Loading...
HomeMy WebLinkAbout47 - NB-3 - Attachment 6 - 6/17/2014June 10, 2014 Mr. Donald D. Lamm Diamond Star Associates, Inc. 4100 MacArthur Boulevard, Suite 310 Newport Beach, California 92660 Subject: ATTACHMENT 6 LLG Reference: 2.14,3478.1 Trip Generation Assessment for Westside Gateway Costa Mesa, California Dear Mr. Lamm: Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this Trip Generation Assessment for the Westside Gateway residential project located at 671 W. 17' Street in the City of Costa Mesa (ArgoTech property). The 9.01 -acre (or 392,475 -SF) project site is proposed to be developed with a total of 176 residential units, consisting of 41 detached live -work units, 89 attached live -work units, and 46 attached lofts. The total gross floor area for the project is 331,611 SF. This letter summarizes the trip generation forecast for the proposed project, and compares the project's tripmaking potential against the current zoning/General Plan designation for the site (light industrial at 0.35 FAR). Traffic generation is expressed in vehicle trip ends, defined as a one-way vehicular movement, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in Trip Generation, Ninth Edition, published by the Institute of Transportation Engineers (ITE) [Washington, D.C., 2012]. Table I presents the results of the trip generation assessment. The traffic forecast for the project was calculated by first applying the ITE trip generation factors to the 176 residential units, then applying the General Office ITE trip rates to the office component of the live -work units (totaling 39,640 SF). A trip reduction factor of 10% was applied to the office -generated trips to account for the internal trips/synergy attributable to the mixed-use nature of the project. As highlighted in yellow on Table 1, the project is expected to generate 1,557 daily trips on a typical weekday, 146 AM peak hour trips, and 164 PM peak hour trips. The ITE trip rates for General Light Industrial were applied to forecast future trips based on the current zoning and General Plan designation for the project site. Applying the 0.35 FAR to the property size of 9.01 acres (392,476 SF) results in 137,367 SF, which was used as basis for the calculation. The row highlighted in blue Engineers & Planners Traffic Transportation Parking Linscon, Law & Greenspan, Engineers 2Executive Circle Suite 250 Irvine, CA 92614 945.825.6175 T 9d9825.5173 F vmw ilgengineers,com Pasadena Irvine Sail Diego Woodland Hills Philip Limcan,PErrgta-mi Jack M. $teenspa n, PElecri WelIiamA, Law, PE;a"..) Paul W. Wilkinson, PE John Keating, PE David 5. Shender, PE Jahn A Boarman, PE Clare M. Look -Jaeger, PE Richard E. Barrette, PE Keil O. Me berry, PE An i0 2M Company Fwnded IHS Mr. Don Lamm June 10, 2014 Page 2 on Fable 1 indicates that the General Plan Buildout allocation for the site (as light industrial) would generate 957 daily trips on a typical weekday, 126 AM peak hour trips, and 133 PM peak hour trips. Comparing the project's traffic generation against the General Plan's trip budget/allocation for the site indicates that the proposed project would result in an increase of 610 daily trips, 20 AM peak hour trips, and 31 PM peak hour trips. While the proposed project is forecast to generate more traffic than what has been designated in the General Plan, the number of trips are nominal when distributed over the entire weekday and peak hour; therefore, the proposed project is not expected to significantly impact any intersections or roadways in the area, and no further traffic impact analyses are necessary consistent with City of Costa Mesa traffic impact analysis guidelines. We appreciate the opportunity to provide this traffic analysis letter. Should you have any questions, please call me at 949.825.6175. Sincerely, Linscvtt, Law & Greenspan, Engineers Trissa (de Jesus) Allen, P.E. Senior Transportation Engineer Attachment TABLE 1 PROJECT TRAFFIC GENERATION RATES AND FORECAST Westside Gateway (ArgoTecil Site), Costa Mesa xotes: Il] Snume: Trip (knamiiw+, 9th F'rfrirr n, htr+i+r.7e of Trr .wit Nrmi la}Gineers (771), Waehwgfor, AC (1012). Avaap rates used. TF.: Trip Ends ➢U Dwelling Unit SF ..: Square Feet - K3 Daily AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit 'Total Project Description 2 -Way Trip Generation Factors 111: ■ ITE 210: Single -Family Detached Ilousing (TWDU) 9.52 0.19 0.56 0.75 0.63 0.37 1.04 ■ ITE 230: Residential Condo/Townhouse (TEIDU) 5.81 0.07 0.37 0.44 0.35 4.17 0.52 ■ ITF. 710: General Office Building (TE/t,000 SF) 11.03 1.37 0.19 1.56 0.25 1.24 1.49 ■ ITE 110: General Light Industrial (TE11,000 SF) 6.97 0.81 0.11 0.92 0.12 0.85 0.97 Proposed Project (331,611 SF): ■ Detached Live -Work (41 DU) 390 8 23 31 26 15 41 ■ Attached Live -Work (89 DU) 517 6 33 39 31 17 46 ■ Attached Lofts (46 DiJ) 267 3 17 20 16 8 24 ■ Office Portion of Live -Work Units (39,640 SI~) 437 54 8 62 10 49 59 I0% Mixed -Use "Trip Reduction Applied to Office: s I I 'i 1 1 { 0 } 1 : ]h! Total Project Trip Generation: 1,567 66 80 146 82 82 164 General Plan Des' nation for 9.01 -acre Pro"ectSite: 957 111 15 126 15 117 133 ■ Light Industrial at 0.35 FAR (137,367 SF) 957 1 l 1 15 126 16 117 133 General Plan Trip Allocation/Budget. Proposed Project Minus General Plan: 610 0 , � 65 20 66 ?5 i 31 xotes: Il] Snume: Trip (knamiiw+, 9th F'rfrirr n, htr+i+r.7e of Trr .wit Nrmi la}Gineers (771), Waehwgfor, AC (1012). Avaap rates used. TF.: Trip Ends ➢U Dwelling Unit SF ..: Square Feet - K3