Loading...
HomeMy WebLinkAbout18 - NB-1 - Attachment 4 - 5/20/2014ATTACHMENT + J LINSCOTT LAW 8r GREEN$PAN engineers April 4, 2014 Mr. Donald D. Lamm Diamond Star Associates, Inc. 4100 MacArthur Boulevard, Suite 310 Newport Beach, California 92660 LLG Reference: 2.13.3478.1 Subject: Trip Generation Assessment for the Costa Mesa Motor Inn Project at 2277 Harbor Boulevard Costa Mesa, California Dear Mr. Lamm: Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this Trip Generation Assessment for the proposed Costa Mesa Motor Inn residential project located at 2277 Harbor Boulevard in the City of Costa Mesa. The 176,674-square foot (SF) project site (4.05 acres) is proposed to be developed with 236 apartment units. This letter summarizes the trip generation forecast for the proposed project, and compares the project's tripmaking potential against the existing use (236-room motel), and against the current General Plan Buildout designation for the site under two possible scenarios: (1) presumed as retail with 53,002 SF GLA, and (2) presumed as office with 53,002 SF GFA. Traffic generation is expressed in vehicle trip ends, defined as a one-way vehicular movement, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in Trip Generation, (9th Edition), published by the Institute of Transportation Engineers (ITE) [Washington, D.C., 2012]. Engineers & Planners Traffic Transportation Parking Unsco% Caw & Greenspan, Engineers 2 Executive Circle Su ire 250 Irvine, CA 92614 949.8xs 6M r 949.M6173 F www.11gen gin eers. c ont Pasadena I rvine San Diego Woodland Hills Table I presents the results of the trip generation assessment. The traffic forecast for the proposed project was calculated by applying ITE's Apartment trip generation factors to the 236 dwelling units. As Table I indicates, the project is expected to generate 1,569 daily trips on a typical weekday, 121 AM peak hour trips, and 146 PM peals hour trips. Philip M. Linscott. PE 11924-20MI Jack M. Greenspan, PEIRai, The ITE trip rates for Motels were applied to the existing 236-room motel (assuming W"tiamkIaw,PElReu all rooms are occupied). Comparing the existing trips against the project's ""W.Wilkinson, PE tripmaking potential indicates that the project would result in a reduction of 581 daily John P. Keaong, PE trips and 30 AM peak hour trips, and a nominal increase of 9 PM peak hour trips. John A. ' avid S. , PE ShSherer The trip increment during the PM peak hour is insignificant, especially when Clare M. oaenndrm. PE M.Jaeger, PE distributed over the entire 60-minute period; therefore, on that basis, the proposed RFchard E. Barretto, PE Keil0. Maherry, PE An LU MB Company Fgmded'WO — { J , Mr. Donald D. Lamm April 4, 2014 Page 2 project is not expected to significantly impact any intersections or roadways in the area. The ITE trip rates for Shopping Centers were applied to estimate the trips generated by the current General Plan designation for the project site under Scenario 1, with the site developed as retail, corresponding to 53,002 SF GLA. Under Scenario 1, comparing General Plan Buildout trips against project -generated traffic indicates that the project would generate fewer trips than what has been designated for the site in the General Plan, by 694 daily trips and 50 PM peak hour trips; however, the project would result in an increase of 70 PM peak hour trips that exceed the General Plan's trip budgets for the site. This increment also exceeds the City's 50-peak hour trip threshold for requiring detailed traffic impact analysis (TIA). In order for the project to not exceed the City's TIA criteria, the number of units must be reduced to 197 DU. The ITE trip rates for General Office were applied to estimate the trips generated by the current General Plan designation for the project site under Scenario 2, with the site developed as office, corresponding to 53,002 SF GFA. Under Scenario 2, a comparison between General Plan Buildout trips against project - generated traffic indicates that the project would result in an increase of 984 daily trips, 38 AM peak hour trips, and 67 PM peak hour trips, which exceed the General Plan's trip budgets for the site. The increment of 67 PM peak hour trips also exceeds the City's 50-peak hour trip threshold for requiring detailed traffic impact analysis. In order for the project to not exceed the City's TIA criteria, the number of units must be reduced to 208 DU. We appreciate the opportunity to provide this letter. Should you have any questions, please call me at 949.825.6175. Sincerely, Linscott, Law & Greenspan, Engineers Trissa (de Jesus) Allen, P.E. Senior Transportation Engineer Attachment TABLE 1 PROJECT TRAFFIC GENERATION RATES AND FORECAST 2277 Harbor Boulevard (Costa Mesa Motor Inn), Costa Mesa Daily AM Peak Hour PM Peak Hour .Project Descri tion 2-Way Enter Exit Total Enter Exit Total Trip Generation Factors 1 : ■ ITE 220: Apartment (FF./DU) 6.65 0.10 0.41 0.51 0.40 0.22 0.62 ■ ITE 320: Motel (TElOccupied Rooms) 9.11 0.23 0.41 0.64 0.31 0.27 0.58 ■ ITE 820: Shopping Center (TE11,000 SF GL.A) 42.70 0.60 0.36 0.96 1.78 I.93 3.71 ■ ITE 710: General Office (TE/1,000 SF GFA) 11.03 1.37 0.19 1.56 0.25 1.24 1.49 Proposed Project: • Apartments (236 DU) 1,569 24 97 121 94 52 146 stirs Use. ■ Motel (236 rooms) 2,150 54 97 151 73 64 137 Proposed Project Minus -baisting Use: 0 21 (1 2) 9 General Plan Buildout Scenarl 1: ■ Retail (53,002 SF GI.A assumed) 2,263 32 19 51 94 102 196 Proposed Project Minus (iPB Scenario I: (694) (8} 78 70 0 ■ No. of Apartments Allowable = 197 DU 1,310 20 81 101 79 43 122 to not exceed Cites 50-peak hour trip (953) (12) 62 S0 threshold for requiring 11A General Playa Buddout Scenario 2: ■ General Office (53,002 SF GFA assumed) 585 73 10 83 13 66 79 Proposed Project Minus GPB Scenario 2: 984 87 38 81 67 ■ No. of Apartments Allowable = 208 Dl; 1,383 21 85 106 83 46 129 to not exceed CiWs 50-peak hour trip 798 (5 3) 75 23 70 50 threshold for requiring TIA Notes: [ll Sou e: Trip Geimr den, 91k Fdlrim. Insaime. ofTraWialim FMhi rs rJTF). WashipWn:m. D. C. (20)2). Average rates used MDU - Trip ends per Dwelling Unii DU — Dwelling Unit - I'l