elements
construction documents. The
of these improvements als
expansion with improvem
1L , IDS GROUP Page 13
PROPOSAL QUALIFICATIONS
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Santa Monica Fire Station No. 3
Santa Monica, California
Structural Evaluation for Seismic Retrofit
Dates I Status:
February 2013- near completion of
structural evaluation phase
Project Team:
Rami Elhassan, PhD, SE structural
David Pomerleau, MS, SE structural
Melissa Kubischta, PE -structural
Reference:
City of Santa Monica
Mr. Christopher Dishlip, PE, LEED AP
Civil Engineer
310.458.2201 ext 5989
Christopher.dishlip@smgov.net
Background: Fire Station No. 3 is currently active
and serving the northern and central area of the City
of Santa Monica. It was built in the early 1970's,
but several additions have since been made
including a storage room and sleeping quarters. The
City requested a seismic retrofit of the building
which requires ADA/ Accessibility improvements. In
conjunction with the development of the seismic
retrofit plans, IDS reviewed the facility for
accessibility and is developing several options for
removing barriers. Due to the layout of the outdated
spaces, these improvements require modification of
several spaces to provide accessibility and also to
better serve the Fire Station staff. IDS also provided
an Opinion of Probable Cost for the implementation
of the structural upgrades, the accessibility
improvements as well as the retrofit of non-
structural items and equipment.
A_* IDS GROUP Page 14
PROPOSAL QUALIFICATIONS
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
City of La Palma Fire Station
La Palma, California
Architectural and Engineering Services
Dates I Status:
2014/Current Project -In Progress
Project Team:
Rami Elhassan - Principal
John Silber - architectural
David Pomerleau - structural
Melissa Kubischta - structural
Reference:
City of La Palma,
Public Works Dept.
Mr. Michael Belknap,
Community Services Director
7822 Walker Street
La Palma, CA 90623
714-690-3356
mikeb@cityoflapalma.org
Mr. Desi Alvarez, Project Manager
714-690-3311
desia@cityoflapalma.org
IDS is currently performing an architectural and
structural assessment of the Civic Center complex
including the Fire Station for the City of La Palma. The
Civic Center is an 11,619 square foot, 1-story wood -
frame construction structure. The Fire Station includes
a two bay drive -through apparatus, dispatch, living
quarters including kitchen and bath, office areas, and
a day room, radio tower
The facility is currently designated as the City's
emergency response center. The project includes
review of the facilities for essential services
performance in relation to the current Building Code. It
also involves a structural evaluation as well as
evaluation of the architectural finishes and equipment
to determine the magnitude of the seismic upgrades
required to meet that performance. The project also
involves development of an ADA/Accessibility
Improvements and Transition Plan for the facility.
IDS is providing all architecture and engineering
services.
AA IDS GROUP Page 15
PROPOSAL QUALIFICATIONS
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Ventura County Fire Protection District, Fire Station #42
Moorpark, California
Structural Engineering Services
Dates I Status:
2004
Project Team:
Rami Elhassan, PhD, SE -Principal
Victor Mercado, MS, SE -Engineer
Reference:
DeWees Design
Mr. Donnie DeWees, Dir. of Design
(949) 246-2809
ddewees@socall.rr.com
Licenses I Registrations
The project included the new design of a 9,500
square foot, 2-story wood construction fire station for
Ventura County. IDS provided structural engineering
services in support of the design team. The lateral
force resisting -system consists of steel Ordinary
Moment Resisting Frame (OMRF) and Plywood shear
walls. Includes a two bay drive -through apparatus, a
back-up dispatch building, living quarters for eight,
office areas, a day room, radio tower, community
room, and a work-out area. Total construction was
approximately $2,200,000.
All key personnel identified herein hold current licenses to perform their services. All
licenses will remain valid and active during the duration of this project.
Please refer to the Staffing section immediately preceding this section for license numbers
included in the team resumes.
IDS has ADA compliance expertise and is currently completing an ADA transition plan for the
City of La Palma.
* ± IUS GROUP Page 16
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Fee Proposal
PRICING PROPOSAL
FIRE STATION #4 RENOVATION/ADDITION
FEE PROPOSAL
Provide an all inclusive price for each option in accordance with the City's current
requirements, as set forth in section 3 Scope of Work. Also provide your firm's proposed
Staffing Plan on a separate sheet of paper. Proposer should use a separate form to state
pricing for any added value_
Option 1
$ 47,520
Option 2
$ 57,820
Contingent Additional Services
These services may be provided upon request.
AutoCAD Conversion of As -Built Plans $3,500
Geotechnical Investigation $5,500
Pre -Construction Destructive Testing $5,000
Option 1 Staffing Plan
Phaw
Suiting
Taal
Category
Rao
Principal
$180
PM/Arch.
$160
Enginaar
$133
Architect
$135
Sr.CAD
$90
MCkuigrmr
$75
C;Wcsi
$55
Hours
P"
Schematic Design
Hours
121
171
161
161
1 321
88
Fee
Z1601
1,9201
2,1601
Z1601
01
Z4Wj
10,E00
Dwign Dewlopmont
Hours
121
121
161
161
81
201
C
84
Fee
Z1601
1,9201
Z2601
2,1601
720
1,500
0
10,620
Construction Documents
Hours
16
40
24
20
28
I50
fee
2,560
5,400
3,240
1,800
2,100
0
:3d,96O
8
12
16
12
0
1,280
1,620
2,160
0
800
0
Total
376
$47,520
Option 2 Staffing Plan
Phase
staffing
Total
Category
Rate
Principal
$180
PM/Arch.
$160
gngMeer
$135
Architect
$135
Sr.CAD
$90
CAD Designer
$75
Clerical
$55
Hours
Free
Schematic Doslgn
Noun
141
141
201
201
1 401
0
109
Fee
2,5201
Z2401
Z7001
Z7001
01
3,0DO1
0
13,166
Design Development
Hours
-
141
141
201
201
101
241
0
102
Fee
- - Z5201
Z240
- - - 2,7001
Z7001
9001
1,8001
0
1 12,860
Construction Dauments
Hours
26
201
Sol
28'
24MI
180
Fee
4,680
3,200
6,750
3,780
2.160
22,970
Construction ObservationHours
8•
10
14
20
68
fee
1,440
1,600
1,890
Z700
0
Total4$8
$57,820
AA IDS GROUP Page 18
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
Forms and Disclosures
The below forms can be found following this cover page:
1. Ex Parte Communications Certificate
2. Disclosure of Government Positions
3. Disqualifications Questionnaire
EX PARTE COMMUNICATIONS CERTIFICATION
FORMS
Please indicate by signing below one of the following two statements. Only sign one
statement.
I certify that Proposer and Proposer's representatives have not had any communication
with a City Councilmember concerning the Fire Station #4 Renovations/Addition RFP at
any time after December 20, 2013
XV
I certify that Proposer or Proposer's representatives have communicated after
December 20, 2013 with a City Councilmember concerning the Fire Station #4
Renovations/Addition RFP. A copy of all such communications is attached to this form
for public distribution.
*A IDS GROUP Page 19
PROPOSAL
City of Costa Mesa
Fire Station #4 Renovation I RFP No. 1166
DISCLOSURE OF GOVERNMENT POSITIONS
FORMS
Each Proposer shall disclose below whether any owner or employee of the firm
currently hold positions as elected or appointed officials, directors, officers, or
employees of a governmental entity or held such positions in the past twelve months.
List below or state "None."
None.
DISQUALIFICATION QUESTIONNAIRE
The Contractor shall complete the following questionnaire:
Has the Contractor, any officer of the Contractor, or any employee of the Contractor
who has proprietary interest in the Contractor, ever been disqualified, removed, or
otherwise prevented from bidding on, or completing a federal, state, or local government
project because of a violation of law or safety regulation?
Yes No x
If the answer is yes, explain the circumstances in the following space.
IDS GROUP Page 20
AA IDS GROUP